Lifting Plan: Name & Signature Name & Signature
Lifting Plan: Name & Signature Name & Signature
Crane Capacity ……...…….…………Tons Height at the point of placing or lifting the device (H)…..….…...……....m
MAX. Load from load chart at (R) and (H) .…......…...……...….Tons (Compare with Load Chart)
Which must not exceed Lifting capacity rate 75% of Crane Capacity
Calculate and verify the accuracy of the information completely. Certify and Approve calculation results
Name & Signature Name & Signature
Permit Requestor....................................................................... Date…........./........../.......... EPC Lifting Supervisor/Mechanical Engineer....................................................................Date........../........../..........
5. Inspect safety measures at working area before strart working(Filled by EPC Lifting Supervisor/Mechanical engineer)
Weight of Material/Equipment for lifting : (TOTAL WEIGHT)
Total weight (N*) = (W) + (S*) .............................Tons
Lifting Condition:
Crane Capacity ……...…….....…………Tons Radius (R)………......……....m Length of Boom(B) ………….....…….m
Height at the point of placing or lifting the device (H)….......….....m MAX. Load from load chart at (R) and (H) .…..............….Tons (Compare with Load Chart)
Total Weight (N*) x 100
Lifting capacity rate = MAX. Load from load chat %...................... = ( Which must not exceed Lifting capacity rate 75% of Crane Capacity)