Reminders:: Sterling Technopark
Reminders:: Sterling Technopark
LOT USAGE:
-Light & Medium Industries Only.
(Heavy industries are not allowed like
industries using banker fuel like: foundry,
steel manufacturing, and hazardous
manufacturing plant.)
OR receipt will be issue upon full payment
(but it depends on your monthly amortization).
This OR will serves as a partner of your Deed
of Sale.
EASEMENT:
-6 Meters front but can reduce to 3 meters
-2 Meters at the back and 2 meters side
but you can provide firewall BOTH SIDE AND
BACK if you want to maximize your lot.
-From front of your property line provide
plant box for greenery purpose (.5 Meter from
your front property line)
CONSTRUCTION BOND:
Sterling Techno Park- (Php 250,000 Each
Lot)