Pump House Pool Fire
Pump House Pool Fire
FW Tank T-678
P=0 R2 Wl=17.3
Pi=158 Wv=0 P=140
Po=158 Pi=158
Po=140
L7 V=3.3
L1 dP/L=0.6
Wl=17.3 D=3"
Wl=75.2 Wv=0 L=20
Wv=0 Pi=158
Pi=0.62 Po=158
Po=1.03 V=0.84
V=3.68 dP/L=0.0
dP/L=0.3 L2 L6
D=6"
D=6" Wl=75.2 Wl=47.9 L=90
T1 T3
L=17 P1 Wv=0 Wv=0 L12
P1=158 P1=158
Pi=1.03 Pi=159 P2=158 Pi=158 P2=158 Wl=11.4 Shed
J1
Po=159 Po=158 P3=158 Po=158 P3=158 Wv=0 P=158
P=158
V=3.68 V=2.34 Pi=158
dP/L=0.3 dP/L=0.1 Po=158
D=6" D=6" V=1.26
L=80 L=70 dP/L=0.1
D=4"
L=1
L11
Wl=27.3
Wv=0
Pi=158 L8
Po=158 Wl=30.6 L9
V=1.33 Wv=0 Wl=11.4 PumpHous
dP/L=0.0 Pi=158 Wv=0 P=157
D=6" Po=158 Pi=158
L=200 V=1.5 Po=158
dP/L=0.1 V=1.26
D=6" dP/L=0.1
L=70 D=4"
L=60
R3
Pi=158
Po=158
L10 L12
T4
P1=158 Wl=19.2 R1 Wl=19.2 TWGantry
L5 Wv=0 Pi=158 Wv=0 P=157
P2=158
Wl=27.3 P3=158 Pi=158 Po=158 Pi=158
Wv=0 Po=158 Po=157
Pi=158 V=0.94 V=2.13
Po=157 dP/L=0.0 dP/L=0.2
V=3.03 D=6" D=4"
dP/L=0.4 L=10 L=60
D=4"
L=25
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 2
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PRESSURE PROFILE REPORT Date: 16-09-2019
======================================================================================================================================================
Circuit Feed 1
-----------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
FW Tank Feed to Unit 0.6 0.711 -0.62 0 0.6204
L1 Pipe 75.18 1,000 1.0 6 40 17.0 0.325 3.68 0.854 -0.413 0.6204 1.033
P1 Pump 0 -158 1.033 159.4
L2 Pipe 75.18 1,000 1.0 6 40 80.0 0.325 3.68 0 1.27 159.4 158.2
T1 Tee piece 0 158.2
Circuit Junction 1 : 1
---------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
J1 Junction 0 157.5
L12 Pipe 11.4 1,000 1.0 4 40 1.0 0.0751 1.26 0 0.00246 157.5 157.5
Shed Product from Unit 0 0 0 157.5 157.5
Circuit T-Piece 1 : 2
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T1 Tee piece 0 158.2
L11 Pipe 27.3 1,000 1.0 6 40 200 0.0499 1.33 0 0.358 158.2 157.8
R3 Expander/Reducer K = 1.44 0 0.0671 157.8 157.7
L5 Pipe 27.3 1,000 1.0 4 40 25.0 0.373 3.03 0 0.493 157.7 157.2
PumpHous Product from Unit 0 0 0 157.2 157.2
Circuit T-Piece 1 : 3
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T1 Tee piece 0 158.2
L6 Pipe 47.88 1,000 1.0 6 40 70.0 0.14 2.34 0 0.366 158.2 157.9
T3 Tee piece 0 157.9
Circuit T-Piece 2 : 1
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T4 Tee piece 0 157.7
L10 Pipe 19.2 1,000 1.0 6 40 10.0 0.0264 0.939 0 0.0387 157.7 157.7
R1 Expander/Reducer K = 1.44 0 0.0332 157.7 157.6
L12 Pipe 19.2 1,000 1.0 4 40 60.0 0.195 2.13 0 0.427 157.6 157.2
TWGantry Product from Unit 0 0 0 157.2 157.2
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 3
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PRESSURE PROFILE REPORT Date: 16-09-2019
======================================================================================================================================================
Circuit T-Piece 2 : 2
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T4 Tee piece 0 157.7
L9 Pipe 11.4 1,000 1.0 4 40 60.0 0.0751 1.26 0 0.177 157.7 157.5
J1 Junction 0 157.5
Circuit T-Piece 3 : 1
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T3 Tee piece 0 157.9
L7 Pipe 17.28 1,000 1.0 6 40 90.0 0.0218 0.845 0 0.0764 157.9 157.8
