50% found this document useful (2 votes)
3K views28 pages

Final BOQ For Bridges

This document is a bill of quantities for the construction of a road project from Dalbari to Dagapela in Bhutan. It includes 3 sections - general items, dismantling items, and site clearance. Under general items are insurance, site establishment including labor camps and offices, utilities, site notices, and establishing a field laboratory. Dismantling items includes shifting electric poles. Site clearance covers clearing vegetation, cutting trees, and collecting topsoil. The bulk of the work is outlined in bill number 4 for road formation and cutting, which includes earthwork and rock cutting, transportation of excess material, bypass road construction, embankment work, placement of boulders and geotextiles. P

Uploaded by

dhaval2011
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
3K views28 pages

Final BOQ For Bridges

This document is a bill of quantities for the construction of a road project from Dalbari to Dagapela in Bhutan. It includes 3 sections - general items, dismantling items, and site clearance. Under general items are insurance, site establishment including labor camps and offices, utilities, site notices, and establishing a field laboratory. Dismantling items includes shifting electric poles. Site clearance covers clearing vegetation, cutting trees, and collecting topsoil. The bulk of the work is outlined in bill number 4 for road formation and cutting, which includes earthwork and rock cutting, transportation of excess material, bypass road construction, embankment work, placement of boulders and geotextiles. P

Uploaded by

dhaval2011
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 28

DEPARTMENT OF ROADS

ORIO PROJECT
CONSTRUCTION OF DALBARI - DAGAPELA SNH (KM 29.00+49.00)

BILL OF QUANTITIES

Section B - Odalthang- Gesarling (29.00km - 49.00 km new construction)

Item No. Description Unit Quantity Rate (BTN) Amount (BTN)


In figures In words

BILL No. 1: GENERAL ITEMS


Provide insurance cover from the start date to the end of the Defects Liability Period for Contractor's All Risk
1 (Works, Plants and Materials, Loss or Damage to Equipment and Third Party Liability [100]
1.1 a All risk insurance LS 1.00
1.1 b Personal injury or death LS 1.00

1.20 Installation of labour camps, contractors site office, accomodation, stores, cement godown and other necessities
according to environment code of practice[100, 2300].
Install labour/employee camps, contractors site office, accomodation, stores, cement godown, equipment yards,
workshops, according to ECoP [100,2300].
Site establishment LS 1.00

1.3 Provide safe water supply, bath/wash rooms, pit latrines including water connection to toilets, dust bins, solid waste
disposal, septic tanks & soak pits, fire extenquisher, personnel protective equipment and provision of adequate
lights as per ECoP to workers/employees[100, 2300]

Services, safety & sanitary etc LS 1.00

1.4 Construct Site Office for PMU including furniture [100]


Construct. PMU site office, furnitures each 1.00

Erect and maintain notice boards at each end of the site [100]
1.5 Construction site notice board each 4.00

1.6 Provide support staff to the Engineer's Representative's Office and Material Testing Laboratory [100]
1.6a Office Assistant for PMU office mm 36.00
1.6b Lab technician mm 24.00
1.6c Lab Boy mm 24.00

1.7 Establish, equip, operate and maintain Field laboratory as per Drawing [100, 400]
1.7 (a) Const., establish & operate field lab. LS 1.00

1.7 (b) Provide field lab test equipment as per schedule


Provide lab. testing equipments LS 1.00
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
1.7 (c) Provide and maintain all necessary services and consumables to Field Laboratory in quantities
specified Months 33.00

1.7 (d) Provide and maintain telephone including communication charges (STD and email/internet services) to Months 33.00
Field laboratory in quantities specified

SUB TOTAL FOR BILL NO. 1

BILL NO. 2: DISMANTLING ITEMS

2.1 Dismantling and shifting of electrical post, LT line including all materials and labour complete [100]
Shifting of electric poles each 5.00

SUB TOTAL FOR BILL No. 2

BILL NO. 3: SITE CLEARANCE


3.1 Clearing of vegetations and trees of girth < 300 mm, disposal within 50 m of the site [600]
Clearing of vegetation, lead 50m sqm 330000.00

3.2 Cutting trees including removal of stumps and their roots and backfilling to required compaction [600]
3.2 a Girth above 300 to 600 mm each 1287.00
3.2 b Girth above 600 to 1200 mm each 715.00
3.2 c Girth above 1200 mm each 286.00

3.3 Collection of top soil up to 200 mm depth including decayed vegetation matter, grasses, roots, etc. and applying on
the freshly fill areas/slopes within 1000 m lead.[2000]
Collection and application of top soil sqm 45000.00

SUB TOTAL FOR BILL NO. 3

BILL NUMBER. 4: ROAD WORKS-FORMATION CUTTING


4.1 Earthwork in formation cutting, using excavator for 7.5m clear formation width including uprooting of vegetation and
trees, stacking of useful materials for re-use and disposal of surplus earth within 50m lead and all lift for all types of
soil and rock with or without blasting. Excavation of earthen drain with adequate slope as per typical cross sections.
The referential quantities for rock and earth cutting is provided in BDS.

The construction methodology shall follow EFRC technic using controlled blasting, half tunnelling/ and quarter
tunnelling wherever possible using Geo-tech reports. All excavation shall be carried out as per the plans and
sections of the alignment and minor adjustment shall be done to arrive at the best possible alignment, gradient and
at the same time most economical.

The Geo-technical and Environment reports shall be reffered at all time for compliance with ECOP (Environment
code of practice).[700]
All types of soil & rock with or without blasting mtr 20200.00

4.2 Transportation and handling of excess disposable material with lead [700]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
4.2 a beyond 50 m up to 500 m cum 342607.00
4.2 b beyond 500 m up to 1000 m cum 171303.00
4.2 c Beyond 1000 m cum 57101.00

4.3
Construction of by-pass road for access to the site including earth works subgrade strengthening using stone
soling/grannular sub-base filling using quarry material. The by-pass road shall be trafficable for machineries, heavy
vehicles and 4-wheel drive light vehicles. The by-pass road shall be maintained and kept trafficable at all times.

By-pass road construction and maintenance mtr 2300.00

4.4 Construction of embankment incl embankment over rockfill/shoulder with an approved material deposited at site
from roadway cutting including lead and lift upto 300 m [700, 900]
Rockfill embankment cum 25152.00

4.5 Segregation and placing of boulders on the face of rockfill [700]


Segregation and placing of boulders cum 165.00

4.6 Spreading and trackrolling upper part accessible by excavator or dozer [700]
Spreading and compacting cum 165.00

4.7 Supply and place of geotextile as per drawings [700]


Geotextile materials sqm 550.00

SUB TOTAL FOR BILL NO. 4

BILL No. 5: PAVEMENT WORKS


5.1 Preparation of sub grade with proper camber by excavating earth to depth equal to pavement thickness,
consolidation with roller, disposal of surplus earth within 50m lead (ref specification RW 0121 & RW 0123). All types
of soil and rock with or without blasting [900]

Preparation of sub-grades sqm 121000.00

5.2 Providing and laying Granular sub-base course (GSB) to required grade for laying and compacted to required
density as per material gradation and aggregate quality specified. Materials to be obtained from excavation up to a
lead of 5km [1000]

Granular sub-base cum 873.00

5.3 Providing and laying wet mix macadam graded aggregate base course to required degree of compaction with
proper formation of camber by using well graded crushed aggregates premixed with OMC using suitable mixture,
motor grader as per material gradation and aggregate quality specified.[1100]

