1. This document provides a test format for end-to-end testing of distance protection between two substations. 2. The test format includes checking indications and alarms, verifying the distance protection communication scheme and inter-trip signals, and simulating faults to check the operation of distance protection relays. 3. The test is to be performed, witnessed, and signed off by engineers to validate that the distance protection system operates as intended across the two substations.

Uploaded by

Richard Regidor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
146 views

End To End - Distance

1. This document provides a test format for end-to-end testing of distance protection between two substations. 2. The test format includes checking indications and alarms, verifying the distance protection communication scheme and inter-trip signals, and simulating faults to check the operation of distance protection relays. 3. The test is to be performed, witnessed, and signed off by engineers to validate that the distance protection system operates as intended across the two substations.

Uploaded by

Richard Regidor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Commissioning Service Department

Commissioning Standard Test Formats


Description: END TO END TEST - DISTANCE Record No.:
Bay no.: Drawing ref.: Sheet: 1 of 2
Contractor: Contract no.: Substation No :

Notes:
1. This test format is the minimum for END-to-END test of distance protection.
2. The following forms should be according to schematic drawing and type of
relays and devices used.

1. INDICATION AND ALARM CHECKING:


Note: (CP)—Communication Panel

Simulation From Local S/S


Local S/S Remote S/S
Ind. On IND. Control panel IND.
Equ.no & Descriptio Ind. On Control panel
Item NSD /FLAG on Ann. / /FLAG on
name n NSD(CP) Ann /HIMU
(CP) Relay panel HIMU Relay panel
1
2
3
4
5

2. DISTANCE PROTECTION COMMUNICATION SCHEME AND INTER-TRIP


INDICATION AND ALARM CHECK:

Local Station Remote Station


Alam In Flags In Indicatio
Signal Indication At Signal Indication At Remarks
Control Panel Relay n At
Initiated NSD (OLS) Received NSD (OLS)
/ Himu Panel Relay
FPFM-1 FPFM-1
Permissive Permissive
Send Received
FPFM-2 FPFM-2
Permissive Permissive
Send Received
Inter Trip-1 Inter Trip-1
Send (INST.) Received
Inter Trip-2 Inter Trip-2
Send(INST.) Received
FPFM-1
FPFM-1 Block
Block
Send
Received
FPFM-2
FPFM-2 Block
Block
Send
Received

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Commissioning Service Department
Commissioning Standard Test Formats
Description: END TO END TEST - DISTANCE Record No.:
Bay no.: Drawing ref.: Sheet: 2 of 2
Contractor: Contract no.: Substation No :

3. DISTANCE PROTECTION COMMUNICATION SCHEME AND INTER-TRIP


CHECK

Simulation From Local Substation


Local Substation Remote Substation
Con
Indication
Trip IND / CP Indication NSD IND / Panel
Simula-Ted NSD
Item Relay FLAG ANN / A/R FLAG On ANN A/R
Fault
In Rp on RP HIMU Relay Panel /HIM
OLS PLCC OLS PLCC
U
FPFM-1 Z1
1
optd
FPFM-1 Z2
2
optd
FPFM-1 Z3
3
optd
FPFM-1 Z1
4
SOTF optd
FPFM-2 inst
5
optd
FPFM-2 time
6
delay
FPSM-1 Z1
7
optd
FPSM-1 Z2
8
optd
FPSM-1 Z3
9
optd
FPSM-1 Z1
10
SOTF optd
FPSM-2 inst
11
optd
FPSM-2delay
12
Trip
13 CBF ½ optd

Checked:

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: