MS PRoject Exercise

The document outlines the tasks, duration, predecessors and resources required to complete an engineering project. It involves basic design, hardware and software development, procurement, fabrication, installation and testing. Various roles like project managers, designers, engineers, testers, purchasers etc. are required with different skill levels. The number of resources estimated for each task range from 1 to 15 depending on the type of work and skills required to complete the task successfully within the scheduled timelines.

Uploaded by

ABHISHEK KUMAR
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views

MS PRoject Exercise

The document outlines the tasks, duration, predecessors and resources required to complete an engineering project. It involves basic design, hardware and software development, procurement, fabrication, installation and testing. Various roles like project managers, designers, engineers, testers, purchasers etc. are required with different skill levels. The number of resources estimated for each task range from 1 to 15 depending on the type of work and skills required to complete the task successfully within the scheduled timelines.

Uploaded by

ABHISHEK KUMAR
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

S.No.

Task Name Duration Predecessors

1 Basic Design 10 wks


2 Hardware A
3 Design of A 8 wks 1
4 Drawings of A 5 wks 3
5 Hardware B
6 Design of B 6 wks 1
7 Drawings of B 4 wks 6
8 Software Specification 2 wks 6
9 Freezed design 0 wks 8
10 Fabrication
11 Part A
12 Assembly of A 1 wk 24,4
13 Test of A 2 wks 12
14 Part B
15 Assembly of B 5 wks 7,27
16 Test of B 3 wks 15
17 Site Operations
18 Installation Drawings 5 wks 3,6
19 Final Installation 8 wks 18,13,16
20 Test 6 wks 19,30
21 Procurement
22 Part A
23 Purchase A 4 wks 3
24 Delivery A 3 wks 23
25 Part B
26 Purchase B 4 wks 6
27 Delivery B 5 wks
28 Software
29 Purchase Software 5 wks 8
30 Delivery software 3 wks 29
Number of Resources
Task description Resource required
Basic Design Project Manager 2
Assistant Manager 10
Project Engineer 9
Hardware Design A Design head 2
Senior Designer 9
Junior Designer 8
Hardware Design B Design head 3
Senior Designer 15
Junior Designer 14
Drawings B Senior Draftsman 3
Junior Draftsman 3
Software specs Project Manager 5
Assistant Manager 8
Project Engineer 8
Parts Purchase B Purchase head 1
Purchase staf 1
Parts Purchase A Purchase head 1
Purchase staf 1
Drawings A Senior Draftsman 9
Junior Draftsman 9
Installation Drawings Design head 6
Senior Draftsman 8
Junior Draftsman 9
Software Purchase Purchase head 1
Purchase staf 1
Delivery B Project Manager 1
Delivery A Project Manager 1
Delivery Software Project Manager 1
Assembly A Project Manager 1
Senior engineer 7
Junior Engineer 8
Assembly B Project Manager 2
Senior engineer 14
Junior Engineer 14
Test A Testing head 1
Senior Tester 10
Junior Tester 10
Test B Testing head 1
Senior Tester 10
Junior Tester 10
Final Installation Project Manager 3
Senior engineer 10
Junior Engineer 8
Final Test Testing head 3
Senior Tester 11
Junior Tester 7
Resource Name Type Material Label Initials Group Max. Units Std. Rate

Project Work P Managerial 200% $120.00/hr


Managers
Assistant Work A Managerial 1000% $96.00/hr
Manager
Senior Work S Design 1000% $96.00/hr
Designers

Design Heads Work D Design 200% $104.00/hr

Junior Work J Design 1200% $80.00/hr


Designers
Senior Work S Design 500% $104.00/hr
Draftsman
Junior
Draftsman Work J Design 10000% $72.00/hr

Project Work P Engineering 900% $60.00/hr


Engineers
Junior Work J Engineering 1000% $80.00/hr
Engineers

Purchase Head Work P Procurement 100% $112.00/hr

Purchase staf Work P Procurement 100% $96.00/hr

Senior Work S Engineering 1000% $96.00/hr


Engineers

Senior Testers Work S Testing 900% $96.00/hr

Junior Testers Work J Testing 1000% $80.00/hr

Testing head Work T Testing 100% $104.00/hr


Ovt. Rate Cost/Use Accrue At Base Calendar Code

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard

$0.00/hr $0.00 Prorated Standard