R2 Expander/Reducer K = 5.68 0 0.0959 157.8 157.7
L12 Pipe 17.28 1,000 1.0 3 40 20.0 0.613 3.3 -17.1 17.5 157.7 140.2
T-678 Product from Unit 12 0 0 140.2 140.2
Circuit T-Piece 3 : 3
-------------------------
Number Description Flow Density Visc Dia Sch Length dP/L Velocity Elev dPelev dPin-out Pin Pout
t/h kg/m3 cP in m psi/100ft ft/s m psi psi psig psig
T3 Tee piece 0 157.8
L8 Pipe 30.6 1,000 1.0 6 40 70.0 0.0615 1.5 0 0.152 157.8 157.7
T4 Tee piece 0 157.7
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 4
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================
-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L1 | L2 | L12 | L11
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
PROCESS DATA | AVG IN OUT | AVG IN OUT | AVG IN OUT | AVG IN OUT
Temperature C | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0
Pressure psig | 0.8267 0.6204 1.033 | 158.8 159.4 158.2 | 157.5 157.5 157.5 | 158.0 158.2 157.8
Liq Fraction wt | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0
Total-Flow t/h | 75.18 | 75.18 | 11.4 | 27.3
Dens-NS kg/m3 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000
Elev kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc-NS cP | 1.0 | 1.0 | 1.0 | 1.0
Vapor-Flow t/h | 0 | 0 | 0 | 0
Density kg/m3 | 1.21 | 13.5 | 13.4 | 13.4
Visc cP | 0.010 | 0.010 | 0.010 | 0.010
Mol wt | 28.0 | 28.0 | 28.0 | 28.0
Z | 1.0 | 1.0 | 1.0 | 1.0
Cp/Cv | 1.4 | 1.4 | 1.4 | 1.4
Liquid-Flow (wt) t/h | 75.18 | 75.18 | 11.4 | 27.3
Flow (vol) m3/h | 75.18 | 75.18 | 11.4 | 27.3
Density kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc cP | 1.0 | 1.0 | 1.0 | 1.0
PIPE DATA | | | |
Size in | 6 | 6 | 4 | 6
Length m | 17.0 | 80.0 | 1.0 | 200
Schedule | 40 | 40 | 40 | 40
ID mm | 154 | 154 | 102 | 154
Roughness (E-3) mm | 45.7 | 45.7 | 45.7 | 45.7
Safety factor | 1.0 | 1.0 | 1.0 | 1.0
Sum of elev's m | 0 | 0 | 0 | 0
VELOCITY | | | |
Velocity ft/s | 3.68 3.68 3.68 | 3.68 3.68 3.68 | 1.26 1.26 1.26 | 1.33 1.33 1.33
Sonic-Vapor adia ft/s | 1,155 | 1,155 | 1,155 | 1,155
Vapor isoT ft/s | 976 | 976 | 976 | 976
PRESSURE DROP (In-Out) | | | |
Overall psi | -0.4125 | 1.266 | 0.002464 | 0.3576
Friction psi | 0.4412 | 1.266 | 0.002464 | 0.3576
Accel'n psi | 0 | 0 | 0 | 0
Static psi | -0.8537 | 0 | 0 | 0
dP/Length psi/100ft | 0.325 | 0.325 | 0.0751 | 0.0499
LINE SIZING | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER
dP/Length psi/100ft | 0.999 | 0.999 | 0.999 | 0.999
Velocity ft/s | 328 0.984 | 328 0.984 | 328 0.984 | 328 0.984
VelCoef ft/s | 12.4 1.04 | 12.4 1.04 | 12.4 1.04 | 12.4 1.04
Size-Larger/Small in | 8 4 | 8 4 | 6 3 | 8 4
dP/Length psi/100ft | 0.0836 2.53 | 0.0836 2.53 | 0.0103 0.284 | 0.0132 0.373
Velocity ft/s | 2.12 8.34 | 2.12 8.34 | 0.557 2.18 | 0.771 3.03
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 5
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================
-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L1 | L2 | L12 | L11
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
LIQUID HOLDUP | | | |
Liquid Fraction (vol) | 1.0 | 1.0 | 1.0 | 1.0
Liquid Holdup(dP) (vol) | 1.0 | 1.0 | 1.0 | 1.0
2-PHASE METHOD | Homogeneous | Homogeneous | Homogeneous | Homogeneous
FLOW REGIME | | | |
