1. During the analysis phase of the SDLC the systems analyst will decide how the hardware, software
and network infrastructure, user interface, forms and reports will be used.
Answer: True
2. The infrastructure analyst is responsible for the design of the new business policies and processes.
Answer: False
3. The role of the project manager includes managing the team members, developing the project
plan, assigning resources and serving as the primary point of contact for people outside the
project team.
Answer: True
4. The project manager is responsible for ensuring that the project is completed on time and within
budget and that the system delivers all benefits that were intended by the project sponsor.
Answer: True
6. An analyst with business skills that understands the business issues surrounding a system is
commonly called a project manager.
Answer: False
7. An analyst that focuses on the technical issues of the organization (hardware, software, databases
and networks) is commonly called a change management analyst.
Answer: False
8. Scott has been assigned to focus on the users during the upcoming information systems
installation. Scott will provide user training and documentation. His role is to serve as a change
management analyst.
Answer: True
9. Michelle has been assigned the task of completing the project in a timely manner and within
budget. Her project team role is infrastructure analyst.
Answer: False
10.Database administrators focus on physical database design and optimizing the performance of
the database system.
Answer: False
Part B: Multiple Choice
1. The process of understanding how an information system can support business needs, design
the system, build it, and deliver it to users is the .
a. Object oriented approach
b. rule for creating a CASE tool
c. systems development life cycle
d. waterfall development methodology
2. The person that identifies opportunities for improvements and designs an information
system to implement them is called a(n) .
a. computer programmer
b. end-user
c. systems analyst
d. systems specialist
9. Interfaces (e.g., menus, reports, forms) are specified during the phase of the SDLC.
a. analysis
b. design
c. implementation
d. planning
10. The phase of the SDLC when the system is actually built or purchased is the .
a. analysis
b. construction
c. design
d. implementation
1. Compare the phases of the Rational Unified Process with the phases of the waterfall model.
2. What are the key factors in selecting a methodology?
3. Describe the principle steps in the planning phase. What are the major deliverables?
4. What are the roles of project sponsor and the approval committee?
Answer Part C
1. Compare the phases of the Rational Unified Process with the phases of the waterfall model.
Waterfall
Waterfall model is usually in an order or highly structured that required careful planning and
detailed task. The five-phase of the Waterfall model is planning, analysis, design, implementation,
system. It works well for a big or complex project and this model process suitable long-term
projects. Moreover, this model is not flexible, do not provide business value and the budget is
usually fixed.
3. Describe the principle steps in the planning phase. What are the major deliverables?