2.7 Inspection Test Plan
2.7 Inspection Test Plan
Spectra Energy - General Works Workscope for the Dawson Processing Plant - Phase 2 Project
The objective of every KBR Wabi project is to deliver a product that meets our customer’s requirements
and our own internal expectations, which are to ensure that all components of the project are “built right
the first time,” thus eliminating costly “re-work” and making sure that construction schedules are
maintained.
The foundation of KBR Wabi’s quality program is an Integrated Management System certified to ISO
9001-2008, Quality Management Systems (QMS), ISO 14001-2004, Environmental Management
Systems and OSHAS 18001-2007, Occupational Health and Safety Management Systems.
While the management system is an important element of our Quality
Program, it is through proactive communication with Spectra Energy at
all levels that we fully understand the scope of your expectations and
perceptions leading to the development of our strategic execution
approach. During the critical pre-planning phase of a project we will
carefully review with all stakeholders the construction documents to
identify issues that could impact quality, cause rework or result in a
delay and devise mitigation strategies.
Throughout the project KBR Wabi will employ a behaviour-based
quality approach, similar to our behaviour-based safety approach that is
designed to reinforce consistent quality execution by making quality
part of the culture. This approach drives quality through the craft levels,
ensuring that everyone understands the project expectations and the value of time and materials. Project
personnel with the full knowledge of their supervisors/ managers, are empowered to take steps to resolve
any issues that may impact the quality level of their assigned tasks. If problems are detected, intervention
with the journeyman will occur to provide coaching and direction for quality improvement.
Further discussion of KBR Wabi’s quality program and procedures specific to the Dawson
Creek Processing Plant Phase 2 Project are included as:
• Attachment No. 7 – Contractor Inspection Test Plan
• Attachment No. 8 – Site Quality Plan as per Section 13 (Item #12) in the ITB.
Technical Proposal
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 1 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME TBD
SPECTRAQA
INSPECTOR
AUTHORIZEDINSPECTO
CONTRACTORINSPECTO
REFERENCE
KBR
R
R
KBR- Wabi Spectra NOTES
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL DATE
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE Attach all Inspection Reports (IR's) to the
# DOCUMENTS
WORK METHODS CRITERIA submitted ITP.
G E N E R A L - 1.00 Series
1.00.1 ITP Approval KBR QC Manual Approved ITP H
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
CONTRACTOR REP'S NAME
WORK LOCATION AREA TBD
QUALITY PLANS & PROCEDURES
CONTRACTOR REP'S PHONE NO.
DESCRIPTION OF ITEMS
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQAINSPECTOR
Spectra VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
KBR
KBR- Wabi
TASK TASK DESCRIPTION CONTROLLING DATE NOTES
ACCEPTANCE
PROCEDURE OR DOCUMENTS Attach all Inspection Reports (IR's) to the
# CRITERIA
WORK METHODS submitted ITP.
REFERENCE
W E L D I N G - 2.00 Series
KBR-WABI
2.00.1 Welding Control MAN-GL-WDC-CM-QC- and NDE reports
0201 Client approved WPS H
KBR-WABI
2.00.2 Welding Procedure Review MAN-GL-WDC-CM-QC- Approved Welding Matrix
Purchasing process, H
0201
KBR-WABI
2.00.3 Welding Consumables MAN-GL-WDC-CM-QC- MTRs, PMI if required
0201 Welder qualification H
KBR-WABI
2.00.4 Welder Qualifications MAN-GL-WDC-CM-QC- records Approved Welding Matrix
0201 MTRs and Client R
KBR-WABI
2.00.5 Materials & Qualification MAN-GL-WDC-CM-QC- specifications
0201 Client approved WPS H
2.01.0 WELDING DATA
(PIPING/EQUIPMENT/TANKS/STR)
KBR-WABI
2.01.1 Weld Procedures (ASME/CWB) MAN-GL-WDC-CM-QC- Stamped Drawings prior to Field Issue.
Welder qualification R
0201
KBR-WABI
2.01.2 Welder Qualification Records (ASME/CWB) MAN-GL-WDC-CM-QC- records Onsite Data Book of Current Welding Tickets
0201 Welder qualification R
KBR-WABI
2.01.3 Welder Qualification Log (Piping) MAN-GL-WDC-CM-QC- records Detailed Qualification Log
0201 Welder qualification R
KBR-WABI
2.01.4 Welder Qualification Log (Structural) MAN-GL-WDC-CM-QC- records Detailed Qualification Log
0201 Weld Mapping R
2.02.0 NDE DATA/REPORTS
(PIPE/EQUIPMENT/TANKS/STR)
KBR-WABI
2.02.1 Field Weld Drawing Identification Mapping MAN-GL-WDC-CM-QC- Hard Copy & CD
As per Acutrack R
0201
KBR-WABI
2.02.2 Weld Database "FULL REPORT" MAN-GL-WDC-CM-QC- KBR-ACUTRACK PROGRAM
As per Acutrack and R
0201
KBR-WABI
2.02.3 Radiographic Reports MAN-GL-WDC-CM-QC- applicable RT reports Hard Copy & CD
0201
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 3 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
(PIPING/EQUIPMENT/TANKS)
KBR-WABI As per approved vendor
2.03.1 PWHT Procedure MAN-GL-WDC-CM-QC- H
documentation Sub-contractor QC Manual to be accepted by KBR / Bantrel
0201
KBR-WABI As per Acutrack, PWHT
2.03.3 PWHT Charts MAN-GL-WDC-CM-QC- R
Charts Hard Copy & CD
0201
KBR-WABI As per Acutrack, PWHT
2.03.4 PWHT Calibration Records MAN-GL-WDC-CM-QC- R
Calibration Certs
0201
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 4 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME TBD
SPECTRAQA
INSPECTOR
AUTHORIZEDINSPECTO
CONTRACTORINSPECTO
REFERENCE
KBR
R
R
KBR- Wabi Spectra NOTES
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL DATE
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE Attach all Inspection Reports (IR's) to the
# DOCUMENTS
WORK METHODS CRITERIA submitted ITP.
C O N C R E T E - 3.00 Series
3.00.0 CONCRETE TESTING
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
CONTRACTOR REP'S NAME
WORK LOCATION AREA TBD
QUALITY PLANS & PROCEDURES
CONTRACTOR REP'S PHONE NO.
DESCRIPTION OF ITEMS
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQAINSPECTOR
Spectra VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
KBR
KBR- Wabi
TASK TASK DESCRIPTION CONTROLLING DATE NOTES
ACCEPTANCE
PROCEDURE OR DOCUMENTS Attach all Inspection Reports (IR's) to the
# CRITERIA
WORK METHODS submitted ITP.
REFERENCE
C I V I L - 4.00 Series
Soils Density R
4.00.0 CIVIL
FO-GL-WDC-QC-243
WM-WDC-QC-243
GLE Drawing R
4.00.2 Rebar Approval Concrete Pour Report
Specification
WM-WDC-QC-205
GLE Drawing R
4.00.3 Anchor Bolt Approval Concrete Pour Report
Specification
WM-WDC-QC-205
Soils Density W
4.00.4 Field Compaction Test Record Earthwork
FO-GL-WDC-QC-243
WM-WDC-QC-243
Concrete Release Form W
Structural Concrete
Road Construction W
4.00.10 Paving Inspection Report Road Construction
FO-GL-WDC-QC-244b,c
WM-WDC-QC-244
Non-Shrink
Non-Shrink Cementitious
Cementitious Grout W
4.00.11 Cementitious Grout Inspection Record Grout Installation Installation
WM-WDC-QC-212 FO-GL-WDC-QC-212
4.00.12 Epoxy Resin Grout Inspection Record Epoxy Grout Installation Epoxy Grout Installation W
FO-GL-WDC-QC-211
WM-WDC-QC-211
Client Vendor Supplied W
4.00.13 Drilled Pile Inspection Record N/A
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 6 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
4.01.0 STRUCTURAL
WM-WDC-QC-275
4.02.0 BUILDINGS
WM-WDC-QC-201
4.02.2 HVAC Controls Inspection Record HVAC HVAC Installation W
WM-WDC-QC-203 FO-GL-WDC-QC-0203
4.02.3 Building Air Conditioning Inspection Record HVAC HVAC Installation W
WM-WDC-QC-203 FO-GL-WDC-QC-0203
4.02.4 Fire Alarm Systems Reports/Inspections Architectural Architectural Installation W
WM-WDC-QC-201 FO-GL-WDC-QC-0201a
Communications System Communications System
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
CONTRACTOR REP'S NAME
WORK LOCATION AREA TBD
QUALITY PLANS & PROCEDURES
CONTRACTOR REP'S PHONE NO.
DESCRIPTION OF ITEMS
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQAINSPECTOR
Spectra VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
KBR
KBR- Wabi
TASK TASK DESCRIPTION CONTROLLING DATE NOTES
ACCEPTANCE
PROCEDURE OR DOCUMENTS Attach all Inspection Reports (IR's) to the
# CRITERIA
WORK METHODS submitted ITP.
