The document provides a progress update for construction of a 132kV transmission line from Rajgarh to Biaora by Unitech Power Transmission Limited. As of the date, 18 of the 86 foundations have been completed and no towers have been erected. Of the 23.552km line, no conductor stringing has been done. Foundation work is progressing at a rate of 1 tower per week. There are material shortages of tower stubs, super structures and tower extensions that could impact future progress. Crossing details along the alignment include highways, existing power lines, railways and rivers/canals.

Uploaded by

satyabannayak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Visual Chart Transmission Line

The document provides a progress update for construction of a 132kV transmission line from Rajgarh to Biaora by Unitech Power Transmission Limited. As of the date, 18 of the 86 foundations have been completed and no towers have been erected. Of the 23.552km line, no conductor stringing has been done. Foundation work is progressing at a rate of 1 tower per week. There are material shortages of tower stubs, super structures and tower extensions that could impact future progress. Crossing details along the alignment include highways, existing power lines, railways and rivers/canals.

Uploaded by

satyabannayak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

CLIENT: POWER GRID CORPORATION OF INDIA L

UNITECH Power Transmission Limited, Rajgarh (M


VISUAL CHART ---> 132 KV D/C RAJGARH- BIAORA TRANSMISSIO
Progress as on Dated
Sl.No. Activity Unit Total Comp. Balance Rough SagSTRINGING COMPLETED Paying out
1 Detail Survey Kms. 23.552 - 0
2 Check Survey Kms. 23.552 - 0.000
3 Foundation Nos. 86 18 68 Erection Complete
4 Earthing Nos. 86 18 68 Excavation U/P
5 Erection Nos. 86 0 86 FDN. COMP. SPAN SPAN
6 Tackwelding Nos. 86 0 86
7 Stringing Kms. 23.552 0.000 23.552 EARTHING TACK WELDING

GANTRY D/E AP 1 1/1 AP 2 AP 3 AP 4 AP 5

46.0 246.0 325.0 322.0 340.0 322.0 291.0 345.0

E60 +0 E30 +10 E0 +6 E30 +6 E30 +10 E60 +10 E6O +10

AP 6BR AP 6CR AP 6DR AP 6ER AP 7R AP 7/1A 7/1

303.0 325.0 110.0 173.0 242.0 210.0 288.0 248.0


CLIENT: POWER GRID CORPORATION OF INDIA L
UNITECH Power Transmission Limited, Rajgarh (M
VISUAL CHART ---> 132 KV D/C RAJGARH- BIAORA TRANSMISSIO
WIP
E60 +3 MC60 +0 MC60 +0 MC60 +0 E60 +10 E0 +6 E0 +3

8/4 AP 9 AP 10 10/1 10/2 10/3 AP 11

345.0 311.0 219.0 300.0 244.0 272.0 275.0 286.0

E0 +10 E60 +3 E60 +10 E0 +10 E0 +6 E0 +6 E60 +0

15R/1 15R/2 15R/3 AP 16 16/1 16/2 16/3R

320.0 299.0 271.0 231.0 280.0 316.0 282.0 304.0

E0 +10 E0 +6 E0 +0 E60 +0 E0 +3 E0 +0 E0 +6
CLIENT: POWER GRID CORPORATION OF INDIA L
UNITECH Power Transmission Limited, Rajgarh (M
VISUAL CHART ---> 132 KV D/C RAJGARH- BIAORA TRANSMISSIO

17/2R 17/3R 17/4R 17/5R 17/6R AP 18R 18R/1

325.0 333.0 335.0 320.0 310.0 328.0 230.0 220.0

E0 +6 E0 +3 E0 +3 E0 +3 E0 +6 E30 +0 E0 +0

AP 18DR 18DR/1 AP 19 19/1 19/2R 19/3 AP 20

305.0 233.0 247.0 301.0 350.0 317.0 345.0 214.0

E60 +3 E0+0 E60 +0 E0 +6 E0 +6 E0 +10 MC60 +3

21/5 21/6 21/7 AP 22 22/1 22/2 AP 23

338.0 338.0 338.0 329.0 290.0 290.0 291.0 290.0


CLIENT: POWER GRID CORPORATION OF INDIA L
UNITECH Power Transmission Limited, Rajgarh (M
VISUAL CHART ---> 132 KV D/C RAJGARH- BIAORA TRANSMISSIO
WIP
E0 +6 E0 +3 E0 +6 E60 +3 E0 +6 E0 +3 E30 +0

