Roles & Responsibilities: Ref.: Rev.: Date

The document outlines the roles and responsibilities of the Head of Quality Assurance position. Key responsibilities include planning quality resources and audits, reviewing product rejection trends, ensuring inspection records are maintained, analyzing rejections and initiating corrective actions, participating in defect investigations, coordinating training programs, maintaining inspection equipment, implementing process improvements, supporting quality document updates, and preparing management reports. The position is expected to interact regularly with team leaders from various departments and assume product release authority in the absence of superiors.

Uploaded by

Dhinakaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
180 views

Roles & Responsibilities: Ref.: Rev.: Date

The document outlines the roles and responsibilities of the Head of Quality Assurance position. Key responsibilities include planning quality resources and audits, reviewing product rejection trends, ensuring inspection records are maintained, analyzing rejections and initiating corrective actions, participating in defect investigations, coordinating training programs, maintaining inspection equipment, implementing process improvements, supporting quality document updates, and preparing management reports. The position is expected to interact regularly with team leaders from various departments and assume product release authority in the absence of superiors.

Uploaded by

Dhinakaran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Ref.

:
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :
Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: HOD- Quality Assurance


Working Frequency
Next
Sl. As and Cross functional
Responsibility Hierarchy
No. D W F M Q H Y when position to interact
Level
required
Planning the resource (Equipment and Man)
1 requirement for the year with respect to Annual plan      -do- HOD-HR
and ensure the same.

Review the status of the process audits & reviewing GM HOD Eng/
2
the reports      Operations Production/Maintenance

GM-Operations / All
4 Review the status of Product Rejection Trends     -do-
functional HODs
Planning and work allotment for inspection of Team Leaders - STR /
5
Inprocess & finished products  HOD-QAD
PRD
Ensure maintenance of records of Inprocess, final
6
product inspection activities    -do- -

Review the status of Rejections/Slippages Data Team Leaders - STR /


7
Analysis and initiating Corrective Actions     -do-
PRD / PUR
Ensure availability of latest version of specifications Team Leader -
8
/ Standards    -do-
Engineering
Team Leaders - STR /
9 Participating in defect investigation     -do-
PRD / PUR

10 Co-ordinating in operators Training programs     -do- -

Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly


Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: HOD- Quality Assurance


Working Frequency
Next
Sl. As and Cross functional
Responsibility Hierarchy
No. D W F M Q H Y when position to interact
Level
required
Team Leader -
12 IMTE Maintenance including calibration    -do-
Calibration Lab
Team leader Eng/
14
Ensuring the deviation treciability& ECN implementation     -do-
Production/
Team leader Eng/
15 Identifying and implementing the process improvements      -do-
Productio
17 Support in QMS documents updation & maintenance     -do- Team leader QMD

18 Final product release authority in the absence of superior     -do- HOD Eng/ Production
Prepare Management Information reports as per the defined
19
frequencies.     GM-Operations

19.1 Review the status Product Rejection Trends      -


Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: Assistant .Manager- Quality Assurance


Working Frequency
Next
Sl. As and Cross functional
Responsibility Hierarchy
No. D W F M Q H Y when position to interact
Level
required
Head
1 Ensure supply of quality product to the customer         Operations
All functional HODs

Review the quality data (IGI, In process, FQA


HODs/Team leaders -
2 Inspection) and initiating Corrective Actions where         -do-
STR /PRD /PUR
required

3 Approve the Control plans        -do- -


HODs/Team leader - STR
4 Participating in defect investigationVendoR        -do-
/PRD /PUR/ENG
Approve SPC audit plan, MSA plan and ensure its HOD/Team Leaders -
5
compliance         -do-
Production
Co-ordinate in identification and implementation of
6
Continual Improvement projects
       -do- -do-

Responsible in taking corrective actions with respect Head


7
to customer complaints and providing 8D report         Operations
HOD - PRD / ENGG

Ensure implementation of Quality systems in all


8
functions of the organization
        -do- All functional HODs

Identifying the training needs and providing training


9
to QA team members.        -do- HOD-HR

10 Review of CSI/COPQ        -do- All functional HODs

Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly


Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: Assistant .Manager- Quality Assurance


Working Frequency
Next
Sl. As and Cross functional
Responsibility Hierarchy
No. D W F M Q H Y when position to interact
Level
required
Planning the resource (Equipment and Man)
13 requirement for the year with respect to Annual plan        -do- HOD-HR
and ensure the same.

