0% found this document useful (0 votes)
613 views

Junction Box and Local Control Panel Quality Control and Inspection Report Form

This document is a field inspection report form for inspecting junction boxes or local control panels. It includes sections for inspection details like type, work and item numbers, location, signatures of inspectors from the company and contractor. The results can be approved, approved with comment, require re-inspection, or not approved. There is a checklist of items to inspect like equipment being de-energized, enclosure mounting, gaskets, bolts, tagging, nameplates, terminals, unused entries, drawings, supports, earthing. Remarks can also be included.

Uploaded by

Jpa Yudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
613 views

Junction Box and Local Control Panel Quality Control and Inspection Report Form

This document is a field inspection report form for inspecting junction boxes or local control panels. It includes sections for inspection details like type, work and item numbers, location, signatures of inspectors from the company and contractor. The results can be approved, approved with comment, require re-inspection, or not approved. There is a checklist of items to inspect like equipment being de-energized, enclosure mounting, gaskets, bolts, tagging, nameplates, terminals, unused entries, drawings, supports, earthing. Remarks can also be included.

Uploaded by

Jpa Yudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

www.Inspection-for-Industry.

com
ITP No.:
INSPECTION GR.
FIELD INSPECTION REPORT REPORT NO.
DATE
Quality Control Form
INSPECTION TYPE WORK No.
ITEM No.
JUNCTION BOX / LOCAL CONTROL PANEL
LOCATION
SIGNATURE
INSPECTION NOTICE NO.: COMPANY CONTRACTOR SUBCONTRACTOR
COMPANY’S INSPECTOR: / / / / / /
CONTRACTOR INSPECTOR:
SUBCONTRACTOR INSPECTOR
INSPECTION RESULTS WITNESSED
APPROVED COMPANY
APPROVED WITH COMMENT CONTRACTOR
RE-INSPECTION REQUIRED
NOT APPROVED
FOR INFORMATION ONLY

CHECK LIST
Check equipment is de-energized and safe.
Check enclosure in correctly mounted and easily accessible.
Check all gaskets and bolts are fitted in covers and gland plates where applicable (Exe).
Check enclosure is correctly tagged as per drawing.
Check nameplate data/certification is in accordance whit project data.
Check that terminals are approved and that the correct numbers are fitted (refer to manufacture certificates).
Check all unused entries are plugged with approved blanks.
Produce marked-up drawings in accordance with installation.
Check that junction box / local control panel supports are adequate and protected against vibration.
Earthing to be installed effectively.

REMARKS:

Legend NA: Not Applicable