Commissioning Flowchart
Commissioning Flowchart
O
Notes Construction EPC Commissioning LOTO O&M &
M
ECC issuance
Schedule SRCC
Walk down
No
Commissioning
Procedures
Work package (consists of
procedures , method
statements, HIRA, JSA , PJB,
permits etc ) available at HIRA & JSA
site with EPC
PJB
Clearance
Site verbal communication
Activity Pre-commissioning
Checklist
Commissioning
Activity
Checklist
Record Protocol
PJB
Clearance
Starting / Stopping
Equipments
Yes
No
Rectification
under Permit
NOTES:
* All communications at site to be done with Walkie talkie only.
* Protocols to be submitted immediately after commissioned as per contractual requirement.
* JSA and PJB to be strictly checked prior to start of any activity.
* Commissioning to be done as per commissioning procedures and method statements.
* Commissioning Safety Rules to be followed by EPC.
* PTW to be strictly adhered by EPCs.
* Issues occurring during commissioning and post commissioning to be captured in issue tracker.