Date Machinery Manpower: SR No

The document is a daily log of machinery and manpower usage on a construction site from March 3rd to April 13th. It records the number of equipment like excavators, tractors, and vehicles used each day along with the total labor. Some days saw no work due to rain. Machinery and staffing levels fluctuated from day to day based on the construction activities.

Uploaded by

Iqrar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Date Machinery Manpower: SR No

The document is a daily log of machinery and manpower usage on a construction site from March 3rd to April 13th. It records the number of equipment like excavators, tractors, and vehicles used each day along with the total labor. Some days saw no work due to rain. Machinery and staffing levels fluctuated from day to day based on the construction activities.

Uploaded by

Iqrar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 35

SR NO DATE MACHINERY MANPOWER

TRANSIT MIXTURE

BATCHING PLANT
TRACTOR TROLLY

LAB TECHNICIAN
TRACTOR BLADE

WATER BOWZER

CONSULTANT
Plant LabOR

SUPERVISOR

LAB HELPER
EXCAVATOR

OPERATOR

SURVEYOR
VIBRATOR

Mechanic
DUMPER

LABOUR
LOADER

MASON
ROLLER

Helper
F.M
1 3-Mar-15 11 2 12 0 0 ~ 12 1 0 1 38 0 0 0 8 0 2 2 4 0 0 0

2 4-Mar-15 5 1 16 7 2 ~ 1 2 3 1 38 4 1 18 18 2 2 2 4 2 1 2

3 5-Mar-15 no work due to rain

4 8-Mar-15 15 4 25 7 2 ~ 15 3 ~ 1 72 4 1 14 28 1 3 3 6 2 1 2

5 9-Mar-15 19 3 26 7 2 ~ 15 3 ~ 1 72 4 1 7 40 1 3 2 6 3 1 2

6 10-Mar-15 14 3 29 7 2 ~ 15 3 ~ 1 76 4 1 17 44 1 3 3 6 3 1 2

7 11-Mar-15 14 3 26 7 2 ~ 8 2 ~ 1 63 4 1 17 40 1 3 3 6 3 1 2

8 12-Mar-15 14 3 26 7 2 ~ 8 2 ~ 1 63 4 1 20 40 1 3 3 6 3 1 2

9 13-Mar-15 0 1 4 7 2 ~ 1 2 ~ 1 18 4 1 17 32 1 2 1 2 3 1 2

10 14-Mar-15
9 1 22 6 2 1 2 1 44 4 1 40 17 1 2 4 4 1 2
11 15-Mar-15 7 2 3 14 1 27 1 1 2

12 16-Mar-15
6 3 5 7 2 12 2 1 38 4 1 20 2 1 2 2 4 4 1 2
13 17-Mar-15
5 3 4 6 2 8 1 1 30 4 1 25 2 1 2 3 6 4 1 2
14 18-Mar-15

