Duties Before Welding
Duties Before Welding
Identification of welders qualification for each WPS to be used and all welder qualification certificates are valid.
The minimum temperature for Preheat (if required) is in accordance with WPS.
Ensure weather conditions are suitable / comply with Code (conditions will not affect welding) when on-site / field welding.
Preheat (if required) minimum temperature is being maintained in accordance with WPS.
Welding consumables are in accordance with WPS and being controlled as the procedure.
Welding parameters e.g. Current, volts, travel speed are in accordance with WPS.
Root run is visually acceptable to Code before filling the joint (for single sided welds).
Gouging / grinding only allowed by an approved method and to good workmanship standard.
The welder is on the approval register /qualified for the WPS being used.
Each weld is marked with the welder’s identification and is identified in accordance with drawing/weld map.
Ensure welds appearance is suitable for all NDT (profile, cleanness, etc) and visually inspect welds and sentence in accordance with Code.
Ensure all NDT is complete and reports are available for records.
Monitor PWHT process (if required) for compliance with the procedure (check chart record).
Ensure test equipment for Pressure/load test (if required) is calibrated. Monitor test to ensure compliance with procedure/Code and ensure reports/records are available.