0% found this document useful (0 votes)
29 views

TABLE 1 Enclosure Symbols TABLE 3 Signal Processing Symbols: Notes

This document contains tables of common symbols used in engineering documentation. Table 1 lists enclosure symbols such as boxes and lines to represent physical enclosures. Table 2 lists processed signal continuation symbols such as arrows and dashed lines. Table 3 lists logic symbols such as AND, OR and greater/less than. The document provides a key of standard symbols engineers can use to visually communicate electrical, mechanical and process information in diagrams and drawings.

Uploaded by

Rudi Hermawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

TABLE 1 Enclosure Symbols TABLE 3 Signal Processing Symbols: Notes

This document contains tables of common symbols used in engineering documentation. Table 1 lists enclosure symbols such as boxes and lines to represent physical enclosures. Table 2 lists processed signal continuation symbols such as arrows and dashed lines. Table 3 lists logic symbols such as AND, OR and greater/less than. The document provides a key of standard symbols engineers can use to visually communicate electrical, mechanical and process information in diagrams and drawings.

Uploaded by

Rudi Hermawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES :

TABLE 1 Enclosure Symbols TABLE 3 Signal Processing Symbols

or

/n AND

or OR

K or P >n GTn

or <n LTn

d/dt or D =n EQn

S,SO

R,RO
P L T U T E M B I L A H A N ( 2 x 7 MW ) C CIVIL
O
CONTRACTOR DOCUMENT REVIEW N MECH
PD T
LOG DATE : R ELECT
IN COMM NO : E I&C
f LT V
A APPROVED I PROCESS
E
B APPROVED AS NOTED W PIPING
A D
C NOT APPROVED CONTRACTOR
I
I INFORMATION RECORD
Q D S
APPROVAL DOES NOT RELIEVE CONTRACTOR T WORKING DOCUMENT
FROM RESPONSIBILITY FOR ERROR OR R
DEVIATIONS FROM CONTRACT I
> E REQUIREMENTS B
U
TABLE 2 Processed Signal Continuation Symbols < F
BY DATE : T
I
LOG DATE :
O
OUT COMM NO : N
> H

< I

-K or -P O
REV STATUS MODIFICATION DATE DESIGN CHECK REVIEW APPR
V< P

R AGENCY OF THE MINISTRY OF MINES AND ENERGY


GOVERMENT OF THE REPUBLIC OF INDONESIA

f(t)

T
The on-off signal symbol may be a solid line if on a separate digital logic diagram or if on an insert
detail on a functional diagram. H/, H/L, /L

REV SIZE A3

DATE SCALE NTS DWG No. SHEET

You might also like