REFERENCE
E L E C T R I C A L - 5.00 Series
5.00.0 MOTORS
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-238 to c
5.02.15 BC Safety Codes Reports
Setting/Calibration WM-WDC-QC-238 to c
5.02.17 Lighting & Single Phase Loads Test Record Lighting Systems Installation FO-GL-WDC-QC-0223
WM-WDC-QC-223
Mechanical Equipment
Installation FO-GL-WDC-QC-0262a
WM-WDC-QC-262
5.02.18 Packaged Equipment Test Records to q
Skid Mounted Equipment
FO-GL-WDC-QC-0263
Installation
WM-WDC-QC-263
Low and Medium Voltage
Non-Shielded Cable
Installation FO-GL-WDC-QC-0225
5.02.19 Insualtion Resistance (Equipment) Test Record WM-WDC-QC-225
FO-GL-WDC-QC-0226
Low-Medium and High
Voltage Shielded Cable
WM-WDC-QC-226
Low and Medium Voltage
Non-Shielded Cable
Installation FO-GL-WDC-QC-0225
5.02.20 DC High Potential Test (Equipment) Test Record WM-WDC-QC-225
FO-GL-WDC-QC-0226
Low-Medium and High
Voltage Shielded Cable
WM-WDC-QC-226
UPS System and Battery
5.02.21 Inverter & Static Switch Inspection Checklist Installation FO-GL-WDC-QC-0236
WM-WDC-QC-236
LV Distribution Panel Board, Control Panel, and Electrical Instrumentation
5.02.22 Wiring Installation FO-GL-WDC-QC-0228
J.B. Checklist
WM-WDC-QC-228
Medium Voltage Motor Control Centre Testing Motor Control Center
5.02.23 Installation FO-GL-WDC-QC-0231
Checklist
WM-WDC-QC-231
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 10 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
Installation
WM-WDC-QC-230 FO-GL-WDC-QC-0230
5.02.25 Switchgear Testing Checklist High Voltage Switchgear
FO-GL-WDC-QC-0233
Installation
WM-WDC-QC-233
Low and Medium Voltage
Non-Shielded Cable
Installation FO-GL-WDC-QC-0225
5.02.26 Insulation Resistance Power Cable Test Record WM-WDC-QC-225
FO-GL-WDC-QC-0226
Low-Medium and High
Voltage Shielded Cable
WM-WDC-QC-226
Motor Control Center
5.02.27 Low Voltage MCC Testing Record Installation FO-GL-WDC-QC-0231
WM-WDC-QC-231
Low Voltage Switchgear
Installation
WM-WDC-QC-230 FO-GL-WDC-QC-0230
5.02.28 Electrical Torquing Record High Voltage Switchgear
FO-GL-WDC-QC-0233
Installation
WM-WDC-QC-233
5.03.0 ELECTRICAL HEAT TRACE
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME TBD
SPECTRAQA
INSPECTOR
AUTHORIZEDINSPECTO
CONTRACTORINSPECTO
REFERENCE
KBR
R
R
KBR- Wabi Spectra NOTES
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL DATE
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE Attach all Inspection Reports (IR's) to the
# DOCUMENTS
WORK METHODS CRITERIA submitted ITP.
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-257
6.00.2 Tank Elevations Tolerances Record Tank Installation FO-GL-WDC-QC-0257
WM-WDC-QC-257
6.00.3 Pneumatic/Soap/Vacuum Testing Reports Tank Installation FO-GL-WDC-QC-0257
WM-WDC-QC-257
6.00.4 Final Closing Authorization Record Tank Installation FO-GL-WDC-QC-0287
WM-WDC-QC-257
6.01.3 Air Cooled & CWT Fans Inspection Record WM-WDC-QC-250 FO-GL-WDC-QC-0250
Pressure Vessel Installation FO-GL-WDC-QC-0252
WM-WDC-QC-252
Exchanger Installation
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-250
6.02.0 FIRE HEATERS & FURNACES
WM-WDC-QC-250
6.02.1 Vessel/Heater/Boiler Travel Sheet SPECIFIC TO BE
Pressure Vessel Installation
DEVELOPED
WM-WDC-QC-252
Furnace Installation
WM-WDC-QC-268
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 14 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-279
6.04.0 CENTRIFUGAL PUMPS
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-202
6.18.0 LUBE OIL FLUSH
RECORDS
Onsite Material and
6.19.1 Preservation & Storage Record Equipment Protection and 6-1CS
Preservation Plan
6-1CS
Onsite Material and
6.19.2 Equipment Lubrication Record Equipment Protection and 6-1CS
Preservation Plan
6-1CS
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 23 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-271 a thru f
7.00.2 Cold Spring Inspection Report Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru f
7.00.3 Bolt Torque / Tensioning Record Flange Bolt Installation FO-GL-WDC-QC-0273
WM-WDC-QC-273
7.00.4 Coating & Lining Holiday Test Record Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru f
7.00.5 Pipe Cleaning Inspection Record Build IT Clean FO-GL-WDC-QC-0274
WM-WDC-QC-274 a thru e
7.00.6 Hot Tap Authorization/Checklist Hot Tap Installation 5-2CS
WM-WDC-QC-272
7.00.7 Tie-in Checklist Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru f
7.00.8 Insulation Resistance/Insulated Test Record Insulation Installation FO-GL-WDC-QC-0277
WM-WDC-QC-277
7.00.9 Securamax Hub Installation Record
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-271 a thru c
7.03.2 Hydro Test Waivers Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru c
7.03.3 Piping Pressure Test Record Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru c
7.03.4 Temperature/Pressure Recorder Charts Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru c
Piping System Installation KBR-WABI-SITE
WM-WDC-QC-PLT3 a thru c
7.03.9 Air Drying Piping System Installation FO-GL-WDC-QC-0271
WM-WDC-QC-271 a thru f
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 25 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
WM-WDC-QC-242 thru g
8.01.0 Instrument Process Hookup Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.02.0 Instrument Subheader Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.03.0 Instrument Air Hookup Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.04.0 Instrument Calibration & Certification Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.06.0 Loop Test Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.07.0 Controller/Zone Operation Checklist Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.08.0 Tubing Checklist Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.09.0 FSE Report Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
8.10.0 Instrument Enclosure Field Checklist Instrumentation Installation FO-GL-WDC-QC-242 a
WM-WDC-QC-242 thru g
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 26 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME TBD
SPECTRAQA
INSPECTOR
AUTHORIZEDINSPECTO
CONTRACTORINSPECTO
REFERENCE
KBR
R
R
KBR- Wabi Spectra NOTES
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL DATE
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE Attach all Inspection Reports (IR's) to the
# DOCUMENTS
WORK METHODS CRITERIA submitted ITP.
