Application For Certificate of Compliance General Requirements
Application For Certificate of Compliance General Requirements
General Requirements
(1) Application Form (COC Form No.1)
(2) Company Profile (COC Form No.2)
Application Fee
(3) PhP 10,000
Technical Qualification
(4) General Plant Description (Form No.7)
(5) Location Map
(6) Connection Agreement between the Grid Owner (NGCP) and the Existing
Generation Facility or Interconnection plans/details with the high voltage
backbone transmission system/grid or Distribution System (for Embedded
Generators) and/or Transmission/Distribution Service Agreement, if available
(7) PGC, PDC and WESM Requirements:
(10) Management and/or lease contracts in force (in case the plant is operated,
leased and/or managed by an entity other than the owner);
Financial Capability
(11) Complete set of Audited Financial Statements (AFS) covering the two (2)
most recent twelve (12) month periods, (i.e., balance sheet, income statement,
statement of cash flows, notes, audit opinion and the statement of
management’s responsibility on the financial statements). For a Generation
Company which has been in operation for less than two (2) years, the AFS of
the parent company shall be required in lieu of the above, covering the two (2)
most recent twelve (12)month periods, if available;
(12) Schedule of liabilities, to include the following information: name of
creditor, type of credit, credit terms; and
(13) Five (5) year financial plan.
Ownership/Control
(14) Articles of Incorporation/Partnership (for Corporation / Partnership) with
Certificate of Registration
(15) Business Name Registration Certificate (for Single Proprietorship);
(16) Latest General Information Sheet (GIS) of the applicant-Securities and
Exchange Commission (SEC) Form;
(17) Sworn Statement that the applicant complies with and will continue to
comply with the provisions on cross ownership and market share restrictions
under Republic Act No. 9136, its Implementing Rules and Regulations, and
these Revised Rules for the duration of the COC (Form No.6)
(18) Duly attested comprehensive and complete listing of Affiliates and Related
Groups, including ownership and management structure; and
(19) PSE Certificate to the effect that the Generation Company is listed with
PSE, if applicable
Other Requirements
(20) List of Power Supply Agreement(s), if applicable
(21) Memorandum of Agreement on the Establishment of Trust Accounts by the
Generation Company and/or the Energy Resource Developer and the
Department of Energy on Benefits to Host Communities pursuant to Rule 29 of
the IRR of R.A. 9136
(22) Environmental Compliance Certificate (ECC) duly approved by the
Department of Environment and Natural Resources (DENR)
(23) Permit to Operate (PTO) duly issued by the Department of Environment and
Natural Resources (DENR);
(24) Department of Energy (DOE) Endorsement indicating that the Power Plant
Project is consistent with the Power Development Program of the Government
or with the Missionary Electrification Development Program (MEDP) for power
plant project located in isolated grids
(25) In the case of a Generation Company operating an RE plant that intends to
avail of the FIT:
(25.1) DOE issuance of Confirmation of Commerciality confirming the
commercial viability of the project;
(25.2) DOE Confirmation of Electromechanical Completion; and
(25.3) DOE Certificate of Endorsement for FIT Eligibility.
(26) Such other information or document that the ERC may require. Any
additional technical information may be required by the ERC upon prior notice
to the applicant.