Horizontal | - | - | - | -
Vertical-Up | - | - | - | -
Vertical-Down | - | - | - | -
HOMOGENEOUS/DUKLER | | | |
Reynolds No | 172,606 | 172,606 | 39,431 | 62,681
Friction factor | 0.01802 | 0.01802 | 0.02338 | 0.02103
Friction factor (turb) | 0.01489 | 0.01489 | 0.01627 | 0.01489
Dukler-2phase factor | 1.00 | 1.00 | 1.00 | 1.00
density kg/m3 | 0 | 0 | 0 | 0
LOCKHART-M/CHENOWETH-M | | | |
Liquid-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi/Psi^2 | 0 | 0 | 0 | 0
Vapor-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi^2 | 0 | 0 | 0 | 0
X factor | 0 | 0 | 0 | 0
FITTINGS | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K
| Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5
| Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1
| Gate valve 4 8 0 | Gate valve 2 8 0 | Gate valve 0 8 0 | Gate valve 1 8 0
| Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0
| Check 0 50 0 | Check 1 50 0 | Check 0 50 0 | Check 0 50 0
| Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0
| Elbow 6 20 0 | Elbow 8 20 0 | Elbow 0 20 0 | Elbow 5 20 0
| 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0
| T-Straight 2 20 0 | T-Straight 4 20 0 | T-Straight 0 20 0 | T-Straight 3 20 0
| T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0
| Other 0 0 | Other 0 0 | Other 0 0 | Other 0 0
Total K | 0 | 0 | 0 | 0
Total L/D | 192 | 306 | 0 | 168
Equiv Length m | 41.4 | 119 | 1.0 | 218
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 6
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================
-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L5 | L6 | L10 | L12
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
PROCESS DATA | AVG IN OUT | AVG IN OUT | AVG IN OUT | AVG IN OUT
Temperature C | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0
Pressure psig | 157.5 157.7 157.2 | 158.1 158.2 157.9 | 157.7 157.7 157.7 | 157.4 157.6 157.2
Liq Fraction wt | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0
Total-Flow t/h | 27.3 | 47.88 | 19.2 | 19.2
Dens-NS kg/m3 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000
Elev kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc-NS cP | 1.0 | 1.0 | 1.0 | 1.0
Vapor-Flow t/h | 0 | 0 | 0 | 0
Density kg/m3 | 13.4 | 13.5 | 13.4 | 13.4
Visc cP | 0.010 | 0.010 | 0.010 | 0.010
Mol wt | 28.0 | 28.0 | 28.0 | 28.0
Z | 1.0 | 1.0 | 1.0 | 1.0
Cp/Cv | 1.4 | 1.4 | 1.4 | 1.4
Liquid-Flow (wt) t/h | 27.3 | 47.88 | 19.2 | 19.2
Flow (vol) m3/h | 27.3 | 47.88 | 19.2 | 19.2
Density kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc cP | 1.0 | 1.0 | 1.0 | 1.0
PIPE DATA | | | |
Size in | 4 | 6 | 6 | 4
Length m | 25.0 | 70.0 | 10.0 | 60.0
Schedule | 40 | 40 | 40 | 40
ID mm | 102 | 154 | 154 | 102
Roughness (E-3) mm | 45.7 | 45.7 | 45.7 | 45.7
Safety factor | 1.0 | 1.0 | 1.0 | 1.0
Sum of elev's m | 0 | 0 | 0 | 0
VELOCITY | | | |
Velocity ft/s | 3.03 3.03 3.03 | 2.34 2.34 2.34 | 0.939 0.939 0.939 | 2.13 2.13 2.13
Sonic-Vapor adia ft/s | 1,155 | 1,155 | 1,155 | 1,155
Vapor isoT ft/s | 976 | 976 | 976 | 976
PRESSURE DROP (In-Out) | | | |
Overall psi | 0.4933 | 0.3656 | 0.0387 | 0.427
Friction psi | 0.4933 | 0.3656 | 0.0387 | 0.427
Accel'n psi | 0 | 0 | 0 | 0
Static psi | 0 | 0 | 0 | 0
dP/Length psi/100ft | 0.373 | 0.14 | 0.0264 | 0.195