15 Authorized for final product release to customer         -do- HOD- Eng/PRD

Authorized to take decision on IGI, In process, FQA


16 rejected Items deviations after considering customer        -do- HOD - PRD / ENGG
requirement.
Ensuring the deviation traceability & ECN
17
implementation
       -do- Team leader R&D/ PRD

Arranging Management Information Reports as per the


18
defined frequencies
       Head-Operations

Head Head-Operations / All


18.1 Review the Quality objectives & targets        Operations functional HODs
Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly
Ref. :
Page :
ROLES & RESPONSIBILITIES Rev. :
Date :

Job Position: engineer - Inward Goods Inspection


Working Frequency
Job Position: Engineer –In Process (HUPS & ESDM)
As and
Next
Cross functional position to
Sl. No. Responsibility Hierarchy
D W F M Q H Y when interact
Level
required
Inspection and release of Inward goods as per Quality
1
Plan         QA-HOD Team Leader-PPC/PM/PUR

2 Clearing the inspected items         -do- Team Leader-PPC/PM/PUR

Preparation and maintenance of Inspection reports, Team Leader- PPC/PM/PUR


3
rejection reports and related registers.        -do-
/Stores
Reporting quality related problems to the concerned Team Leader-
4
departments         -do-
PPC/Projects/Purchase/SQE

5 Re-inspection of reworked / rectified materials.         -do- Team leader-Purchase/SQE

Team leader-Team leader-


6 IMTE maintenance including calibration  -do-
Calibration Agencies
Team Leader-
8 Ensuring and maintaining the parts specification         -do-
PPC/Projects/QA/PRD

9 Ensure to reduce inprocess Slippage         -do- Team Leader-QA SQA

Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly


Ref. :
Page :
ROLES & RESPONSIBILITIES Rev. :
Date :

Job Position: - Inward Goods Inspection&Vendor development


Working Frequency
Job Position: Engineer –In Process (HUPS & ESDM) Next
As and Cross functional position
Sl. No. Responsibility Hierarchy
D W F M Q H Y when to interact
Level
required

Team Leaders -
10 Initiating the actions for in process related rejections   -do-
PUR/PRD/TES/SQE

11 Inward inspection rejection summary report updation     -

Team Leader-
12 Interactions against Inward rejections   -do-
SQE/Purchase

13 GRNs clearance trends    -

14 Monitoring the vendor rating & work to improve it.         -do- QA,PRD,Purchase

Conduct meeting for critical vendors monthly for the


15
improvement         -do- QA,PRD,Purchase

Empowerment: Based on rejections level monitoring


17 he can take decision on developing new vendor with         -do-
cost benefit inform to CFT
Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly
Ref. :
Page :
ROLES & RESPONSIBILITIES Rev. :
Date :

Job Position: Engineer –In Process (HUPS & ESDM)


Job Position: Inspectors - Inward Goods Inspection
Working Frequency
Next
Sl. As and Cross functional
Responsibility Hierarchy
No. D W F M Q H Y when position to interact
Level
required
Team Leaders - Stores /
1 Inspection and release of Inward goods as per Quality Plan  Quality Eng
PUR
Preparation and maintenance of IGI / rejection reports Team Leaders - Stores /
2
and related registers  -do-
PUR
Team Leaders -
3 Clearing the inspected items   -do- Engineering / Stores/
PPC/PUR
Reporting quality related problems to the concerned Team Leaders -
4
departments    -do-
PUR/Stores/PPC
Team Leaders -
5 Re-inspection of reworked / rectified materials.   -do-
PUR/Stores/PPC

Empowerment:Authorize the status, accepted,


deviation, and hold to release, and rework tags in process
6 and inward material Checking and signing of Material  
Inspection Reports, Non-conformance Material Inspection
reports, in the absence of Engineer.

Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly


Ref. :
Page :
ROLES & RESPONSIBILITIES Rev. :
Date :

Job Position: engineer- Customer compliant handling


Job Position: Engineer –In Process (HUPS
Working & ESDM)
Frequency
Next
Sl. As and Cross functional position to
Responsibility Hierarc
No D W F M Q H Y when interact
hy Level
required
Acknowledging customer complaint within 24hrs through
1
mail   QA-HOD Project Management

Take lead in calling cross functional Team for customer Team Leaders –PRD/Eng/
2
complaint analysis   -do-
PM/Stores

Preparation of 8D and sending report within defined Team Leaders –PRD/Eng/


3
timelines     -do-
PM/Stores

Empowerment:Authorize to take decision on units


4 acceptance, deviation, reject and hold to release for    -do-
containment action in 8D report in absence of HOD-QA
Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly
Ref. :
Page :
ROLES & RESPONSIBILITIES Rev. :
Date :