AP 28 D/E Gantry
TSS
BIAORA

198.0 130.0 30.0


WIP WIP
E30+0 E60+0 GE+0

Work Completed till Work done in current


Description Total Work to be Done
last week week
Total Progress

Stub setting 86 17 1 18
Tower Erection 86 0 0 0
Gantry Foundation/Erection 0 0 0 0
Stringing 23.552 0 0 0
Detailed Survey 23.552 23.552 0 23.552
Check Survey 23.552 23.552 0 23.552

Tower Foundation Gang 1 Tower Foundation of week 1


Tower Erection Gang 0 Tower Foundation of week 0
CLIENT: POWER GRID CORPORATION OF INDIA L
UNITECH Power Transmission Limited, Rajgarh (M
VISUAL CHART ---> 132 KV D/C RAJGARH- BIAORA TRANSMISSIO

REQUIREMENT OF TOWER MATERIAL


STUB
Quntity Details
EO E30 E60 MD60 MC60
Required 46 11 19 1 9
Availbility 45 5 10 0 0
Balance 1 6 9 1 9

TOWER EXTE
Super Structure 3 Mtr 6 Mtr/5M
Quntity Details
EO E30 E60 MD60 MC60 EO E30 E60 MC60 EO E30
Required 46 11 19 1 9 13 3 5 1 23 2
Availbility 42 6 9 0 0 8 1 0 0 18 1
Balance 4 5 10 1 9 5 2 5 1 5 1
INDIA LIMITED
ajgarh (MP)
ANSMISSION LINE

ng out Crossing Detail

ation U/P Gas Pipe Line


River/Canal
NH/SH 132KV/220KV/400KV Railway

5/1 AP 5AR 5A/1R AP 6AR 6A/1R

255.0 270.0 268.0 312.0


WIP
E0 +6 E30 +3 E0 +3 E30 +0 E0 +3

7/2 AP 8 8/1 8/2 8/3

248.0 220.0 260.0 328.0


INDIA LIMITED
ajgarh (MP)
ANSMISSION LINE
WIP
E0 +0 E30 +3 E0 +0 E0 +3 E0 +3

AP 12 AP 13 13/1R AP 14R AP 15R

208.0 348.0 176.0 182.0

E60 +3 E60 +0 MC60 +0 MC60 +6 MC60 +6

16/4 16/5 16/6 AP 17 17/1R

280.0 320.0 303.0 260.0

E0 +6 E0 +6 E0 +3 E30 +3 E0 +6
INDIA LIMITED
ajgarh (MP)
ANSMISSION LINE

18R/2 18R/3 AP 18AR AP 18BR AP 18CR

270.0 273.0 234.0 197.0

E0 +6 E0 +3 E60 +6 MC60 +0 MC60 +0

AP 21 21/1 21/2 21/3 21/4

330.0 345.0 331.0 338.0


WIP WIP
MD60 +5 E0 +6 E0 +6 E0 +6 E0 +6

23/1 AP 24 AP 25 AP 26 AP 27

290.0 190.0 145.0 105.0


INDIA LIMITED
ajgarh (MP)
ANSMISSION LINE

E0 +6 E30 +6 E60 +10 E60 +10 E60 +6


INDIA LIMITED
ajgarh (MP)
ANSMISSION LINE

RIAL

TOWER EXTENSIONS
6 Mtr/5Mtr 10Mtr
E60 MD60 MC60 EO E30 E60 MD60 MC60
2 1 2 4 2 6 0 0
2 0 0 0 0 0 0 0
0 1 2 4 2 6 0 0