LINE SIZING | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER
dP/Length psi/100ft | 0.999 | 0.999 | 0.999 | 0.999
Velocity ft/s | 328 0.984 | 328 0.984 | 328 0.984 | 328 0.984
VelCoef ft/s | 12.4 1.04 | 12.4 1.04 | 12.4 1.04 | 12.4 1.04
Size-Larger/Small in | 6 3 | 8 4 | 8 4 | 6 3
dP/Length psi/100ft | 0.0499 1.45 | 0.0365 1.07 | 0.0070 0.195 | 0.0264 0.746
Velocity ft/s | 1.33 5.22 | 1.35 5.31 | 0.542 2.13 | 0.939 3.67
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 7
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================
-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L5 | L6 | L10 | L12
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
LIQUID HOLDUP | | | |
Liquid Fraction (vol) | 1.0 | 1.0 | 1.0 | 1.0
Liquid Holdup(dP) (vol) | 1.0 | 1.0 | 1.0 | 1.0
2-PHASE METHOD | Homogeneous | Homogeneous | Homogeneous | Homogeneous
FLOW REGIME | | | |
Horizontal | - | - | - | -
Vertical-Up | - | - | - | -
Vertical-Down | - | - | - | -
HOMOGENEOUS/DUKLER | | | |
Reynolds No | 94,426 | 109,929 | 44,083 | 66,409
Friction factor | 0.02027 | 0.01918 | 0.02245 | 0.02136
Friction factor (turb) | 0.01627 | 0.01489 | 0.01489 | 0.01627
Dukler-2phase factor | 1.00 | 1.00 | 1.00 | 1.00
density kg/m3 | 0 | 0 | 0 | 0
LOCKHART-M/CHENOWETH-M | | | |
Liquid-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi/Psi^2 | 0 | 0 | 0 | 0
Vapor-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi^2 | 0 | 0 | 0 | 0
X factor | 0 | 0 | 0 | 0
FITTINGS | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K
| Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5
| Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1
| Gate valve 2 8 0 | Gate valve 0 8 0 | Gate valve 0 8 0 | Gate valve 1 8 0
| Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 1 340 0 | Globe valv 0 340 0
| Check 1 50 0 | Check 0 50 0 | Check 0 50 0 | Check 0 50 0
| Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0
| Elbow 5 20 0 | Elbow 4 20 0 | Elbow 0 20 0 | Elbow 3 20 0
| 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0
| T-Straight 1 20 0 | T-Straight 0 20 0 | T-Straight 0 20 0 | T-Straight 1 20 0
| T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0
| Other 0 0 | Other 0 0 | Other 0 0 | Other 0 0
Total K | 0 | 0 | 0 | 0
Total L/D | 186 | 80 | 340 | 88
Equiv Length m | 40.3 | 79.6 | 44.7 | 66.9
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 8
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================
-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L9 | L7 | L12 | L8
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
PROCESS DATA | AVG IN OUT | AVG IN OUT | AVG IN OUT | AVG IN OUT
Temperature C | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0 | 25.0 25.0 25.0
Pressure psig | 157.6 157.7 157.5 | 157.8 157.9 157.8 | 149.0 157.7 140.2 | 157.8 157.8 157.7
Liq Fraction wt | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0 | 1.0 1.0 1.0
Total-Flow t/h | 11.4 | 17.28 | 17.28 | 30.6
Dens-NS kg/m3 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000 | 1,000 1,000 1,000
Elev kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc-NS cP | 1.0 | 1.0 | 1.0 | 1.0
Vapor-Flow t/h | 0 | 0 | 0 | 0
Density kg/m3 | 13.4 | 13.4 | 12.7 | 13.4