9.00.3 NCRs closed Std. 14-3.12 / 14-3.13 NCR Log (Signed off as
closed)
9.00.5 Final Handover package submitted and accepted Contract documents, OSG- Turnover Package /
P6.06 MRS
CONTRACTOR INSPECTION AND TEST PLAN REV. A
PAGE 27 of 27
15-May-12
DATE SUBMITTED CONTRACTOR KBR-Wabi
Dawson Creek, BC
WORK LOCATION AREA CONTRACTOR REP'S NAME
TBD
QUALITY PLANS & PROCEDURES
DESCRIPTION OF ITEMS CONTRACTOR REP'S PHONE NO.
EXAMINATION / INSPECTION REQUIREMENTS
CONTRACTORINSPECTOR
INSPECTOR
AUTHORIZEDINSPECTOR
SPECTRAQA
REFERENCE
KBR
KBR- Wabi Spectra
TASK CONTROLLING VERIFYING INITIAL DATE INITIAL DATE INITIAL DATE INITIAL
DATE NOTES
TASK DESCRIPTION PROCEDURE OR ACCEPTANCE
# DOCUMENTS Attach all Inspection Reports (IR's) to the
WORK METHODS CRITERIA
submitted ITP.
* Select
one
CONTRACTOR INSPECTOR
AI INSPECTOR
SPECTRA QA INSPECTOR
MANAGEMENT SYSTEM
PROCEDURES
BY BY REVIEWED BY
DOCUMENT TITLE :
DOCUMENT NUMBER :
ATT-GL-KBR-QHSE-2007B
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 2 of 25
Table of Contents
ABBREVIATIONS & DEFINITIONS 3
1.0 INTRODUCTION 4
1.1 PURPOSE......................................................................................................................................................................4
1.2 SCOPE..........................................................................................................................................................................4
1.3 PROJECT DESCRIPTION................................................................................................................................................4
1.4 PROJECT MANAGEMENT SYSTEM OVERVIEW...............................................................................................................4
1.5 CUSTOMER SATISFACTION............................................................................................................................................5
2.1 LEADERSHIP & ORGANISATION.....................................................................................................................................5
2.1.1 Leadership.............................................................................................................................................................5
2.1.2 Project Quality Organisation...............................................................................................................................6
2.1.3 Competency of Project Personnel.....................................................................................................................6
2.1.4 Responsibility for Quality.....................................................................................................................................6
2.2 POLICY AND OBJECTIVES..............................................................................................................................................7
2.2.1 Quality Policy........................................................................................................................................................7
2.2.2 Project’s Objectives..............................................................................................................................................9
2.3 PLANNING.....................................................................................................................................................................9
2.3.1 Project Execution Plan........................................................................................................................................ 9
2.3.2 Quality Plan.........................................................................................................................................................10
2.3.3 Health, Safety and Environmental (HSE) Plan..............................................................................................10
2.4 PROCESS MANAGEMENT............................................................................................................................................10
2.4.1 Process Owner...................................................................................................................................................10
2.4.2 Process Authority...............................................................................................................................................10
2.4.3 Project Personnel...............................................................................................................................................11
2.4.4 Process Documentation....................................................................................................................................11
2.5 PERFORMANCE MEASUREMENT & RESULTS..............................................................................................................11
2.5.1 Performance Indicators.....................................................................................................................................11
2.5.2 Integrated Audit Schedule.................................................................................................................................11
2.5.3 Audit Implementation.........................................................................................................................................12
2.5.4 Audit Findings.....................................................................................................................................................12
2.6 CONTINUOUS IMPROVEMENT (CI)..............................................................................................................................12
2.6.1 Lessons Learned................................................................................................................................................12
2.6.2 Performance Indicator (PI) results...................................................................................................................12
2.6.3 Audit Findings.....................................................................................................................................................13
2.6.4 Management Reviews and Assessments......................................................................................................13
2.6.5 Teambuilding.......................................................................................................................................................13
3.1 CONTRACT REVIEW....................................................................................................................................................13
3.2 DESIGN CONTROL......................................................................................................................................................13
3.3 CHANGE CONTROL.....................................................................................................................................................13
3.4 VERIFICATION.............................................................................................................................................................13
3.5 PROCUREMENT...........................................................................................................................................................14
3.6 CORRECTIVE AND PREVENTATIVE ACTION..................................................................................................................14
3.7 INTERFACE MANAGEMENT..........................................................................................................................................14
3.8 CRITICALITY AND RISK ASSESSMENT..........................................................................................................................14
3.9 RECORDS MANAGEMENT............................................................................................................................................15
3.10 REGULATORY APPROVALS..........................................................................................................................................15
ATTACHMENT 1 – RESPONSIBILITY MATRIX 16
ATTACHMENT 2 – PERFORMANCE INDICATORS & MEASURES 24
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 3 of 25
CA Certification Agency
CS Classification Society
CI Continuous Improvement
LL Lesson Learned
PI Performance Indicator
PGM Project Group Manager
PM Process Map (multi-discipline working)
PM Project Manager
PMT Project Management Team (consists of PM and PGMs)
PMS Project Management System
PQM Project Quality Manager
QA Quality Assurance
Subcontractors An entity performing any part of the work under a contract with Contractor.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 4 of 25
1.0 INTRODUCTION
1.1 PURPOSE
The Project Quality Plan describes the strategy, execution philosophy, and documented
Management System by which quality elements of the Spectra Energy Dawson Creek Facility will
be controlled.