Wet mix macadam 200mm thick cum 16940.00

5.4 Finishing of road shoulder by excavating, levelling and compaction with roller maintaining proper gradiant and level
with the adjacent pavement.[1100]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
Supply & placing of shoulder materials sqm 66000.00

5.5 Scarifying metalled (water bound) road surface disposal of rubbish up to 50m and consolidation of the aggregate
received from scarifying [1200\
Scarifying WMM sqm 80000.00

5.6 Supply and apply Primer seal @ 0.9 l/sqm as per specifiication including surface preparation[1300]
Supply & apply primer seal sqm 80000.00

5.7 Providing and laying Asphalt/Bituminous concrete to required degree of compaction based on the job mixture
design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller etc. as per Materials
gradation and aggregate quantity specified : 40mm [1300]

Asph. bitumin concrete pavement sqm 80000.00

SUB TOTAL FOR BILL NO. 5

BILL No. 6: WALLS


6.1 Providing and laying RRM retaining wall in stone masonry in CM 1:5 including earthwork in foundation, plastered
and white washed parapets, weepholes, bond stones, top PCC 1:2:4 50mm thick, base PCC 1:3:6 150mm thick,
backfilling using 50% stone and 50% soil (without organic materials). The item shall also include providing and
fixing of hard bond stone @1.5m c/c every alternate layer, the external face of the masonry shall be in coursed
layer with hammer dressed stones finished with neat flush pointing complete as per drawing. The rate shall be
quoted per metr length of the wall. [1400, 1700]

6.1 a Masonry R/ wall av. Height 2.5 mtr mtr 190.00


6.1 b Masonry R/ wall av. Height 3.0 mtr mtr 321.00
6.1 c Masonry R/ wall av. Height 3.5 mtr mtr 188.00
6.1 d Masonry R/ wall av. Height 4.0 mtr mtr 221.00
6.1 e Masonry R/ wall av. Height 4.5 mtr mtr 208.00
6.1 f Masonry R/ wall av. Height 5.0 mtr mtr 39.00
6.1 g Masonry R/ wall av. Height 6.0 mtr mtr 285.00
6.1 h Masonry R/ wall av. Height 7.0 mtr mtr 196.00
6.1 i Masonry R/ wall av. Height 8.0 mtr mtr 240.00
6.1 j Masonry R/ wall av. Height 9.0 mtr mtr 69.00

6.2 Providing and laying composit masonry retaining/breast wall in RRM 1:4 CM including parapet, weepholes, bond
stones, top PCC 1:2:4 50mm thick, backfilling using 50% stone and 50% soil (without organic materials). The item
shall also include providing and fixing of hard stone bond stone @1.5m c/c every alternate layer, the external face
of the masonry shall be in coursed layer with hammer dressed stones finished with neam flush pointing. [1400]

6.2 a Masonry comp. wall or b/wall Ht 2.5mtr mtr 164.00


6.2 b Masonry comp. wall or b/wall Ht 3.0mtr mtr 137.00
6.2 c Masonry comp. wall or b/wall Ht 3.5mtr mtr 215.00
6.2 d Masonry comp. wall or b/wall Ht 4.0mtr mtr 105.00
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
6.2 e Masonry comp. wall or b/wall Ht 4.5mtr mtr 105.00
6.2 f Masonry comp. wall or b/wall Ht.5.0mtr mtr 105.00

6.3 Construction of gabion wall as per drawings, including excavation of foundations, sides and back filling, delivery of
materials etc. complete. The height of the wall shall be measured from the bottom of the gabion foundation to the
top of the gabion wall. The wire diameter for gabion box shall be: wire netting 2.7mm, selvedge wire 3.4mm, binding
and bracing wire 2.4mm. The hexagonal mesh size shall be 100mmx120mm with minimum 3 twists.[1600]

6.3 a Gabion stone wall av. Height 1.0 mtr mtr 64.00
6.3 b Gabion stone wall av. Height 2.0mtr mtr 573.00
6.3 c Gabion stone wall av. Height 3.0mtr mtr 40.00
6.3 d Gabion stone wall av. Height 4.0mtr mtr 34.00
6.3 e Gabion stone wall av. Height 5.0mtr mtr 24.00

SUB TOTAL FOR BILL NO. 6

BILL NO. 7: PIPE CULVERT


Providing and constructing hume pipe culvert using NP3 900Ø and 1200Ø dia hume pipe over a granular
compacted bed, and well compacted backfill on top min 600mm height etc complete.
7.1 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10sqm on plan, including dressing
& ramming, disposal of surplus soil within 50m lead & 1.5m lift.[700, 1800]
Earthwork in excavation cum 2734.00

7.2 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc, within
lead 50m & lift 1.5m [700]
Backfilling in foundation cum 1843.00

7.3 Providing and laying in position plain cement concrete 1:2:4, 40mm and down gauge aggregates excluding the cost
of centering and shuttering in foundation [1700]
PCC 1:2:4. 40mm down agg. cum 200.00

7.4 Providing and laying Random Rubble Masonry with hard stone in foundation and plinth in cm 1:5 [1500]
RRM in cm 1:5 cum 1399.00

7.5 Providing and laying of 20mm cement plaster in CM 1:4 including adequate curing [1700]
20mm plaster in CM 1:4 sqm 345.00

7.6 Supply and place RCC hume pipe 1200 dia class NP3 including collar at designated location as per drawing no
[1800]
RCC hume pipe NP3, 1200 Ø mtr 40.00

7.7 Supply and place RCC hume pipe 900 dia class NP3 including collar at designated location as per drawing no
[1800]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
RCC hume pipe NP3, 900 Ø mtr 653.00

7.8 Providing and laying of Granular sub-base filling to required degree of compaction and cross fall as base for hume
pipes as per drawing. [1200]
Granular sub-base filling cum 561.00

7.9 Providing and painting White washing on new works, three or more layers. [200]
White washing sqm 345.00

7.10 Providing and laying of stone pitching or stone soling in hard stones, hammer dressed.[1400]
Stone pitching/ soling, hammer dressed cum 34.00

7.11 Providing and constructing of gabion wall ht upto 1.00m with dry stone masonry, GI wire mesh 2.70mm dia.[1600]

Gabion wall 1.00mtr ht. 2.7mm GI wire mtr 231.00

7.12 Supply and place RCC hume pipe 600 dia class NP3 including collar at designated location as relief cross drainge
as per drawing no [1800]

RCC hume pipe 600 dia NP3 mtr 55.00

SUB TOTAL FOR BILL NO. 7

BILL NO. 8: RCC SLAB CULVERT


Providing and constructing of RCC slab culvert in rrm masonry supporting wall with bond stones, weep holes etc,
rcc slab with edge barrier and GI pipe railings on either side. The RCC slab culvert are provided for a clear span of
3m, 4m and 5m.[700,1400,1700]

8.1 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10sqm on plan, including dressing
& ramming, disposal of surplus soil within 50m lead & 1.5m lift.[700]
Earthwork in excavation cum 1839.00

8.2 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc, within
lead 50m & lift 1.5m [700]
Backfilling in foundation cum 1530.00

8.3 Providing and laying of plain cement concrete M10 (1:3:6) using 40mm and down grade aggregates excluding the
cost of formworks in foundation [1700]
PCC M10 (1:3:6) in foundation cum 14.00

8.4 Providing and laying RCC M20 (1:1.5:3), in slab, using graded aggregates excluding the cost of formworks. [1700]

RCC M20 (1:1.5:3) in slab cum 57.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words

8.5 Providing and fixing of formworks including centering and shuttering in foundation and slab. [1700]
Formworks in foundation/ slab sqm 248.00

8.6 Providing and laying of TMT steel including cutting, bending and binding etc. [1700]
TMT steel Reinforcement Fe 500 kgs 3959.00

8.7 Providing and laying RRM retaining wall in stone masonry in CM 1:5 including weepholes and bond stones @1.5m
c/c every alternate layer, the external face of the masonry shall be in coursed layer with hammer dressed stones
finished complete as per drawing. [1400]

RRM in cm 1:5 cum 126.00

8.8 Providing & Fixing GI Square Hollow Section 4mm thick as per drawings complete
GI Square Hollow Section Railing mtr 77.00

SUB TOTAL FOR BILL NO.8

BILL NO. 9: CAUSEWAY


9.1 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10sqm on plan, including dressing
& ramming, disposal of surplus soil within 50m lead & 1.5m lift. [1900]
Earthwork in excavation cum 1577.00

9.2 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc, within
lead 50m & lift 1.5m [700]
Backfilling in foundation cum 750.00

9.3 Providing and laying RCC M15 (1:2:4), in foundation, using graded aggregates excluding the cost of formworks.
[1700]
RCC M15 (1:2:4) in foundation cum 53.00

9.4 Providing and laying of TMT steel including cutting, bending and binding etc.[1700]
TMT steel Reinforcement Fe 500 kgs 1383.00

9.5 Providing and fixing of formworks including centering and shuttering in foundation and slab.[1700]
Formworks in foundation/ slab sqm 31.00

9.6 Providing and laying hard stone soling/ pitching hammer dressed complete.[1400]
Stone soling/ pitching cum 60.00

9.7 Providing and filling with hard stones as backfill including soreading and levelling [1400]
Stone filling cum 31.00
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
9.8 Providing and laying of RRM in cm 1:5 in foundation including bond stone as per specification etc complete.[1400]

RRM in cm 1:5 cum 136.00

SUB TOTAL FOR BILL NO.9

BILL NO. 10: DRAINS AND PROTECTIVE WORKS


10.1 Construct earthen lined catch drains as per drawing[1900]
Earth lined drain mtr 110.00

10.2 Construct lined L-shaped road side drain clear width 1000 mm with 75mm thick PCC 1:2:4, 150mm stone soling,
300mm thick RRM in CM 1:3 hill side, including excavation, leveling , including necessary form works and disposal
of surplus earth within 50m lead complete as per drawing.[1900]

L-shaped lined road side drain mtr 22220.00

10.3 Construct lined trapoizoidal shaped road side drain clear width 1000 mm with 75mm thick PCC 1:3:6, RRM in CM
1:4 hill side, including excavation, leveling , including necessary form works and disposal of surplus earth within
50m lead complete as per drawing for irrigation.[1900]

Trapoizoidal lined road side drain mtr 500.00

10.4 P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling & thrust block
- 160mm dia [700]
HDPE irrigation pipe 160 dia mtr 500.00

10.5 P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling & thrust block
- 225mm dia [700]
HDPE irrigation pipe 225 dia mtr 60.00

10.6 Construct of French drain, including any jungle clearance, earth work in excavation, levelling of excavated earth to
the sides and filling drain as per the drawing[1900]
10.6 a Drain size 0.6 x 1.0 m mtr 77.00
10.6 b Drain size 1.0 x 1.5 m mtr 44.00

10.7 Providing and constructing log barrier fell from the alignment of the road [1900]
Log barrier - protection works mtr 2200.00

10.8 Providing and constructing boulder barriers as directed by engineer [1900]


Boulder barrier - protection works mtr 2320.00

10.9 Construct trench barrier to protect downslopes from falling excavated materials of average size of 1.5m width, 2m
depth, placing excavated material on the down side forming barrier.[1900]
All types of soil and rock with or without blasting. mtr 2100.00
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
10.10 Supply and place boulder walls as specified or as directed by Engineer [1900]
Boulder wall - protection works cum 990.00

10.11 Supply and provide stone pitching as per drawings as directed by the engineer [1900]
Stone pitching - protection works sqm 275.00

10.12 Construct rock filled gabion check dam or masonry check dam on steep slopes, stream beds or as toe walls
[1500,1600]
Rock filled gabion check dam cum 165.00

10.13 Shotcreting of half tunneling/quarter tunneling & full tunelling in fractured and weak areas as directed by the
Engineer [1900]
Shotcreting of half tunnelling cum 550.00

10.14 Rock anchoring using 32mm dia rock bolts with base plates, centralizers, bolts and other accessories including
grouting complete as per drawing.[1900]
Rock anchorage mtr 28.00

SUB TOTAL FOR BILL NO. 10

BILL NO. 11: BIO-ENGINEERING WORKS


11.1 provide make and maintain temporary nursery with timber and bamboo matt construction of 150 sqm with a full time
caretaker, flexible 25mm dia water pipe, watering can, 2500 nos of polythene pots. The nursery shall be used for
developing plants and seeds for bioengineering purpose. [2000]
Temporary nursery for bio-engg. LS 1.00

11.2 Hand excavation, benching, trimming on steep slopes including necessary safety provisions [2000]
Hand excavation cum 1660.00
11.3 Supply and plant live pegs for palisades [2000] mtr 2200.00

11.4 Supply and place live pegs for brush layering [2000]
Brush layering mtr 550.00

11.5 Supply and construction of live check dams [2000]


Live check dam mtr 165.00

11.6 Grass and pioneer plant seed collection, including separation, drying in the sun and storing.[2300]
11.6 a (a) Alnus nepalensis (Utis) kgs 11.00
11.6 b (b) Artemesia (Titepati) kgs 9.00
11.6 c (c) Schima wallichii kgs 7.00
11.6 d (d) Any other shrubs/trees species (as directed by Project Manager) kgs 11.00
11.7 Broadcasting of grass/pioneer plants seeds on slopes; seeding rate 25 gm/m 2 [2000]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
Broadcasting of grass on slopes sqm 2000.00

11.8 Direct seeding of shrubs or tree seeds at 30 cm spacing including digging holes up to 5 cm depth and covering with
soil, with two seeds per planting hole. [2000]
Direct seeding sqm 5500.00

11.9 Planting of seedlings or wildlings (including the collection of wildlings from the wild) and planting them in a pit size
30 cm x 30 cm. [2000]
Planting, seedling or wildling each 1100.00

11.10 Turfing of embankment with 30 x 30 cm turfs and fixed to the ground with wooden pegs, if slope is greater than 25 °.
[1900, 2000]
Turfing-embankment sqm 550.00

11.11 Construction of wooden fencing (135 cm tall with 4 horizontal ballies) around bio-engineering sites as per sites or
as directed by the engineer. [2000]
Wooden fencing mtr 660.00

11.12 Plantating of compensatory tree/shrub plantation as directed by the environmental engineer [2000]
Planting compensatory trees/ shrubs sqm 220.00

SUB TOTAL FOR BILL NO. 11

BILL NO. 12: TRAFFIC SIGNS, ROAD MARKER STONES AND DELINEATORS
12.1 Supply and install precast RCC KM Post (small - single Km type) [2100]
Precast RCC KM stone-single Km type each 20.00

12.2 Supply and install precast RCC KM Post (largel - 5th Km type) [2100]
Precast RCC KM stone-5th Km type each 7.00

12.3 Supply and install precast RCC hetometer (200 m) Post [2100]
Precast RCC hetometer each 121.00

12.4 Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail,
70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to
centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process,
all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of
channel section 150 x 75 x 5 mm, 330 mm long all complete as per Technical specifications and as directed by the
Engineer-in-charge .[2100]

W-metal beam crash barrier mtr 4950.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
12.5 Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @
250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished
surface to be level, uniform and free from streaks and holes all complete as per Technical specifications and as
directed by the Engineer-in-charge.[2100]

12.5 a Centreline on sharp curves, Edge and other marking along strips sqm 3850.00
12.5 b Directional arrows and letters sqm 880.00

12.6 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign (incl wild animals signage) as
per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick
supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly
designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per
approved drawing all complete as per Technical specifications and as directed by the Engineer-in-charge [2100].

12.6 a 60 cm equilateral triangle each 50.00


12.6 b 60 cm circular each 33.00
12.6 c 60 cm x 45 cm rectangular each 55.00
12.6 d 80 cm x 60 cm rectangular each 33.00

12.7 Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high
intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting of 2 mm thick supported on a mild steel
single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly[ designed foundation with
M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing and all complete
as per Technical specifications and as directed by the Engineer-in-charge.[2100]

12.7 a Direction and Place Identification Signs upto 0.9 sqm Size Board. sqm 11.00
12.7 b Direction and Place Identification Signs with size more than 0.9 sqm size Board. sqm 6.00
12.8 Providing and fixing of road stud 100x 100 mm, die-cast in aluminium, resistant to corrosive effect of salt and grit,
fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm
and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973 [2100]

Road stud 100x100mm no 110.00

12.9 Providing and fixing of retro-reflectorised sheet of 100 mmx 50 mm on parapet, headwall and crash barriers,
railings etc, all complete as per Technical specifications and as directed by the Engineer-in-charge [2100].
Retro-reflectorised sheet sqm 55.00

SUB TOTAL FOR BILL NO. 12

BILL NO. 13: DAYS WORK


13.1 Providing of Labour for miscellaneous works not covered under the BoQ items as directed by the client. The item
rates includes administrative cost, supervision, tools and any other materials required to perform the assigned
work.
13.1 a Skilled (Mason Gr-I) md 220.00
13.1 b Skilled (Mason Gr-II) md 220.00
13.1 c Skilled (mechnic Gr-I) md 165.00
13.1 d Skilled carpenter Gr-I) md 110.00
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
13.1 e Unskilled md 550.00
13.1 f Machine operator (skilled) md 120.00
13.2 Providing of materials for miscellaneous works not covered under the BoQ items as directed by the client. The
item rates includes administrative cost, supervision, tools and any other materials required to perform the assigned
work.
13.2 a Cement MT 6.00
13.2 b Sand cum 22.00
13.2 c Stones/boulders cum 22.00
13.2 d Stone aggregates/chips cum 28.00

13.3 Providing of equipments for miscellaneous works not covered under the BoQ items as directed by the client. The
item rates includes administrative cost, supervision, tools and any other materials required to perform the assigned
work.
13.3 a Tipper truck (4-6 cu.m.) hrs 110.00
13.3 b Excavator ( 320 HP) hrs 240.00
13.3 c Wheel Loader (160 HP) hrs 88.00
13.3 d Vibratory roller (8-12 t) hrs 88.00
13.3 e Concrete Mixture (0.5 cu.m.) hrs 83.00
13.3 f Concrete Vibrator (4 HP, 63 mm dia) hrs 83.00
13.3 g Chain saw hrs 55.00

SUB TOTAL FOR BILL NO. 13

BILL NO. 14: BRIDGES


A. SAMA CHU BRIDGE (30m SPAN)
The contractor shall be deemed to have made himself fully acquainted with the full nature & complexity of the work,
the location and character of the site and means of access to the site.
The Contractor confirms also to be fully aware of the soil condition. The rate quoted for the soil excavation shall
apply for all the excavation materials; soil, earth, rock - hard and/or soft, requiring or not requiring blasting.
Thefore, while submitting the rates, the contractor has to estimate the proportion of various materials (soil, ordinary
rock, hard rock) in the excavation depending on the site condition and quote accordingly.

The excavation shall be paid as Solid Volume. Solid volume is the volume of excavation calculated directly
from the foundation dimensions of the structure without allowance for bulking, shrinkage, wastage,
working space, slope cutting etc. But the contractor has to be aware of the fact that the soil cannot be dug
vertically and that additional excavations would be required for getting the working space around the foundations,
slope cutting etc. and the contractor has to account for these additional quantities while setting rates for the
excavation works.

14. A. 1 Clearing & grubbing of site including uprooting all vegetation, grass, bush shrubs, saplings and trees of girth up to
300 mm, removal of stumps of trees of girth of all sizes including removing stumps of trees cut earlier and disposal
of unserviceable materials and stacking of serviceable materials as directed by engineer with all leads and lifts etc.
complete [2.2]

Clearing & grubbing sqm 275.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14. A . 2 Excavation of soil and storing the useful materials close to the abutments and foundations. This materials will be
used as backfilling around and behind foundation on both sides. However, the top layer of the soil containing
decomposible materials have to be disposed off to necessary leads. The quantity shall be paid as solid volume and
as a soil excavation irrespective of the nature and type of soil - sand , gravel, boulder or any type of rock requiring
or not requiring blasting [2.2]

Excavation of top soil cum 413.00

14. A . 3 Breaking of hard rocks using controlled blasting and disposal of unusable materials within necessary lead. The
blasting operation has to be carried out by skilled blaster and it has to be so controlled that it doesn't disturb the
portion of the bed rock that has to support the abutment. The contractor will be allowed to use the useful materials
(if any) from the blasting for the bridge project and therefore the consideration for the same has to be made while
setting the rates. The cost for operation of compressor, drill rod and all other efforts required to complete the task
has to be included in the rate . This quantity is for Right bank only. The rock excavation shall be paid as
solid volume. However, for the rock excavation on the toe side (river side) of the abutments, the excavation shall
be done as per the excavation line shown in the relevant drawings.[2.2]

Excavation-rock using blasting cum 432.00

14. A . 4 Backfilling around and behind the foundations, abutments, return walls and approaches. Handling, loading,
offloading, transportation, watering and all necessary works shall be included in the rate. The back filling shall be
done as per the instruction of site engineer and in layers not more than 300mm thick and compacted well
with earth rammer or compactor. The Client's site engineer will strictly supervise this to make sure that full
compaction is achieved. While the backfilling for the approach roads to the bridge shall be paid as per actual
quantity, the backfilling in and around the abutments and the wingwalls shall be paid as soild volume. [2.3]

Backfilling using excavated earth cum 374.00

14. A . 5 Rock anchoring works on the right bank abutment. The work involves drilling of minimum 32mm diameter drill holes,
placing of the reinforcement (as per design) in the hole and packing it with rich cement motar 1:1. The
reinforcement has to be placed centrally in the hole so that the cement motar fill the gap uniformly around the
reinforcement bar. The depth of the drill holes are shown in the drawing. The reinforement shall be paid seperately.
All other efforts and expenses required for completing the task shall be included in the rates. [4.11]