15 19-Mar-15

16 20-Mar-15

17 21-Mar-15

18 22-Mar-15

19 23-Mar-15

20 24-Mar-15

21 25-Mar-15 14 3 36 7 2 ~ 9 2 ~ 1 74 4 1 17 40 1 3 3 6 4 1 2

22 26-Mar-15 14 3 35 7 2 ~ 10 2 ~ 1 74 4 1 17 40 1 3 3 6 4 1 2

23 27-Mar-15 2 4 ~ 1 1 ~ 1 8 0 1 17 8 1 1 1 2 0 1 2

24 28-Mar-15 9 3 19 7 2 ~ 7 2 ~ 1 50 4 1 17 40 1 3 3 6 4 1 2

25 29-Mar-15 8 2 19 7 2 ~ 5 2 ~ 1 46 4 1 17 43 1 3 3 6 4 1 2

26 30-Mar-15 10 2 25 7 2 ~ 4 ~ 1 53 4 1 17 40 3 3 6 4 1 1 2

27 31-Mar-15 10 2 25 7 2 ~ 8 1 ~ 1 56 4 1 17 37 1 3 3 6 4 1 2

28 1-Apr-15 7 1 21 7 2 ~ 1 2 ~ 1 42 4 1 15 37 1 2 2 4 4 1 2

29 2-Apr-15 7 1 23 7 2 ~ 6 1 ~ 1 46 4 1 2 27 1 2 2 4 4 1 2

30 3-Apr-15
no work
31 4-Apr-15

32 5-Apr-15 7 1 19 5 2 ~ 0 1 ~ 1 34 4 1 15 17 1 1 2 4 4 1 2

33 6-Apr-15 3 1 9 7 2 ~ 5 1 ~ 1 28 4 1 15 27 1 2 2 4 4 1 2
34 7-Apr-15 2 1 6 7 2 ~ 1 2 ~ 1 22 4 1 15 27 1 2 2 4 4 1 2

35 8-Apr-15 2 1 8 7 2 ~ 1 2 ~ 1 24 4 1 15 27 1 2 2 4 4 1 2

36 9-Apr-15 2 1 8 7 2 ~ 1 2 ~ 1 24 4 1 15 27 1 2 2 4 4 1 2

37 10-Apr-15 2 0 4 0 0 ~ 1 1 ~ 0 2 0 0 0 5 0 1 1 2 4 0 0

38 11-Apr-15 2 1 8 7 2 ~ 2 2 ~ 1 24 4 1 15 27 1 2 2 4 4 1 2

39 12-Apr-15 ~ ~

40 13-Apr-15 2 1 6 7 2 ~ 1 2 ~ 1 22 4 1 15 27 1 2 2 4 4 1 2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 603+500 (sp) shuttering of TB 1 6 2 1 1 11 4 1 17

2 574+000 to 577+500 Exc of cannal (cft) 8900 3

3 582+050 to 581+950 Subgrade Preperation 4 2 4 8 18

4 850+700 to 850+900 Exc of cannal (cft) 90000 1 1 5

5 851+900 to 852+300 210000 5 3 4 6 2 8 1 1 30 4 1 25


Mason

2
2
F.M

1
1
Supervisior

2
1
1
Surveyour

3
1
1
1
Helper

6
2
2
2
Consultant

4
4
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 603+500 (sp) Concerete Trough Slab 1 7 2 1 3 1 15 4 1 13

2 574+000 to 577+500 Exc of cannal (cft) 81900 4 12 16

3 581+950 to 581+850 Subgrade Preperation 1 1 5

4 Camp Sand Stock 4 1 1 6

5 16 1 7 2 1 2 3 1 38 4 1 18

5 & 6 nowork due to rain


Mason

8
8
F.M

1
1
Supervisior

& 6 nowork due to rain


2
1
1
Surveyour

2
1
1
Helper

4
2
2
Consultant

2
2
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 582+830 to 583+340 Stabilized Layer L/S 510A 1 7 2 1 1 12 4 1 23

2 573+000 to 577+000 Exc of cannal (cft) 118600 6 18 24

3 581+850 to 581+750 Subgrade Preperation R/S 2 2 5

4 Sand Stock Sand Stock 4 1 1 6

5 850+600 to 850+800 Exc of cannal (cft) 138000 2 6 1 9

851+850 to 852+000 204000 4 2 8 14

854+400 to 854+600 24700 1 3 1 5

15 25 4 7 2 15 3 1 72 4 1 28
Mason

2
2
F.M

1
1
Supervisior

3
1
1
1
Surveyour

3
1
1
1
Helper

6
2
2
2
Consultant

2
2
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 pcc L/s (m3) AH 583+302 to 582+822 120 1 7 2 1 1 12 4 1 32

