Self-Assessment Guide (Sample) Program/Course: Unit of Competency

This self-assessment guide provides questions for an individual to self-evaluate their ability to perform roughing-in activities, wiring, and cabling works for single-phase distribution, power, lighting, and auxiliary systems. It contains questions on interpreting drawings, determining material quantities, selecting tools, installing conduit, following safety procedures, and more. The individual indicates whether they can or cannot perform each task. Upon completion, the individual signs and dates the assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views

Self-Assessment Guide (Sample) Program/Course: Unit of Competency

This self-assessment guide provides questions for an individual to self-evaluate their ability to perform roughing-in activities, wiring, and cabling works for single-phase distribution, power, lighting, and auxiliary systems. It contains questions on interpreting drawings, determining material quantities, selecting tools, installing conduit, following safety procedures, and more. The individual indicates whether they can or cannot perform each task. Upon completion, the individual signs and dates the assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

SELF-ASSESSMENT GUIDE (Sample)

Program/Course: Electrical Installation and Maintenance NC II


Unit of Competency: Perform roughing-in activities, wiring and cabling
works for single-phase distribution, power,
lighting and auxiliary systems
Instruction:
 Read each of the questions in the left-hand column of the chart.
 Place a check in the appropriate box opposite each question to
indicate your answer.

CAN I…? YES NO


Interpret correct drawing base on job requirements
Determine correct quantities of conduit, fittings and
accessories as per job requirements
Select tools and equipment as per job requirements
Perform assembling of conduit ensuring that fittings are fully
inserted and tightened as per job requirements
Perform conduit bending not exceeding 90° as per job
requirements
Install conduit couplings and elbows as per job requirement
Check conduit is well threaded in line as per job
requirements
Follow safety procedures with standard operating procedures
(SOPs)
Interpret correct drawings as of job requirements
Select correct materials quantities as of job requirements
Select tools and equipment as per job requirements
Install wire ways and cable trays as per job requirements.
Follow safety procedures with standard operating procedures
(SOPs)
Interpret correct drawing base on job requirements
Select correct materials quantities as of job requirements
Select tools and equipment as per job requirements
Install Auxiliary terminal cabinet as per job requirements
Install Auxiliary main distribution frame as per job
CAN I…? YES NO
requirements
Follow safety procedures with standard operating procedures
(SOPs)
Prepare necessary tools, equipment, materials and personal
protective equipment (PPE) in line with job requirements.
Identify cable pulling & installation requirements and
constraints from plan and site inspection as per job
requirements.
Install Cable lay out equipment is set up in accordance with
manufacturer's and job requirements
Install cable made safe and secure in site
Select suitable protective clothing and required safety
devices are used
Assess support structure as safe for normal working
conditions
Follow safety procedures based on safety regulations PPE are
identified and selected in line with safety requirements
Identify tools, equipment, pulling compound and safety
requirements are obtained for the lay out and installation
Install pulling materials properly and tensioned to required
specifications
Install Cable secured permanently to support structure in
accordance with standard procedures
Observe bending radius and loops tolerance for cable
materials at all times
Follow schedule of wire cutting lists based on estimates,
quantity and sizes to avoid wastage
Further instructions are sought if unplanned events or
conditions occur
Check of quality of work is done in accordance with
instructions and requirements
Conform final check are made to ensure that work with
instructions and job requirements
Notify Supervisor upon completion of work
Check Tools, equipment and any surplus resources and
materials are, where appropriate, cleaned and returned to
storage in accordance with established procedures
Clean up work area and made safe according to OHSA
regulations

Candidate’s Signature: Date: