Appendix For Pipe Drain

This document summarizes the pipe drainage calculations for several sections of pipe between manholes A through G. For each section, it provides the area, length, flow rate, full flow velocity, calculated velocity at the given flow rate, and friction slope. It is determining if the pipe needs to be revised for any sections based on the calculated velocity compared to the minimum required velocity.

Uploaded by

Caroline Langit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

Appendix For Pipe Drain

This document summarizes the pipe drainage calculations for several sections of pipe between manholes A through G. For each section, it provides the area, length, flow rate, full flow velocity, calculated velocity at the given flow rate, and friction slope. It is determining if the pipe needs to be revised for any sections based on the calculated velocity compared to the minimum required velocity.

Uploaded by

Caroline Langit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

APPENDIX: PIPE DRAIN

FROM MANHOLE A – MANHOLE B

A𝑀𝐻.𝐴−𝑀𝐻.𝐵 = 406.66 m2
L𝑀𝐻.𝐴−𝑀𝐻.𝐵 = 80 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 406.66 m2 )
𝑠
m3
Q = 0.009663868
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.009008985 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.37
Q𝑓𝑢𝑙𝑙
V
= 0.77
V𝑓𝑢𝑙𝑙
m
V = (0.77) ( 0.779951278 )
s
m m
V = 0.600562484 ≤ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.2m)2 (0.600562484 )
4 s
m3
Q𝑓 = 0.018867227
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
2 m3
10.3(0.010 )(0.018867227 s )
S= 16
(0.2m) 3
S = 0.001959266
F. S. = S x L
F. S. = (0.001959266) x (80m)
F. S. = 0.1567m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
4m − 3m
Grade =
80m
Grade = 0.0125

FROM MANHOLE B – MANHOLE C

A𝑀𝐻.𝐵−𝑀𝐻.𝐶 = 434.14 m2
L𝑀𝐻.𝐵−𝑀𝐻.𝐶 = 80 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 434.14 m2 )
𝑠
m3
Q = 0.010316855
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.010316855 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.42
Q𝑓𝑢𝑙𝑙
V
= 0.75
V𝑓𝑢𝑙𝑙
m
V = (0.75) ( 0.779951278 )
s
m m
V = 0.584963459 ≤ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
1 − 0.75 = 0.25
1 + 0.25 = 1.25
m
V𝑓 = (1.25) ( 0.584963459 )
s
m
V𝑓 = 0.731204324
s
𝜋 m
Q𝑓 = (0.2m)2 (0.731204324 )
4 s
m3
Q𝑓 = 0.022971461
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
2 m3
10.3(0.010 )(0.022971461 s )
S= 16
(0.2m) 3
S = 0.002904387
F. S. = S x L
F. S. = (0.002904387) x (80m)
F. S. = 0.2324m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
3m − 3m
Grade =
80m
Grade = 0.0125

FROM MANHOLE C – MANHOLE D

A𝑀𝐻.𝐶−𝑀𝐻.𝐷 = 443.37 m2
L𝑀𝐻.𝐶−𝑀𝐻.𝐷 = 80 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 443.37 m2 )
𝑠
m3
Q = 0.010536195
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.010536195 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.43
Q𝑓𝑢𝑙𝑙
V
= 0.81
V𝑓𝑢𝑙𝑙
m
V = (0.81) ( 0.779951278 )
s
m m
V = 0.631760535 ≥ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′ 𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.2m)2 (0.631760535 )
4 s
m3
Q𝑓 = 0.019847343
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
2 m3
10.3(0.010 )(0.019847343 s )
S= 16
(0.2m) 3
S = 0.002168113
F. S. = S x L
F. S. = (0.002168113) x (80m)
F. S. = 0.1734m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
3m − 3m
Grade =
80m
Grade = 0.0125
FROM MANHOLE H – MANHOLE G

A𝑀𝐻.𝐻 − 𝑀𝐻.𝐺 = 404.92 m2


L𝑀𝐻.𝐻−𝑀𝐻.𝐺 = 91 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 404.92 m2 )
𝑠
m3
Q = 0.00962247289
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.009622472 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.39
Q𝑓𝑢𝑙𝑙
V
= 0.73
V𝑓𝑢𝑙𝑙
m
V = (0.73) ( 0.779951278 )
s
m m
V = 0.569364433 ≤ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
1 − 0.73 = 0.27
1 + 0.27 = 1.27
m
V𝑓 = (1.27) ( 0.569364433 )
s
m
V𝑓 = 0.723092829
s
𝜋 m
Q𝑓 = (0.2m)2 (0.723092829 )
4 s
m3
Q𝑓 = 0.022716631
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
m3
10.3(0.0102 )(0.022716631 s )
S= 16
(0.2m) 3
S = 0.002840306
F. S. = S x L
F. S. = (0.002840306) x (91m)
F. S. = 0.2585m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
4m − 3m
Grade =
91m
Grade = 0.0109