Camp 577+744 to 577+672

2 Stabilized Layer R/s 583+360 to 583+160 200 ft 3

3 Steel Cutting Camp 116400

4 Exc of canal 573+000 to 577+000 6 18 24

5 Sub grade preperation R/S 582+750 to 581+650 2 2 5

6 Sand Stock Camp 4 1 1 6

7 Exc of canal 850+600 to 850+800 144000 2 6 1 9

852+200 to 852+400 210000 8 2 8 14

854+600 to 854+700 323000 1 4 5

19 26 3 7 2 15 3 1 72 4 1 40
Mason

14
14
F.M

1
1
Supervisior

3
1
1
1
Surveyour

2
1
1
Helper

6
2
2
2
Consultant

3
3
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 pcc L/s (m3) AH 583+362 to 583+302 120 1 7 2 1 1 12 4 1 32

Complete 583+302 to 582+822

2 Stabilized Layer R/s 583+160 to 582+760 400ft 3

3 Steel Cutting Camp

4 Exc of canal 573+000 to 577+000 135300 7 21 28

5 Sub grade preperation R/S 581+650 to 581+550 2 5

6 Sand Stock Camp 4 1 1 6

7 Exc of canal 850+800 to 851+800 150000 2 6 1 9

852+200 to 852+400 216000 4 2 8 14

854+600 to 854+700 30400 1 4 5

14 29 3 7 2 15 3 1 76 4 1 40
Mason

7
7
F.M

1
1
Supervisior

3
1
1
1
Surveyour

3
1
1
1
Helper

6
2
2
2
Consultant

3
3
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 pcc L/s (m3) AH 583+362 to 583+302 120 1 7 2 1 1 12 4 1 32

Complete 583+302 to 582+822

2 Stabilized Layer R/s 583+160 to 582+760 210 3

3 PileCape Steel Fixing 603+500

4 Exc of canal 573+000 to 577+000 116600 6 18 24

5 Sub grade preperation R/S 581+650 to 581+350 200ft 3 3 5

6 Sand Stock Camp 4 1 1 6

7 Exc of canal 852+500 to 852+700 192000 4 2 7

854+700 to 854+900 38000 1 4 13

14 26 3 7 2 8 2 1 63 4 1 40
Mason

17
17
F.M

1
1
Supervisior

3
1
1
1
Surveyour

3
1
1
1
Helper

6
2
2
2
Consultant

3
3
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 pcc L/s (m3) AH 5832+954 to 582+714 145 1 7 2 1 1 12 4 1 32

Complete 583+362 to 582+954

2 Stabilized Layer R/s 582+550 to 582+350 200ft 3

3 PileCape Steel Fixing 603+500

4 Exc of canal 573+000 to 577+000 113200 6 18 24

5 Sub grade preperation R/S 581+350 to 581+200 150ft 3 3 5

6 Sand Stock Camp 4 1 1 6

7 Exc of canal 850+600 to 850+800 184200 2 7

852+500 to 852+700 180000 2 2 13

854+300 to 854+500 45600 1 4 5

14 26 3 7 2 8 2 1 63 4 1 40
Mason

17
17
F.M

1
1
Supervisior

3
1
1
1
Surveyour

3
1
1
1
Helper

6
2
2
2
Consultant

3
3
MANPOWER

Lab tec

1
1
Lab Halper

2
2
SR NO RD Activity Qty MACHINERY

TRANSIT MIXTURE

BETCHING PLANT
TRICTOR TRALLE
TRACTOR BLEDE

WATER BOZZER
EXECVATOR

Mechanic
Plant Lab
Viberator

Operator
Dumper
Loader
Rollar

LB
1 Stabilized Layer R/S 582+350 t0 582+000 350ft 1 7 2 1 1 12 4 1 32

Steel FIXING Pile cape 603+500

Sand Stack Camp 4 1 1 6

4 1 7 2 1 2 1 18 4 1 32
Mason

20
17

3
F.M

1
1
Supervisior

2
1
1
Surveyour

1
1
Helper

2
2
Consultant

3
3
MANPOWER

Lab tec

1
1
Lab Halper

2
2