Visc cP | 0.010 | 0.010 | 0.010 | 0.010
Mol wt | 28.0 | 28.0 | 28.0 | 28.0
Z | 1.0 | 1.0 | 1.0 | 1.0
Cp/Cv | 1.4 | 1.4 | 1.4 | 1.4
Liquid-Flow (wt) t/h | 11.4 | 17.28 | 17.28 | 30.6
Flow (vol) m3/h | 11.4 | 17.28 | 17.28 | 30.6
Density kg/m3 | 1,000 | 1,000 | 1,000 | 1,000
Visc cP | 1.0 | 1.0 | 1.0 | 1.0
PIPE DATA | | | |
Size in | 4 | 6 | 3 | 6
Length m | 60.0 | 90.0 | 20.0 | 70.0
Schedule | 40 | 40 | 40 | 40
ID mm | 102 | 154 | 77.9 | 154
Roughness (E-3) mm | 45.7 | 45.7 | 45.7 | 45.7
Safety factor | 1.0 | 1.0 | 1.0 | 1.0
Sum of elev's m | 0 | 0 | 0 | 0
VELOCITY | | | |
Velocity ft/s | 1.26 1.26 1.26 | 0.845 0.845 0.845 | 3.3 3.3 3.3 | 1.5 1.5 1.5
Sonic-Vapor adia ft/s | 1,155 | 1,155 | 1,155 | 1,155
Vapor isoT ft/s | 976 | 976 | 976 | 976
PRESSURE DROP (In-Out) | | | |
Overall psi | 0.1773 | 0.07641 | 17.48 | 0.152
Friction psi | 0.1773 | 0.07641 | 0.4021 | 0.152
Accel'n psi | 0 | 0 | 0 | 0
Static psi | 0 | 0 | 17.07 | 0
dP/Length psi/100ft | 0.0751 | 0.0218 | 0.613 | 0.0615
LINE SIZING | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER | MAX/LARGER MIN/SMALLER
dP/Length psi/100ft | 0.999 | 0.999 | 0.999 | 0.999
Velocity ft/s | 328 0.984 | 328 0.984 | 328 0.984 | 328 0.984
VelCoef ft/s | 12.4 1.04 | 12.4 1.04 | 12.4 1.04 | 12.4 1.04
Size-Larger/Small in | 6 3 | 8 4 | 4 2 | 8 4
dP/Length psi/100ft | 0.0103 0.284 | 0.0058 0.16 | 0.16 4.43 | 0.0162 0.462
Velocity ft/s | 0.557 2.18 | 0.488 1.92 | 1.92 7.27 | 0.864 3.4
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 9
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PIPE LINE REPORT Date: 16-09-2019
======================================================================================================================================================
-----------------------------------------------------------------------------------------------------------------------------------------------------
Line number | L9 | L7 | L12 | L8
Line name | Pipe | Pipe | Pipe | Pipe
-----------------------------------------------------------------------------------------------------------------------------------------------------
LIQUID HOLDUP | | | |
Liquid Fraction (vol) | 1.0 | 1.0 | 1.0 | 1.0
Liquid Holdup(dP) (vol) | 1.0 | 1.0 | 1.0 | 1.0
2-PHASE METHOD | Homogeneous | Homogeneous | Homogeneous | Homogeneous
FLOW REGIME | | | |
Horizontal | - | - | - | -
Vertical-Up | - | - | - | -
Vertical-Down | - | - | - | -
HOMOGENEOUS/DUKLER | | | |
Reynolds No | 39,431 | 39,675 | 78,431 | 70,256
Friction factor | 0.02338 | 0.02292 | 0.02134 | 0.02061
Friction factor (turb) | 0.01627 | 0.01489 | 0.0173 | 0.01489
Dukler-2phase factor | 1.00 | 1.00 | 1.00 | 1.00
density kg/m3 | 0 | 0 | 0 | 0
LOCKHART-M/CHENOWETH-M | | | |
Liquid-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi/Psi^2 | 0 | 0 | 0 | 0
Vapor-Re | 0 | 0 | 0 | 0
f | 0 | 0 | 0 | 0
Psi^2 | 0 | 0 | 0 | 0
X factor | 0 | 0 | 0 | 0
FITTINGS | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K | TYPE No L/D K
| Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5 | Entrance 0 0 0.5
| Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1 | Exit 0 0 1
| Gate valve 1 8 0 | Gate valve 1 8 0 | Gate valve 0 8 0 | Gate valve 1 8 0
| Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0 | Globe valv 0 340 0