FROM MANHOLE G – MANHOLE F

A𝑀𝐻.𝐺 − 𝑀𝐻.𝐹 = 424.07 m2


L𝑀𝐻.𝐺−𝑀𝐻.𝐹 = 91 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 424.07 m2 )
𝑠
m3
Q = 0.010077552
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.010077552 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.41
Q𝑓𝑢𝑙𝑙
V
= 0.78
V𝑓𝑢𝑙𝑙
m
V = (0.78) ( 0.779951278 )
s
m m
V = 0.608361997 ≤ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′ 𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.2m)2 (0.608361997 )
4 s
m3
Q𝑓 = 0.019111226
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
2 m3
10.3(0.010 )(0.019111226 s )
S= 16
(0.2m) 3
S = 0.002010269
F. S. = S x L
F. S. = (0.002010269) x (91m)
F. S. = 0.1829m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
3m − 3m
Grade =
91m
Grade = 0.0109

FROM MANHOLE F – MANHOLE E

A𝑀𝐻.𝐹 − 𝑀𝐻.𝐸 = 415.50 m2


L𝑀𝐻.𝐹−𝑀𝐻.𝐸 = 91 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 415.50 m2 )
𝑠
m3
Q = 0.009873896
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.009873896 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.39
Q𝑓𝑢𝑙𝑙
V
= 0.78
V𝑓𝑢𝑙𝑙
m
V = (0.78) ( 0.779951278 )
s
m m
V = 0.608361997 ≤ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′ 𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.2m)2 (0.608361997 )
4 s
m3
Q𝑓 = 0.019112256
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
2 m3
10.3(0.010 )(0.019112256 s )
S= 16
(0.2m) 3
S = 0.002010486
F. S. = S x L
F. S. = (0.002010486) x (91m)
F. S. = 0.1830m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
3m − 3m
Grade =
91m
Grade = 0.0109
FROM MANOLE E – MANHOLE D

A𝑀𝐻.𝐸 − 𝑀𝐻.𝐷 = 422.60 m2


L𝑀𝐻.𝐸−𝑀𝐻.𝐷 = 91 m
c = 0.5
m
𝑖10 = 4.752777778𝑥10−5
𝑠
Q = c𝑖A
m
Q = (0.5) (4.752777778𝑥10−5 ) ( 422.60 m2 )
𝑠
m3
Q = 0.010042619
s
D = 200mm
m
S = 0.0033
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.2m)3 (0.0033 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.779951278
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.2m)2 (0.779951278 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.024502892
s
m3
Q 0.010042619 s
=
Q𝑓𝑢𝑙𝑙 m3
0.024502892 s
Q
= 0.41
Q𝑓𝑢𝑙𝑙
V
= 0.78
V𝑓𝑢𝑙𝑙
m
V = (0.78) ( 0.779951278 )
s
m m
V = 0.608361997 ≤ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′ 𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.2m)2 (0.608361997 )
4 s
m3
Q𝑓 = 0.019111226
s
10.3(n2 )(Q2 )
S= 16
(D) 3
2
2 m3
10.3(0.010 )(0.019111226 s )
S= 16
(0.2m) 3
S = 0.002010269
F. S. = S x L
F. S. = (0.002010269) x (91m)
F. S. = 0.1829m
Elevation𝑠𝑡𝑎𝑟𝑡 − Elevation𝑒𝑛𝑑
Grade =
Length
3m − 3m
Grade =
91m
Grade = 0.0109

FROM MANOLE D – DETENTION TANK

L𝑀𝐻.𝐷−𝑀𝐻.𝐷𝐷𝑇 = 120 m
m3
Q 𝑇𝑂𝑇𝐴𝐿 𝐹𝑅.𝑀𝐻 𝐴−𝑀𝐻 𝐷 = 0.061686031
s
D = 300mm
m
S = 0.0019
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.3m)3 (0.0019 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.775499419
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.3m)2 (0.775499419 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.054816824
s
m3
Q 0.061686031 s
=
Q𝑓𝑢𝑙𝑙 m3
0.054816824 s
Q
= 1.13
Q𝑓𝑢𝑙𝑙
V
= 0.94
V𝑓𝑢𝑙𝑙
m
V = (0.94) ( 0.775499419 )
s
m m
V = 0.728969454 ≥ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′ 𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.3m)2 (0.728969454 )
4 s
m3
Q𝑓 = 0.051527814
s