1.2 SCOPE
This Quality Plan covers Module installation and mechanical site works. It concentrates on the
current phase and will be updated to ensure that each succeeding stage is properly addressed.
KBR has integrated seven essential elements to provide the Management System that delivers
the services required for the Project.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 5 of 25
The seven elements that combine to deliver to the results to the customer are shown.
Project Leadership defines the purpose and direction for the project organization and takes
Responsibilities to meet the Customer & Market needs. Leadership then Plans and deploys
the resources & organization necessary to analyze specific customer requirements and develop &
manage the Processes necessary to realize their desired product / service. Constant
Management of Risk and Performance Assessment of the product and Processes monitors
the Results. Analysis enables Continual Improvement thereby increasing the ability to satisfy
our Customer & Market needs and enhance our performance and competitiveness.
2.1.1 Leadership
The Project Manager and the Project Management Team have provided the organisational
structure, resources and systems as presented in this Plan. Their continuing task is to engender a
Project culture of ‘can do, will improve’ staffed by a knowledgeable empowered team. This will be
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 6 of 25
achieved through communications to (e.g. induction, training sessions, regular meetings, the
Project Information System, etc.) and from (listening to, and acting on, feed-back) the Project
members and the Customer.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 7 of 25
• Ensuring that the team members are aware of and understand the requirements of the Quality
Plan and its supporting procedures and work instructions.
• Promoting feedback of problems/improvements in the process as noted during the execution of
the work.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 8 of 25
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 9 of 25
The objectives for quality management listed below are the fundamentals for executing the
Project. The Project Management Team supports and is committed to implementation of these
objectives.
• To provide alignment between Spectra Energy and Project Quality Objectives.
• Assure the technical integrity of the project facilities by ensuring that the relevant Quality, HSE
and legislative standards are specified in sufficient detail to the Project Team, its sub-
contractors and suppliers.
• Prevention of quality problems through Risk Management, Criticality Assessment & Audit.
• Ensure that the design, engineering, procurement, construction, installation and commissioning
of the facilities are in compliance with applicable regulations, codes, standards and
specifications and in accordance with good industry practice.
• Operate and maintain a quality management system in accordance with ISO 9001:2000, ISO
14001:2004 & OHSAS 18001:1999.
• Minimise errors and deficiencies by ensuring that individuals perform their duties in a
systematic manner. Detect errors and resolve them, and analyze root causes to prevent
recurrence and to improve the system.
• To provide for the early identification of issues and concerns relating to the quality of work or
performance, and to bring these to the attention of Project Management.
• Continually seek areas to improve methods, systems, and operations by monitoring ongoing
activities in a systematic manner through risk management, audits, corrective and preventive
action activities.
• Ensure that individuals have a clear definition of their responsibilities and the necessary
qualifications, experience and training to perform their duties in a satisfactory manner.
• Ensure that sub-contractors and suppliers are qualified and use acceptable quality systems.
• To maintain excellent communications with the customer and between Project offices and
work-sites, suppliers and sub-contractors, particularly with respect to the resolution of technical
queries, deviation requests and identified non-conformances.
• To achieve acceptable process facilities performance as defined in the Contract.
• Ensure feedback of project experiences and incorporation of lessons learned.
Specific measures will be developed and monitored to confirm realisation of the objectives. Where
we fall short of expectations, the processes will be investigated. The findings will be analysed and
improvement plans implemented.
2.3 PLANNING
Plans will be developed as required throughout the Project. The three that sit at the top are the
Project Execution Plan (the what, who and when of doing the work), the Quality Management
Plan (the systems to be used) and the HSE Plan (providing prominence to this vital area).
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 10 of 25
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 11 of 25
liaison with the Process Owner (and his Local Process Authority) regarding modifications needed
to address local, country, regional or contractual variations.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 12 of 25
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 13 of 25
2.6.5 Teambuilding
Teambuilding workshops may be planned to:
• Align the Project team with: • Overcome inefficiencies
¾ Customer needs and expectations • Increase the understanding of:
¾ Project strategy and objectives ¾ other people’s needs and
¾ KBR policies and practices ¾ areas of constraint
• Look for areas of business improvement
The participants at these workshops will be the people involved in or affected by the process (and
may include Client personnel).