Job Position: engineer- In Process


Job Position: Engineer –In Process
Working(HUPS
Frequency
& ESDM) Next
Sl. As and Cross functional position to
Responsibility Hierarchy
No D W F M Q H Y when interact
Level
required
1 Planning and work allotment for Quality inspectors  QA-HOD Team Leaders - Production

2 Ensure availability of latest version of Documents   -do- Team Leaders - Engineering

3 Ensuring the setup approval     -do- -do-


4 Ensuring the in process inspection    -do- -do-
Team Leaders - Production /
5 Ensure maintenance of all the activities records   -do-
Eng
Participating in CFT meetings for New Sample Build ,
Team Leaders - Production/PM
6 Pilot Lot productions & regular production where ever    -do-
/Engineering.
required
Participating in defect investigation & Analyzing the
7
problems     QA-HOD -do-

8 Ensuring the calibration of the equipment's    QA-HOD Team Leaders - Production/Eng


10 Updation of deviation & /ECNs details    -do- Team Leaders - Prod/PM /Engg
Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly
Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: Engineer- In Process


Working Frequency
Next
As and Cross functional position
Responsibility Hierarchy
Sl. No D W F M Q H Y when to interact
Level
required
Preparing the checklist or setup approvals for critical
14
and inspection stages     -do- -do-

15 Conduct Process and Product audit as per audit plan     QA-HOD HODs/Team leader - PRD
HODs/Team leader - PRD
16 Collecting and consolidating COPQ data from CFT     -do-
/Eng/ QA
Ensure operator qualification & skilled manpower
19
usage     -do-

20 Ensure master, limit samples at each stage     -do- Team leader – PRD-Eng
Empowerment: Authority to take decision in the
line for the non-conformances like line rejections, to
21 clear In process rejected materials, to disqualify    
untrained operators, to analyze &solve the customer
complaints and take corrective & preventive actions
Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly
Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: Inspector- In Process


Working Frequency
As and Next Hierarchy Cross functional
Responsibility
Sl. No D W F M Q H Y when Level position to interact
required
Giving the set up approvals and checklist to the  Team leader - PRD
1
critical stages     Eng-In process
/Engg
2 Conduct the in process inspection     -do- -do-
Inspecting the finished goods and clearing the lots   -do-
4
for dispatch   Eng-In process
Reporting quality related problems to the  -do-
5
concerned departments    Eng-In process

6 Preparation and maintenance of reports    -do- -do-


Re- inspection of rectified/ reworked lots where   -do- -do-
7
ever required  
Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly
Ref. :
ROLES & RESPONSIBILITIES Page :
Rev. :
Date :

Job Position: Engineer – PDI


Working Frequency
Next
As and Cross functional
Responsibility Hierarchy
D W F M Q H Y when position to interact
Level
Sl. No. required
1 Ensuring the PDI lot clearance  QA-HOD Team Leaders-PRD
Preparing Checklist/formats for all the products
2
related to FQA     -do-
Team Leader- Dispatch
3 Ensuring the PDI lot clearance as per dispatch plan     -do-
& production
Team Leaders-PRD/
4 Ensuring the maintenance of all relevant reports     -do-
Eng
Team Leaders-
5 Co-coordinating in inspectors training programs     -do-
PRD/Eng
Participating in defect investigation & Analyzing Team Leaders-PRD/
6
the problems     QA-HOD
Eng
Preparing the daily, Weekly and monthly rejection Team Leaders-
7
data and updating the trends      QA-HOD
PRD/Eng
Participating in CFT meeting for New Sample Build
8
, Pilot Lot production     QA-HOD -do-

Empowerment :He will be responsible for any lot


9 rejections to take corrective and preventive        
actions.

Legend :D-Daily, W-Weekly, F-Fortnightly, M-Monthly, Q-Quarterly, H- Half yearly, Y- yearly


Ref. :
Page :
KEY PERFORMANCE INDICATORS & OBJECTIVES & Rev. :
TARGETS Date :

Common Responsibilities
Working Frequency
Next
Sl. As and Cross functional position to
Responsibility Hierarchy
No. D W F M Q H Y when interact
Level
required

1 Implementing 5 S practices         - -

Monitoring KPIs & OATs trends, cost of poor


2
quality, take corrective actions where required       - -

3 Ensure closing of NCRs and APIs within the EDCs         - -

Presenting data in Monthly / Management


4
Representative Meetings        - -

Identification and implementation of Continuous


5
improvement programs
       - -

Co-ordination of internal / External audits


6
(Including customer audits)         - -

Identify / evaluate competency requirements of


7 the department personnel and provide training or         - HOD-HR
initiate any appropriate action