FROM MANHOLE H – DETENTION TANK

L𝑀𝐻.𝐷−𝑀𝐻.𝐷𝑇 = 120 m
m3
Q 𝑇𝑂𝑇𝐴𝐿 𝐹𝑅.𝑀𝐻 𝐻−𝑀𝐻 𝐷 = 0.080051339
s
D = 300mm
m
S = 0.0019
m
n = 0.010
0.397 2 1
V𝑓𝑢𝑙𝑙 = (D)3 (S)2
n
0.397 2 m 1
V𝑓𝑢𝑙𝑙 = (0.3m)3 (0.0019 )2
0.010 m
m
V𝑓𝑢𝑙𝑙 = 0.775499419
s
𝜋 m
Q𝑓𝑢𝑙𝑙 = (0.3m)2 (0.775499419 )
4 s
m3
Q𝑓𝑢𝑙𝑙 = 0.054816824
s
m3
Q 0.080051339 s
=
Q𝑓𝑢𝑙𝑙 m3
0.054816824 s
Q
= 1.46
Q𝑓𝑢𝑙𝑙
V
= 1.12
V𝑓𝑢𝑙𝑙
m
V = (1.12) ( 0.775499419 )
s
m m
V = 0.8685593493 ≥ V𝑚𝑖𝑛 = 0.6 ; 𝑇ℎ𝑒𝑟𝑒𝑓𝑜𝑟𝑒 𝑑𝑜𝑒𝑠𝑛′ 𝑡 𝑛𝑒𝑒𝑑 𝑟𝑒𝑣𝑖𝑠𝑖𝑜𝑛𝑠
s s
𝜋 m
Q𝑓 = (0.3m)2 (0.8685593493 )
4 s
m3
Q𝑓 = 0.061394843
s

DETENTION TANK
Step 1: Identify peak discharge from site and maximum allowable peak discharge
A = 100 hectares

Cpost = (0.70 x 0.45) + (0.3 x 1.0) = 0.615

Ctarget = 0.55

tc = 16.67 mins

8913 8913
i10 = = = 169.2235mm/hr
𝑡𝑐+36 16.67+36

𝐶 𝑝𝑜𝑠𝑡 𝑥 𝑖10 𝑥 𝐴 0.615 𝑥 169.2235 𝑥 100


Qpost = = = 28.9090m3/s
360 360

𝐶 𝑡𝑎𝑟𝑔𝑒𝑡 𝑥 𝑖10 𝑥 𝐴 0.55 𝑥 169.2235 𝑥 100


Qtarget= = = 25.8536m3/s
360 360

Step Description Equation Remarks


1a Site area A = 100 ha
1b Weighted runoff
coefficient of site Cpost = 0.615
1c Time of concentration tc = 16.37 mins
1d Average rainfall intensity
for 10 – year storm event i10 = 169.2235 mm/hr
1e Peak discharge from site Qpost = 28.9090m3/s
1f Target runoff coefficient Ctarget = 0.55
1g Target peak discharge Qtarget = 25.8536m3/s

Step 2: Determine required detention volume

8913 𝑥 𝐶𝑝𝑜𝑠𝑡 𝑥 𝐴 8913 𝑥 0.615 𝑥 100


K1 = = = 91,358.25
6 6

8913 𝑥 𝐶𝑡𝑎𝑟𝑔𝑒𝑡 𝑥 𝐴 8913 𝑥 0.55 𝑥 100


K2 = = = 40,851.25
12 12

K3 = tc + 36 = 16.67 + 36 = 52.67

36𝐾1𝐾3 36 𝑥 91,358.25 𝑥 52.67


txmax = -K3 + √ = -52.67 + √ = 12.4485
𝐾2 40,851.25

(𝐶𝑝𝑜𝑠𝑡− 𝐶𝑡𝑎𝑟𝑔𝑒𝑡)(𝑡𝑐+36) (0.615− 0.55)(16.67+36)


txlimit = = = 6.2246
𝐶𝑡𝑎𝑟𝑔𝑒𝑡 0.55

Use 6.2246 as tcritical

𝐾1 (𝑡𝑐+𝑡𝑥𝑐𝑟𝑡𝑖𝑐𝑎𝑙) 𝐾2(2𝑡𝑐+𝑡𝑐𝑟𝑖𝑡𝑖𝑐𝑎𝑙)
Vt = −
(𝐾3+𝑡𝑥𝑐𝑟𝑖𝑡𝑖𝑐𝑎𝑙) 𝐾3

91,358.25 (16.67+6.2246) 40,851.25 (2 𝑥 16.67 + 6.2246)


Vt = −
(52.67 +6.2246) 52.67
= 4,827.8687m3

Step Description Equation Remarks


2a Calculate K1 K1 = 91,358.25
2b Calculate K2
K2 = 40,851.25
2c Calculate K3 K3 = 52.67
2d Calculate txmax
txmax = 12.4485 mins
2e Calculate txlimit txlimit = 6.2246 mins
2f Select txcritical Compare txmax and
txcritical = 6.2246 mins txlimit and select
smaller of the
values
2g Required detention Vt = 4,827.8687 m3
volume

Step 3: Determine detention tank configuration

Assume d = 6m
Let L = 1.5W

𝑉𝑡 4,827.8687
Minimum area required = = = 804.6448 m2
𝑑 6
A = LW
804.6448m2 = 1.5 W2
W = 23.1610 m = 24m
L = 36m

Detention tank volume = 24m x 36m x 6m = 5,184 m3


Required detention volume = 4,827.8687 m3
Required detention volume < Detention tank volume