Rock anchoring works mtr 135.00

14. A . 6 Providing and laying coarse gravel (filter layer) behind the abutment & return walls as per drawing. Thickness
d=50 cm. The filter materials to be used have to be approved by the client. Handling, loading, offloading,
transportation and all necessary work shall be included in the rate. [2.3]

Backfilling with coarse gravel cum 59.00

14. A . 7 Providing and Laying stone soling under the left abutment foundation of thickness 20cm. Rounded stones obtained
from the river bank/bed shall not permitted to be used. If they are at all used, they have to be broken up or crushed
to smaller pieces. The sizes of the stones used for soling shall be smaller than the thickness of soling required and
so graded that they produce a compacted stone soling. No additional payment will be made for the additional
thickness provided.[2.3]

Stone soling- foundation cum 12.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14. A . 8 Providing & laying of lean concrete M10 for Abutment foundations and underneath of approach slab,
20mm agg. including all works, Thickness 10 cm and 8cm as per drawing and specification. The lean concrete area
can be inclined up to 15 degrees and therefore formwork may not be necessary. The rate has to include all works
and materials to fulfil the task including curing. [3.3]

Lean concrete M10 (1:3:6)-fdn cum 14.00

14. A . 9 Providing & laying of lean concrete M10 for drain near approach slab , 20mm agg. including all works. The
formwork will be paid seperately. The rate has to include all works and materials to fulfil the task including curing.
[3.3]

Lean concrete M10 (1:3:6)-drain cum 3.00

The formwork shall include all temporary or permanent forms required for forming the concrete of the shape,
dimensions and surface finish as shown in the relevant drawings including removal of the form work after the time
specified in the specifications or as directed by the Engineer/Client. The formwork shall be of timber, plywoood
(only waterproof marine plywood and not ordinary commercial ply) or steel plates. The standard form
work oil shall be used to prevent the fresh concrete from sticking to the shuttering board. The use of old/used mobil
oil shall not be permitted. [3.6]

14. A .10 Providing and fixing vertical formwork for the foundation slab of the abutments [3.6]
Vertical formwork fdn. Slab sqm 50.00

14. A . 11 Providing and fixing vertical form work for the abutment walls (stem) and return wall including dirt walls.[3.6]

Vertical formwork abutment walls sqm 373.00

14. A . 12 Providing and fixing form work for the Approach slab , seismic arrester block and drain as per approved
drawing and specification. The form work is mostly vertical but may also be inclined and should therefore be
considered for while setting the rate.[3.6]

Formwork for approack slab sqm 43.00

14. A . 13 Providing and fixing of HDPE pipes for weep holes as per relevant drawings, diameter 11cm and length varying
from 0.4m to 1.0m [4.5]
HDPE pipe for weep holes mtr 28.00

For rienforced concrete M25 grade and above, the contractor has to carryout testing of the local materials like
sand, aggregate and cement that it intends to use for the concrete and carryout mix design. This has to be followed
by preparation and testing of the trial mixes. It may be necessary to use concrete admixtures to achieve the desired
strength of the concrete. The particular mix proportion to be used for the concrete of particular grade shall be
approved by the client only after the contractor is able to produce the trial mix results of the proposed mix
proportion.

The contractor shall not be paid for material testing, mix design, preparation and testing of trial mixes and so forth.
The expenses for these efforts have to be included under the relevant items of work. The Grades of concrete
mentioned in the BoQ are as per IS:456 - 2000. The cost for use of concrete admixtures and other necessary
efforts required to achieve the desired concrete strength has to be included in the rates and shall not be paid
seperately. The admixture type, brand etc. has to however be approved by the client.
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14. A . 14 Providing & laying of Reinforced Cement Concrete M25, for foundation slab of the abutments as per
drawings and specification. All works and materials to complete the task including curing of the concrete has to be
included in the rate. Formwork and reinforcement will be paid separately.[3.8]

RCC M25 (1:1:2)-fdn slab cum 72.00

14. A . 15 Providing & laying of Reinforced Cement Concrete M25 for the abutment and return walls, as per drawings
and specification, surfaces vertical and/or inclined. All works and materials to complete the task including curing of
the concrete has to be included in the rate. Formwork and reinforcement will be paid separately [3.8]

RCC M25 (1:1:2)-abutment cum 98.00

14. A . 16 Providing & laying of Reinforced Cement Concrete M25 for the dirt wall, kerb on return wall and approach
slab, as per drawings and specification. All works and materials to complete the task including curing of the
concrete has to be included in the rate. Formwork and reinforcement will be paid separately [3.8]

RCC M25 (1:1:2)-walls, approach slab cum 49.00

14. A . 17 Providing and laying steel reinforcement High Strength Deformed Bars (HYSD) of Grade Fe500 as per IS 1786.
The rate quoted shall include cutting, bending, hooking by machine/manual, tying in position including GI binding
wire, spacers, laps, chairs, cover blocks, placing into formwok and fixation, all complete as per drawings and
specification. Reference will be made to the reinforcement list for calculating the weight of the reinforcement for
which the contractor is eligible for payment. The contractor will not be paid for any wastage. The contractor has to
consider and include wastage into his pricing of the unit rates.

Straight bars Diameter 10 - 25 mm. All efforts and costs to be included to fulfill the task. Abutments, dirt wall,
Approach slab seismic arrester blocks and bearing seat.[3.8]
Reinforcement Fe 500 kgs 141.00

14. A . 18 Bendup bars with hooks and any kind of bends, Diameter 10 - 25 mm. All efforts and costs to be included to fullfil
the task. Abutments, Approach Slab dirt wall, seismic arrester block and bearing seat [3.8]
Reinforcement Fe 500 kgs 18677.00

14. A . 19 Providing and fixing of formwork for kerb, side of deck slab, railings and both ends of the beam near expansion
joints according to relevant drawings - surfaces vertical or inclined and as per specification.[3.6]
Formwork for kerb, deck slab sqm 185.00

14. A . 20 Providing and fixing Formwork for the underside of the bottom slab of the box girder . The rate for this
formwork should include the cost for the design, erection and fixing of the falsework or formwork support including
the temporary foundations. The false work materials and all other accessories/items required to complete the task
in full have to be provided by the contractor. The Contractor has to study the relevant drawings carefully to judge
the kind of false works (staging) that would be required to support the underside formwork for the bottom concrete
slab. [3.6]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
The contractor has to study the flow conditions all year round, river bed slope both transverse and longitudinal,
height from the bed to the underside of the bridge, total weigth the false work system has to carry etc. prior to
setting the rate for this item. The false work has to be safe and strong enough to support the weight of the
formwork, the concrete above and the construction live load when the concrete is being poured. The formwork has
to impact a smooth surface on the resultant concrete. The design of the false work (staging) and the formwork have
to be approved by the Engineer/Client.

Formwork for bottom-girder slab sqm 151.00

14. A . 21 Providing and fixing Formwork for the side wall of the box girder ( inner and outer side), end diaphragm,
underside horizontal formwork for deck slab and including fillet. The rate has to include providing of props
or other falseworks required to support the formwork.[3.6]

Formwork-side walls, girders sqm 362.00

14. A . 22 Providing and fixing Formwork for the underside of the cantilever portion of deck. The rate for this formwork
should include the cost for the design, erection, fixing and material cost of the formwork support. The Contractor
has to study the relevant drawings carefully to judge the kind of false works (staging) that would be required to
support the underside formwork for the cnatilever portion of the deck slab. The false work has to be safe and strong
enough to support the weight of the formwork, the concrete above and the construction live load when the concrete
is being poured. The formwork has to impact a smooth surface on the resultant concrete. The design of the false
work (staging) and the formwork have to be approved by the Engineer/Client. [3.6]

Formwork for underside-deck sqm 111.00

14. A . 23 Providing and laying in-situ M30 grade Cement Concrete, including mixing in mixer machine or batching plant,
transporting, compacting, curing by water and finishing including all leads and lifts etc complete as per drawing,
design and Specifications and as directed by the Engineer/Client. The contractor has to submit the mix design and
trial mix test reports of the mix proportion before the concrete goes into the bridge. The contractor is reminded here
that it is generally not possible to achieve high grade concrete like M30 without use of concrete admixtures.
Therefore, necessary considerations have to be made while setting the rates. The reinforcement and formwork
shall be paid separately. [3.3,3.8]

14. A . 23a Conc. M30-bottom slab-box girder cum 37.00


14. A . 23 b Conc. M30 sides girders cum 37.00

14. A . 24 Providing and laying of Concrete M30 for bridge deck slab, kerbs, railings, bearing seat and seismic
arrester as per specification and drawings. All works and materials to complete the task including complete curing
of the concrete has to be included in the rates. The concrete top surface has to be wooden trovel finished.[3.3,3.8]

Conc. M30 deck slab, kerbs etc cum 100.00

Providing and laying steel reinforcement High Strength Deformed Bars (HYSD) of Grade Fe500 as per IS 1786.
The rate quoted shall include cutting, bending, hooking by machine/manual, tying in position including GI binding
wire, spacers, laps, chairs, cover blocks, placing into formwok and fixation, all complete as per drawings and
specification. Reference will be made to the reinforcement list for calculating the weight of the reinforcement for
which the contractor is eligible for payment. The contractor will not be paid for any wastage. The contractor has to
consider and include wastage into his pricing of the unit rates.[3.8]

14. A . 25 Straight bars Diameter 10 - 32 mm. All efforts and costs to be included to fulfill the task. [3.8]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
Reinforcement Fe500 kgs 15211.00

14. A . 26 Bent-up bars with hooks and any kind of bends, Diameter 10 - 32 mm. All efforts and costs to be included to fullfil
the task. [3.8]
Reinforcement Fe500 kgs 26189.00

14. A . 27 Delivery, placing and laying including fixation of drainage spouts in the bridge slab as per relevant drawings.
Diameter of the drainage spout's pipe 120mm, Grating (cover) in galvanised steel, Size 250/250 mm square, the
grating has to carry a spot load of 100 kN. The drainage spouts has to be constructed in such a way so that the
gratings can be temporarily fixed to protect against theft. All efforts and cost have to be included in the rate to fullfil
the task. Refer to Dwg. No. SK-DS-37 for the details.[4.1]

Drainage spout each 13.00


14.A.28 Providing and fixing in position strip seal / modular type expansion joints as per detailed drawing and approved
specifications including cost of all materials and fixtures, welding, preparing surface for receiving the joints including
all leads and lifts etc. complete as per detailed approved drawing and specification and as directed by
Engineer/Client. The expansion joints shall allow for movement of between 50mm and 70mm [4.11]

Modular expansion joint mtr 17.00

14. A . 29 Providing & laying of Steel Reinforced Elastomeric Bearings pad as per the bearing drawings & specifications.
The rate shall be inclusive of all installation , transportation and providing of test certificate from the manufacture.
(Ref Drawing. SK-BR-17 for detail) size 360*450*98mm [4.9]

Elastomeric bearings each 4.00

14. A . 30 Providing and placing of Neoprene rubber pad of size 1030x950x20mm. The rubber pad is placed between
seismic arrester block and box girder. The rate should include all works necessary to complete the task[4.9]
Neoprene rubber pad each 4.00

14. A . 31 The top of the deck slab and approach slab shall be finished with brush after the intial setting of concrete. The
brush shall be done in the cross direction to provide extra gripping and bondage to the wearing coat.[1.11]
Brush finishing-deck slab sqm 325.00

14. A . 32 Providing and laying dry stone wall in G.I wire mesh 4mm (8 SWG) - double knotted mesh ….100mm, including
supplying and weaving of mesh complete. The gabion wall has to to be built using flat and elongated stones. River
boulders are strictly not permitted to be used. The stones inside the gabion wire mesh have to be built in form of a
dry wall so that the wall is stable on its own even within the wire mesh. [4.7]

Gabion wall using GI wire 8swg cum 257.00

14. A . 33 Providing & laying of wearing coat of 60 mm thick bituminious black topping on the deck slab and approach
road in transverse direction as per design drawing. The blacktopping must be made very accurate. A maximum
tolerance in thickness of only upto 5mm shall be permitted. The black topping must be of high quality, waterproof
and oil resistant.

Bituminious black topping 40mm sqm 325.00

14. A . 34 Providing & Fixing GI Square Hollow Section 4mm thick as per drawings complete
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
GI Square Hollow Section Railing mtr 60.00

River Bank Protection Works


14.A.35 Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10sqm on plan, including dressing
& ramming, disposal of surplus soil within 50m lead & 1.5m lift. [2.2,2.3]
Earthwork in excavation cum 500.00

14.A.36 Construction of gabion wall as per drawings, including excavation of foundations, sides and back filling, delivery of
materials etc. complete. The height of the wall shall be measured from the bottom of the gabion foundation to the
top of the gabion wall. The wire diameter for gabion box shall be: wire netting 2.7mm, selvedge wire 3.4mm, binding
and bracing wire 2.4mm. The hexagonal mesh size shall be 100mmx120mm with minimum 3 twists.[4.7]

Gabion stone wall av. Height 4.0mtr mtr 50.00

14.A.37 Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth, ramming etc, within
lead 50m & lift 1.5m [2.2, 2.3]
Backfilling in foundation cum 350.00

14.A.38 Construction of embankment incl embankment over rockfill/shoulder with an approved material deposited at site
from roadway cutting including lead and lift upto 300 m [600, 800]
Rockfill embankment cum 4000.00

SUB TOTAL FOR BILL NO. 14 (BRIDGE A)


B. SISITHANG KHOLA BRIDGE (10 m Span)
14. B . 1 Providing/ Provision of temporary roads, structures etc required during the construction phase.[1.2]
Provisions for temporary road, struct. LS 1.00

14. B . 2 Maintenance and protection of traffic during the construction period.[1.2]


Traffic protection LS 1.00

14. B . 3 Providing, maintenance and removal of Sign Boards at the construction site.[1.2]
Sign boards LS 1.00

14. B . 4 Providing and maintenance of survey and other engg. Equipments.[1.2]


Engg equipments month 20.00

14. B . 5 Clearing and grubbing including uprooting of vegetations and trees of girth < 300 mm, disposal within 50 m of the
site [2.2, 2.3]
Clearing & grubbing areas incl. disposal sqm 110.00

14.B.6 Earthwork in formation cutting, including uprooting of vegetation and trees, stacking of useful materials for re-use
and disposal of surplus earth within 50m lead and all lift for all types of soil and rock with or without blasting.
Backfilling of the excavated earth and filling materials in the foundations.[2.2]
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14. B . 6 (a) Excavation and Backfill for Structures cum 440.00
14. B . 6(b) Sand Backfill for Structures cum 55.00