| Check 0 50 0 | Check 0 50 0 | Check 0 50 0 | Check 0 50 0
| Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0 | Stop-check 0 400 0
| Elbow 7 20 0 | Elbow 7 20 0 | Elbow 0 20 0 | Elbow 1 20 0
| 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0 | 180 Bend 0 50 0
| T-Straight 1 20 0 | T-Straight 1 20 0 | T-Straight 0 20 0 | T-Straight 1 20 0
| T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0 | T-Branch 0 60 0
| Other 0 0 | Other 0 0 | Other 0 0 | Other 0 0
Total K | 0 | 0 | 0 | 0
Total L/D | 168 | 168 | 0 | 48
Equiv Length m | 72.0 | 107 | 20.0 | 75.3
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 10
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
FEED SUMMARY Date: 16-09-2019
======================================================================================================================================================
Number Description Elevation Density Level Rel Elev Rel Pres dP Level dP Inlet Pres
m kg/m3 m m psi psi psi psig
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 11
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PRODUCT SUMMARY Date: 16-09-2019
======================================================================================================================================================
Number Description Elevation Density Level Rel Elev Rel Pres dP Level dP Inlet Pres
m kg/m3 m m psi psi psi psig
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 12
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
PUMP SUMMARY Date: 16-09-2019
======================================================================================================================================================
Number Description Eff Power Flow Density Vol Flow Head Pout-Pin PresIn PresOut
kW t/h kg/m3 m3/h m psi psig psig
P1 Pump 1.0 22.8 75.2 1,000 75.2 111 158 1.03 159
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 13
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
T-PIECE SUMMARY Date: 16-09-2019
======================================================================================================================================================
NOTES - (1) dP Inlet for Feed, Products and Vessels represent pressure to velocity conversion only, not friction.
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat
======================================================================================================================================================
Hydraulic Simulation: Pump House Pool Fi This information is confidential, and shall Page: 14
Technical Audit of Existing Fire Fightin not be reproduced by any means without the Proj: 2901-001
at Bulawayo Depot written permission of PETROCHEMICAL ENGINEERING CONSULTANTS . By : SMR
Vivo Energy - Zimbabwe Chkd/Apvd: MZK / SMS
WARNINGS & ERRORS Date: 16-09-2019
======================================================================================================================================================
======================================================================================================================================================
C:\Users\mohsi\OneDrive\Desktop\PEC\Bulawayo\Pump House Pool Fire.dat