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 14 of 25
3.5 PROCUREMENT
A Procurement Plan has been developed to match the requirements of the project schedule. The
review will also look at how the plan will encourage suppliers to maintain or improve delivery
performance and to assure the Project that the plan has included the best overall execution
strategy for the project as a whole.
3.6 CORRECTIVE AND PREVENTATIVE ACTION
Any non-conformities (NCRs) identified, will be managed in a controlled manner dependent upon
the nature of the non-conformity. These may be identified from any source e.g. quality audit,
design review, or problems that have arisen during normal day to day activities. NCRs are
documented in the Findings Log and tracked to close-out.
All personnel are responsible for reporting non-conformities to their Line Manager, who is
responsible for initiating and co-ordinating their closeout.
Non-conformities may be investigated to identify root causes, this will depend upon the magnitude
of the problem. Actions to be taken to closeout non-conformities are to be determined by the
relevant responsible personnel. Corrective and preventative actions are implemented on the basis
of the risk involved and the magnitude of the problem.
3.7 INTERFACE MANAGEMENT
The Interface Management Plan will define the process for identifying, scheduling, controlling and
managing both:
Internal Interfaces - technical interfaces that exist among KBR, the Sub-Contractors and Suppliers
as well as their sub subcontractors within the Project
External Interfaces - interfaces existing between other elements of the Project and other parties;
e.g. Regulatory Bodies, Governmental Agencies, NGOs, etc.
For effective control to exist, it is essential that each interface is broken down to the level where it
primarily affects only two parties.
3.8 CRITICALITY AND RISK ASSESSMENT
The Management Team is accountable for the identification and management of risks that could
jeopardise the project. To support this activity, a Risk Management Business Model has been
developed. An output from this model is a generic risk management process, resulting in the
development of a risk register containing a summary of each issue, an assessment of the
associated risks and identification of the persons accountable for managing the risk.
It is the responsibility of the Management Team to implement the project risk management
procedure, to ensure that a risk aware culture is developed within the project through education,
and identify those requiring training in particular risk management and risk analysis skill areas.
Success will depend upon the maintenance of a pro-active attitude towards risk and its
management.
The Risk Management process will be periodically audited using the risk management audit
procedure against the relevant procedures and accepted best practice, to determine areas where
improvement is required to ensure and reinforce good governance.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Page 15 of 25
Sub-contractors, suppliers and third parties are responsible for obtaining approvals, permits,
consents and notifications relating to their individual work scopes in compliance with the Permit
and Consents Policy as defined in their respective contracts.
Responsibility for monitoring the overall approval and notification process is vested with the
Permits & Consents Team Leader.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1 - Responsibility Matrix Page 16 of 25
ATTACHMENT 1 – RESPONSIBILITY MATRIX
This responsibility matrix identifies those activities within the scope of work which require clear, concise description in the form of a
procedure (PM, WM or Work Instruction) to ensure smooth interface and a common approach among the Project team members.
The listed procedures provide the guiding principles that shall be followed. Specific needs will, in many instances, dictate the
requirement for more detailed (and lower level) documentation, that may augment, or replace the listed procedures; however, any
variations from the basic requirements must be agreed with the PMT. Such agreement is normally achieved through discussions
between the Process Owners that the Quality group will facilitate.
The tabular quality responsibility matrix follows contains the ten listed categories:
1.0 Project Management 6.0 Information Management
2.0 Quality Management 7.0 Engineering Management
3.0 HSE Management 8.0 Materials and Purchasing
4.0 Commercial Management 9.0 Construction Management
5.0 Project Controls 10.0 Operations
The Responsible Parties, listed below, shall work with the Process Owners to ensure the procedures are effective and in place prior to
the work being carried out. Equally important, they shall ensure that the procedures are understood by those who will implement them
(this may involve teach-ins, etc.). Any modifications to the standard procedures shall be agreed with the Process Owner.