14.B. 7 Providing and laying cement concrete of the following class as detailed on the respective drawings [3.3]
14. B . 7(a) Conc. below foundation slab - Class M10 cum 8.00
14. B . 7(b) Conc. in Fdn. Slab/Pile cap - Class M25 cum 34.00

14. B . 8 Providing and laying steel reinforcement High Strength Deformed Bars (HYSD) of Grade Fe500 as per IS 1786.
The rate quoted shall include cutting, bending, tying in position. The contractor will not be paid for any wastage.
[3.8]

Reinforcement steel Fe 500 kgs 5000.00

14.B.9 Providing and laying cement concrete of the following class as detailed on the respective drawings.[3.3]
14. B . 9(a) In Deck Slab - Class M30 cum 51.00
14. B . 9(b) Kerb beam, Rail & Rail Post - Class M20 cum 56.00

14. B . 10 Providing and laying Random Rubble Masonry with hard stone in foundation and plinth in cm 1:5
RRM in cm 1:5 cum 128.00

14. B . 11 Providing and laying steel reinforcement High Strength Deformed Bars (HYSD) of Grade Fe500 as per IS 1786.
The rate quoted shall include cutting, bending, tying in position. The contractor will not be paid for any wastage.
[3.8]

Reinforcement steel Fe 500 kgs 5000.00

14. B . 12 Providing and fixing form work & shuttering for following item of works. The item also includes prodiving and
constructing of any temporary supports etc. [3.6]
14.B.12(a) Bridge Girder, Cross Girder, Deck Slab and all other bridge super-structure element sqm 112.00

14. B .12(b) For Kerb beam, Rail, Rail post and all other bridge furniture sqm 67.00

14. B . 12(c) Foundation Slab/Pile cap and all other bridge Foundation elements sqm 28.00

14. B . 13 Providing and laying of cement concrete class M30 in road wearing surface. The item also includes finishing of the
surface by brush to make it rough. [3.3]
Concrete M30 in wearing surface cum 4.00

14. B . 14 Providing and fixing of drainage pipes/ spout in the bridge structure complete.[4.5]
Drainage spouts each 9.00

14. B . 15 Providing and fixing of Bridge Deck Joint Complete as detailed on the Drawings[4.11]
Bridge deck joint mtr 17.00
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14.B. 16 Providing & Fixing GI Square Hollow Section 4mm thick as per drawings complete
GI Square Hollow Section Railing mtr 20.00

SUB TOTAL FOR BILL NO. 14 (BRIDGE B)


C. NIRKHOLA BRIDGE (14 m Span )
The contractor shall be deemed to have made himself fully acquainted with the full nature & complexity of the work,
the location and character of the site and means of access to the site.
The Contractor confirms also to be fully aware of the soil condition. The rate quoted for the soil excavation shall
apply for all the excavation materials; soil, earth, rock - hard and/or soft, requiring or not requiring blasting.
Thefore, while submitting the rates, the contractor has to estimate the proportion of various materials (soil, ordinary
rock, hard rock) in the excavation depending on the site condition and quote accordingly.

The excavation shall be paid as Solid Volume. Solid volume is the volume of excavation calculated directly
from the foundation dimensions of the structure without allowance for bulking, shrinkage, wastage,
working space, slope cutting etc. But the contractor has to be aware of the fact that the soil cannot be dug
vertically and that additional excavations would be required for getting the working space around the foundations,
slope cutting etc. and the contractor has to account for these additional quantities while setting rates for the
excavation works.

14.C.1 Clearing & grubbing of site including uprooting all vegetation, grass, bush shrubs, saplings and trees of girth up to
300 mm, removal of stumps of trees of girth of all sizes including removing stumps of trees cut earlier and disposal
of unserviceable materials and stacking of serviceable materials as directed by engineer with all leads and lifts etc.
complete [2.2]

Clearing & grubbing sqm 275.00

14.C.2 Excavation of soil and storing the useful materials close to the abutments and foundations. This materials will be
used as backfilling around and behind foundation on both sides. However, the top layer of the soil containing
decomposible materials have to be disposed off to necessary leads. The quantity shall be paid as solid volume and
as a soil excavation irrespective of the nature and type of soil - sand , gravel, boulder or any type of rock requiring
or not requiring blasting[2.2]

Excavation of top soil cum 132.00

14.C.3 Breaking of hard rocks using controlled blasting and disposal of unusable materials within necessary lead. The
blasting operation has to be carried out by skilled blaster and it has to be so controlled that it doesn't disturb the
portion of the bed rock that has to support the abutment. The contractor will be allowed to use the useful materials
(if any) from the blasting for the bridge project and therefore the consideration for the same has to be made while
setting the rates. The cost for operation of compressor, drill rod and all other efforts required to complete the task
has to be included in the rate . This quantity is for Right bank only. The rock excavation shall be paid as
solid volume. However, for the rock excavation on the toe side (river side) of the abutments, the excavation shall
be done as per the excavation line shown in the relevant drawings.[2.2]

Excavation-rock using blasting cum 91.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14.C.4 Backfilling around and behind the foundations, abutments, return walls and approaches. Handling, loading,
offloading, transportation, watering and all necessary works shall be included in the rate. The back filling shall be
done as per the instruction of site engineer and in layers not more than 300mm thick and compacted well
with earth rammer or compactor. The Client's site engineer will strictly supervise this to make sure that full
compaction is achieved. While the backfilling for the approach roads to the bridge shall be paid as per actual
quantity, the backfilling in and around the abutments and the wingwalls shall be paid as soild volume. [2.3]

Backfilling using excavated earth cum 495.00

14.C.5 Rock anchoring works on the right bank abutment. The work involves drilling of minimum 32mm diameter drill holes,
placing of the reinforcement (as per design) in the hole and packing it with rich cement motar 1:1. The
reinforcement has to be placed centrally in the hole so that the cement motar fill the gap uniformly around the
reinforcement bar. The depth of the drill holes are shown in the drawing. The reinforement shall be paid seperately.
All other efforts and expenses required for completing the task shall be included in the rates. [4.11]

Rock anchoring works mtr 95.00

14.C.6 Providing and laying coarse gravel (filter layer) behind the abutment & return walls as per drawing. Thickness
d=50 cm. The filter materials to be used have to be approved by the client. Handling, loading, offloading,
transportation and all necessary work shall be included in the rate. [2.3]

Backfilling with coarse gravel cum 42.00

14.C.7 Providing and Laying stone soling under the left abutment foundation of thickness 20cm. Rounded stones obtained
from the river bank/bed shall not permitted to be used. If they are at all used, they have to be broken up or crushed
to smaller pieces. The sizes of the stones used for soling shall be smaller than the thickness of soling required and
so graded that they produce a compacted stone soling. No additional payment will be made for the additional
thickness provided.[2.3]

Stone soling- foundation cum 9.00

14. C . 8 Providing & laying of lean concrete M10 for Abutment foundations and underneath of approach slab,
20mm agg. including all works, Thickness 10 cm and 8cm as per drawing and specification. The lean concrete area
can be inclined up to 15 degrees and therefore formwork may not be necessary. The rate has to include all works
and materials to fulfil the task including curing. [3.3]

