Typical Detail of Slab: Schedule of RCC Slabs (Level: First Floor Slab)
Typical Detail of Slab: Schedule of RCC Slabs (Level: First Floor Slab)
SO 5" T8 @ 4" C/C BENT BACK AT BOTTOM MIN. CANT. SPAN NEED
MAIN STEEL FROM S2,S4 PROVIDE IN BACK SPAN
ST1,ST2,ST3 7" PROVIDE SCISSOR JOINT
T10 @ 4" C/C ALT BENT UP T8 @ 6" C/C DIST @ RESP.UPPER LANDING
ST3 7" T10 @ 4" C/C ALT BENT UP MAIN STEEL FROM ST1,ST2 MIDLANDING