0% found this document useful (0 votes)
518 views

F16 Machine Abnormality Report

The document is a machine abnormality report from Asman Kadir Engineering & Fabrication Sdn Bhd. It records details of a problem with a machine, including the department, machine name, description of the problem, time and date it stopped working, who requested repairs and when they are needed by. The maintenance department section acknowledges receipt of the report with date and time, and notes if an external requisition is needed. It will record work done, date, and status for verification by the department concerned.

Uploaded by

jasoncwh64
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
518 views

F16 Machine Abnormality Report

The document is a machine abnormality report from Asman Kadir Engineering & Fabrication Sdn Bhd. It records details of a problem with a machine, including the department, machine name, description of the problem, time and date it stopped working, who requested repairs and when they are needed by. The maintenance department section acknowledges receipt of the report with date and time, and notes if an external requisition is needed. It will record work done, date, and status for verification by the department concerned.

Uploaded by

jasoncwh64
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

ASMAN KADIR ENGINEERING & FABRICATION SDN BHD

Machine Abnormality Report


(A) To be filled by department concerned

Dept :

Machine :
Description of problem
Masalah yang dihadapi

Time Stop : Date Stop :


Waktu berhenti Tarikh Berhenti

Requested by : Needed by ( Date / Time)


Diminta oleh Bila diperlukan (Tarikh/Masa)
Name :
Nama
Position :
Jawatan
Date :
Tarikh

(B) To be filled by Maintenance Dept.

Acknowledgement of Receipt Reference :

Date : Time :

Tarikh : Masa :

Ext. Requisition Needed Yes ________________________________________

No

Work done by

Date

(C) Verification by department concerned

Status
Remarks
AKEF-OP-F16, Rev #: 0

You might also like