Summary

This document appears to be an interim payment certificate for a construction project. It provides a breakdown of costs for various work items and calculations for the total interim payment amount. The current and previous work orders are listed along with totals. The interim payment amount is then calculated by subtracting costs from the subtotal, discounts, deposits and previous interim payments.

Uploaded by

N Fiqah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

Summary

This document appears to be an interim payment certificate for a construction project. It provides a breakdown of costs for various work items and calculations for the total interim payment amount. The current and previous work orders are listed along with totals. The interim payment amount is then calculated by subtracting costs from the subtotal, discounts, deposits and previous interim payments.

Uploaded by

N Fiqah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TAJUK PROJEK :

NO. KONTRAK :

PERAKUAN BAYARAN INTERIM NO:

RINGKASAN BAYARAN

Item Description Previous Current Total


Work Order Work Order Work Order

1 General Conditions & Preliminaries RM -

2 Boring With Boring Plants = #VALUE!

3 Laboratory Testing RM - RM - RM -

4 Reports & Geoinfos RM - RM - RM -

Sub-Total RM 3,000,000 RM - RM - #VALUE!

LESS Discount Factor (19%) #VALUE!

Sub-Total RM - RM - #VALUE!

10 GST RM - #VALUE!

Total RM - #VALUE!

LESS Jumlah Interim Terdahulu RM 2,843,910.00

Bayaran Balik Wang Pendahuluan - - 0.00

Deposit WJP RM 315,990.00

LAD 0.00

TOTAL #VALUE!

Bayaran Diperakukan #VALUE!

LESS 10% WJP (up to 5% of Contract Sum) #VALUE!

Jumlah Bayaran Interim #VALUE!

i) Kepada Kontraktor Utama &Sub-Kontraktor/Penerima Bayaran #VALUE!


ii) Kenaan GST #VALUE!
#VALUE!