Commercial Manager
Construction Manager
Corporate Group
Completions Manager
Engineering Manager
HSE Manager
Information Manager
Integration (Interface) Manager
Operations and Maintenance (O&M) Manager
Procurement Manager
Project Controls Manager
Project Manager
Quality Manager
The documents listed in this matrix are current at the date of issue; however, the reader is referred to the Project Website for the
current Project Procedure list.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 17 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
1.0 PROJECT MANAGEMENT
1.1.1 Management Responsibilities Project Manager DM-GL-KBR-PM-1201 Execution Plan
1.1.2 - Organisation Project Manager DM-GL-KBR-PM-1201 Organisation Charts
1.1.3 - Management System Review Project Manager DM-GL-KBR-PM-1201 Reports
1.1.4 - Selection of Project Personnel Project Manager DM-GL-KBR-PM-1201 Personnel CVs & Form
2.2 AUDITING & CORRECTIVE ACTION Quality Manager PM-GL-ECD-QM-1507 Audit Schedule
2.2.1a - General - Audit Execution Quality Manager PM-GL-ECD-QM-1507 Audit Report
2.2.1b - Contract Audit Plan Quality Manager PM-GL-ECD-QM-1507 Audit Schedule
2.2.1c - Performance Assessment HSE Manager Audit Report
2.2.1d - Engineering Assurance Reviews Engineering Manager / Audit Report
Corporate Group
2.2.2 - Non conformance Control Quality Manager MAN-GL-KBR-CM-QC-0201 Report/Log
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 18 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
2.4.2 - Quality Awareness Quality Manager MAN-GL-ECD-QM-1502 Attendance records
2.4.3 - HSE Induction Awareness and Communications HSE Manager Attendance records
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 19 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
4.2.9 Close-out – Subcontracts Commercial Manager WM-GL-ECD-SC-1914
4.3 Administration
4.3.1 - Approvals Matrix - Levels of Authorisation (Non technical) Project Controls Manager Files
4.3.2 - Travel & Expense Claim Procedure Project Controls Manager Forms
4.3.3 - External Correspondence Format Project Controls Manager
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 20 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
6.1.4b - Document and Information Handover to Client Information Manager List
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 21 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
8.2 Project Suppliers List Procurement Manager WM-GL-ECD-SP-1103 Supplier List
8.3 Material Reference Numbers-Bulk Material Procurement Manager WM-GL-ECD-MRP-1109 Catalogue
8.4 Material Take Off - Reference Numbers Procurement Manager WM-GL-ECD-MRP-1109 MTO
8.5 Material Take Off - Bulk Materials Procurement Manager WM-GL-ECD-MRP-1109 MTO
8.6 Request for Quotation - Tagged Items Procurement Manager WM-GL-ECD-PU-1104 RFQ
8.6.1 Request for Quotation - Bulks Procurement Manager WM-GL-ECD-MRP-1118 RFQ
8.6.2 Electronic RFQ Process Procurement Manager WM-GL-ECD-PU-1104 RFQ
8.7 Engineering Interface - Tagged Items (EDMS/IPMS) Procurement Manager Aligned EDMS/IPMS
8.8 Export Compliance Procurement Manager Completed Check-list
8.9 Spare Parts Identification Procurement Manager WM-GL-ECD-SMC-1116 SPIR
8.10 Bid Evaluation Purchases Procurement Manager WM-GL-ECD-PU-1105 Joint Recommendation
8.10.1 Bid Clarification Meeting Procurement Manager WM-GL-ECD-PU-1107 Minutes
8.11 Pre-Award Meeting Procurement Manager WM-GL-ECD-PU-1108 Minutes
8.12 Guide to Package Management Procurement Manager WM-GL-ECD-PU-1109 Package Management Plan
8.13 Formal Award Purchases Procurement Manager WM-GL-ECD-PU-1112 PO
8.14 Initial Review (IR) Meeting Quality Manager Report
8.15 Change Order Preparation and Approval Procurement Manager WM-GL-ECD-PU-1113 PDVS
8.15.1 Change Orders Purchases Procurement Manager WM-GL-ECD-PU-1114 Change Order
8.16 Supplier Surveillance Quality Manager MAN-GL-KBR-CM-QC-0201 QC Plans
8.16.1 - Supplier Non-Conformance Control Quality Manager MAN-GL-KBR-CM-QC-0201 NCR
8.16.2 - Reporting Requirements for Supplier Visits Procurement Manager Reports
8.16.3 - Purchase Order Release Activities Quality Manager MAN-GL-KBR-CM-QC-0201 Reports (Release Notes)
8.16.4 - Punchlist Control & Incomplete Package Delivery Procurement Manager WM-GL-ECD-EX-1105 Punch Lists
8.16.5 - Issuing of Inspection Release Notes Quality Manager MAN-GL-KBR-CM-QC-0201 IRN’s
8.16.6 - Technical Deviation Procedure Quality Manager MAN-GL-KBR-CM-QC-0201 DDR's
8.16.7 - Supplier Alert Process Procurement Manager Notices
8.17 Traffic Management/Project Logistics Procurement Manager Plan
8.17.1 Material Movements Procurement Manager WM-GL-ECD-SMC-1108 MMT
8.18 Warehouse Receiving Procurement Manager WM-GL-ECD-SMC-1111 Receipt Records
8.19 Material Glossary Maintenance Procurement Manager Glossary
8.20 Over, Short, Damage Report Procurement Manager WM-GL-ECD-SMC-1112 OS&D
8.21 Close Out - Purchases Procurement Manager WM-GL-ECD-SMC-1113 Report
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 22 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
9.1.1 Site Subcontract review Construction Manager Subcontract
9.1.2 Review of Project Contract and Scope Project Manager DM-GL-KBR-PM-1201 Subcontract
9.1.3 Contractual Compliance Review Project Manager Subcontract
9.1.4 Subcontract Post Award Administration Construction Manager
9.1.5 Planning, Scheduling and Progress Measurement Construction Manager Files
9.1.6 Vendor Coordination Construction Manager WM-GL-KBR-CM-0214
9.1.7 Site Technical Query Construction Manager Files
9.1.8 Interoffice Interface Interface Manager Register
9.1.9 Interface with Third Parties Interface Manager Register
9.1.10 Identification & Recording of Interface Issues Interface Manager Register
9.1.11 Distribution & Resolution of Interface Issues Interface Manager Register
9.1.12 Responsibility matrix for the Interface Mgmt Team Interface Manager
9.1.13 Material Reference Numbers – Bulk Materials Construction Manager
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 1- Responsibility Matrix Page 23 of 25
Item RESPONSIBLE VERIFYING
No QUALITY ACTIVITY ELEMENT PARTY APPLICABLE PROCEDURE DOCUMENT/ACTION
9.4 Construction – Project Services
9.4.1 Milestone Progress Verification and Approval Construction Manager
9.4.2 Supplier / Subcontractor / Operations Coordination of Training Construction Manager
9.4.3 Invoice and payment of Subcontractors Construction Manager Files
9.4.4 Variations Construction Manager Files
9.4.5 Change Orders Purchases Construction Manager WM-GL-ECD-PU-1114 PO files
9.4.6 Cost reporting,/ Forecasting Construction Manager PR-GL-ECD-CC-1360 Files
9.4.7 Travel and Expense Claims Construction Manager Files
9.4.8 Site requisitions Construction Manager BP-GL-KBR-PMM-2901 Requisitions
9.4.9 Timesheet/ Overtime/ Control of Hours Worked Construction Manager Files
9.4.10 Traffic Management Construction Manager File
9.4.11 Warehouse receiving Construction Manager WM-GL-ECD-SMC-1111 Receiving records
9.4.12 Over, Short & Damage Report Construction Manager WM-GL-ECD-SMC-1112 Records
9.4.13 Close out – Purchases Construction Manager WM-GL-ECD-SP-1119 PO files
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B / Rev. A
Project Quality Plan Attachment 2 – Performance Indicators & Measures Page 24 of 25
ATTACHMENT 2 – PERFORMANCE INDICATORS & MEASURES
The primary aim of the Project is to deliver all facilities within schedule and budget, and in full compliance with the contract requirements and
specifications.
The Quality Management Objectives stated in this Project Quality Plan and the following measures and targets support the aim of the Project and,
where relevant, will be applied to sub-contracts.
These targets will be reviewed as part of the Management Review Process. Targets will be progressively increased, within the limits of practicability. If it
is agreed that additional or alternative measures and targets would be appropriate, then these will be incorporated with immediate effect.
The samples below are to be modified to suit the Project after award.
Performance Indicator Measure and Target
1 Provide Project Management services that meet contractual Measure: Project Master Schedule milestones.
requirements, applicable codes, standards and specifications, and Target: Zero days overrun due to waiting on QA or Certification/Classification Society
regulatory requirements. approvals, issue of certificates, or receipt of required data and documentation.
2 Operate and maintain a quality management system in accordance Measure: Company and Internal Audit Findings
with ISO 9001:2000, ISO 14001:2004 & OHSAS 18001:1999 Targets: 100% response to audit reports within 15 days of receipt 100% closeout within
agreed time frames.
3 Minimize errors and deficiencies by ensuring that individuals perform Measure: Number of Non-Conformance Reports and Corrective Action Requests raised.
their duties in a systematic manner. Detect errors and resolve them. Target: 80% fully implemented within three months.
Analyze root causes to prevent recurrence and to improve the
system
4 Seek areas to improve methods, systems and operations by Measure: Project Management Audit Schedule dates.
monitoring ongoing activities in a systematic manner using the audit Target: 80% performed and reported within ten days of the scheduled date.
function and the corrective and preventive action activities.
5 Ensure that individuals have the necessary qualifications, Measure: Project Personnel Approvals/Interviews /Roles & Responsibilities
experience and training to perform their duties in a satisfactory Target: 100% assessed for meeting job specification requirements.
manner.
6 Ensure that Sub-Contractors are qualified and use acceptable Measure: Sub-Contractor Pre-Qualification and ongoing Quality audits
quality systems. Target: 80% performed and reported within fifteen days of scheduled dates.
7 Ensure feedback of project experience and lessons learned for the Measure: Number of Lessons Learnt /Improvements identified and implemented.
improvement of the Project Execution. Target: 80% completed within fifteen days of scheduled dates.
Att #8 - Site Quality Plan.docm Paper Copies of this document are UNCONTROLLED.
Refer to the Project Website for the current revision. ATT-GL-OFF-QM-202A
Spectra Energy-Dawson Creek ATT-GL-KBR-QHSE-2007B, / Rev. A
Project Quality Plan Attachment 3 – Performance Indicators & Measures Page 25 of 25
8 Resolve Technical Queries within agreed time frames. Measure: Number of modification requests issued and complied with.
Targets: 80% responded to within fifteen days;
80% completed, with comments incorporated, within 15 days of response receipt.
9 Monitor welder and welding performance at fabrication sites. Measure: Percentage repair rates (by operator and weld length / joints completed).
Target: 10% improvement per annum on benchmarked repair rates. Baseline rates to be
established during the first three months of each construction / fabrication sub-
contract.
Paper Copies of this document are UNCONTROLLED. Please refer to the Project Website for the current version.