01 Quality Objectives Summary

1. The document outlines a quality objectives action plan summary for 2009. It lists 5 key objectives including increasing annual turnover, entering a new regional market, improving health and safety, reducing avoidable overheads and costs, and effectively developing and implementing a quality management system. 2. For each objective, it provides the target, action plan, responsibilities, target dates, and monitoring status. The monitoring status tracks completion on a scale of 0-25%, 26-50%, 51-75%, and 76-100%. 3. Key performance indicators are tracked by senior management to monitor progress on achieving the quality objectives and action plan targets for the year.

Uploaded by

arylananyla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views

01 Quality Objectives Summary

1. The document outlines a quality objectives action plan summary for 2009. It lists 5 key objectives including increasing annual turnover, entering a new regional market, improving health and safety, reducing avoidable overheads and costs, and effectively developing and implementing a quality management system. 2. For each objective, it provides the target, action plan, responsibilities, target dates, and monitoring status. The monitoring status tracks completion on a scale of 0-25%, 26-50%, 51-75%, and 76-100%. 3. Key performance indicators are tracked by senior management to monitor progress on achieving the quality objectives and action plan targets for the year.

Uploaded by

arylananyla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

<Company Name>

Quality Objectives Action Plan Summary 2009


TOP MANAGEMENT

Current Update:

Summary of Target Monitoring Status (% completion)


Action Plan Responsible
Sr. Objectives Target Date Achievements
(How) (Who) 0 – 25% 26-50% 51-75% 76-100%
(What, Why, Where) (When)
This can be divided into percentages and
To Increase Annual From ___ Million KD to
each completed action increases the
1. Turnover of existing ___Million KD by the end
percentage in the monitoring status
business of 2009
column

Enter the Regional


____________ by the end
2. Market in the Middle
of 2010
East

- Reduce work accident


Focus on the health, rates from __% to __%
safety and - Develop health, safety
3.
environment of the and environment policy
employees and objectives.

- Reduce outsourcing of
Reduce avoidable HVAC, Electrical,
overheads, costs Mechanical works,
4.
incurred by the - Introduce usage of high
company quality-low cost
materials, equipment
- Development/
implementation of
procedures, dept.
Effective objectives
development / - Dept. Data monitoring,
5. implementation of the measurement and
Quality Management analysis
system - Customer Complaints
and Satisfaction analysis
- Ensure very effective
Internal Audits.

ACHIEVED PENDING
Prepared By: Reviewed By: Approved By:

________________________ _______________________ _______________________


Sr. QA Engineer QAM Dept. Manager

QF750-1-7A – Quality Objectives Summary


Issue: 1 Rev: 0 Page 1 of 1
Issue date: 30 Jun 2008