Lean concrete M10 (1:3:6)-fdn cum 4.00

14. C . 9 Providing & laying of lean concrete M10 for drain near approach slab , 20mm agg. including all works. The
formwork will be paid seperately. The rate has to include all works and materials to fulfil the task including curing.
[3.3]

Lean concrete M10 (1:3:6)-drain cum 3.00

The formwork shall include all temporary or permanent forms required for forming the concrete of the shape,
dimensions and surface finish as shown in the relevant drawings including removal of the form work after the time
specified in the specifications or as directed by the Engineer/Client. The formwork shall be of timber, plywoood
(only waterproof marine plywood and not ordinary commercial ply) or steel plates. The standard form
work oil shall be used to prevent the fresh concrete from sticking to the shuttering board. The use of old/used mobil
oil shall not be permitted.
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
14. C . 10 Providing and fixing vertical formwork for the foundation slab of the abutments [3.6]
Vertical formwork fdn. Slab sqm 348.00

14. C . 11 Providing and fixing vertical form work for the abutment walls (stem) and return wall including dirt walls.[3.6]

Vertical formwork abutment walls sqm 273.00

14. C . 12 Providing and fixing form work for the Approach slab , seismic arrester block and drain as per approved
drawing and specification. The form work is mostly vertical but may also be inclined and should therefore be
considered for while setting the rate.[3.6]

Formwork for approack slab sqm 43.00

14. C . 13 Providing and fixing of HDPE pipes for weep holes as per relevant drawings, diameter 11cm and length varying
from 0.4m to 1.0m [4.5]
HDPE pipe for weep holes mtr 28.00

For rienforced concrete M25 grade and above, the contractor has to carryout testing of the local materials like
sand, aggregate and cement that it intends to use for the concrete and carryout mix design. This has to be followed
by preparation and testing of the trial mixes. It may be necessary to use concrete admixtures to achieve the desired
strength of the concrete. The particular mix proportion to be used for the concrete of particular grade shall be
approved by the client only after the contractor is able to produce the trial mix results of the proposed mix
proportion.

The contractor shall not be paid for material testing, mix design, preparation and testing of trial mixes and so forth.
The expenses for these efforts have to be included under the relevant items of work. The Grades of concrete
mentioned in the BoQ are as per IS:456 - 2000. The cost for use of concrete admixtures and other necessary
efforts required to achieve the desired concrete strength has to be included in the rates and shall not be paid
seperately. The admixture type, brand etc. has to however be approved by the client.

14. C . 14 Providing & laying of Reinforced Cement Concrete M25, for foundation slab of the abutments as per
drawings and specification. All works and materials to complete the task including curing of the concrete has to be
included in the rate. Formwork and reinforcement will be paid separately.[3.8]

RCC M25 (1:1:2)-fdn slab cum 36.00

14. C . 15 Providing & laying of Reinforced Cement Concrete M25 for the abutment and return walls, as per drawings
and specification, surfaces vertical and/or inclined. All works and materials to complete the task including curing of
the concrete has to be included in the rate. Formwork and reinforcement will be paid separately

RCC M25 (1:1:2)-abutment cum 9.00

14. C . 16 Providing & laying of Reinforced Cement Concrete M25 for the dirt wall, kerb on return wall and approach
slab, as per drawings and specification. All works and materials to complete the task including curing of the
concrete has to be included in the rate. Formwork and reinforcement will be paid separately [3.8]

RCC M25 (1:1:2)-walls, approach slab cum 17.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
Providing and laying steel reinforcement High Strength Deformed Bars (HYSD) of Grade Fe500 as per IS 1786.
The rate quoted shall include cutting, bending, hooking by machine/manual, tying in position including GI binding
wire, spacers, laps, chairs, cover blocks, placing into formwok and fixation, all complete as per drawings and
specification. Reference will be made to the reinforcement list for calculating the weight of the reinforcement for
which the contractor is eligible for payment. The contractor will not be paid for any wastage. The contractor has to
consider and include wastage into his pricing of the unit rates.

14. C . 17 Straight bars Diameter 10 - 25 mm. All efforts and costs to be included to fulfill the task. Abutments, dirt wall,
Approach slab seismic arrester blocks and bearing seat.[3.8]
Reinforcement Fe 500 kgs 141.00

14. C . 18 Bent up bars with hooks and any kind of bends, Diameter 10 - 25 mm. All efforts and costs to be included to fullfil
the task. Abutments, Approach Slab dirt wall, seismic arrester block and bearing seat [3.8]
Reinforcement Fe 500 kg 13640.00

14.C.19 Providing and fixing of formwork for kerb, side of deck slab, railings and both ends of the beam near expansion
joints according to relevant drawings - surfaces vertical or inclined and as per specification.[3.6]
14. C . 19(a) Formwork for kerb, deck slab sqm 92.00

14. C .19(b) Formwork for bottom-girder slab sqm 76.00

14. C . 19(c) Formwork-side walls, girders sqm 362.00

14. C . 19(d) Formwork for underside-deck sqm 22.00

14. C . 20 Providing and laying in-situ M30 grade Cement Concrete, including mixing in mixer machine or batching plant,
transporting, compacting, curing by water and finishing including all leads and lifts etc complete as per drawing,
design and Specifications and as directed by the Engineer/Client. The contractor has to submit the mix design and
trial mix test reports of the mix proportion before the concrete goes into the bridge. The contractor is reminded here
that it is generally not possible to achieve high grade concrete like M30 without use of concrete admixtures.
Therefore, necessary considerations have to be made while setting the rates. The reinforcement and formwork
shall be paid separately. [3.8]

Conc. M30-Main & Cross girder cum 26.00

14. C . 21 Providing and laying of Concrete M30 for bridge deck slab, kerbs, railings, bearing seat and seismic
arrester as per specification and drawings. All works and materials to complete the task including complete curing
of the concrete has to be included in the rates. The concrete top surface has to be wooden trovel finished.[3.8]

Conc. M30 deck slab, kerbs etc cum 49.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
Providing and laying steel reinforcement High Strength Deformed Bars (HYSD) of Grade Fe500 as per IS 1786.
The rate quoted shall include cutting, bending, hooking by machine/manual, tying in position including GI binding
wire, spacers, laps, chairs, cover blocks, placing into formwok and fixation, all complete as per drawings and
specification. Reference will be made to the reinforcement list for calculating the weight of the reinforcement for
which the contractor is eligible for payment. The contractor will not be paid for any wastage. The contractor has to
consider and include wastage into his pricing of the unit rates.[3.8]

14. C . 22 Straight bars Diameter 10 - 32 mm. All efforts and costs to be included to fulfill the task. [3.8]
Reinforcement Fe500 kgs 6270.00

14. C . 23 Bent-up bars with hooks and any kind of bends, Diameter 10 - 32 mm. All efforts and costs to be included to fullfil
the task. [3.8]
Reinforcement Fe500 kgs 3960.00

14. C . 24 Delivery, placing and laying including fixation of drainage spouts in the bridge slab as per relevant drawings.
Diameter of the drainage spout's pipe 120mm, Grating (cover) in galvanised steel, Size 250/250 mm square, the
grating has to carry a spot load of 100 kN. The drainage spouts has to be constructed in such a way so that the
gratings can be temporarily fixed to protect against theft. All efforts and cost have to be included in the rate to fullfil
the task. Refer to Dwg. No. SK-DS-37 for the details.[4.1]

Drainage spout each 15.00

14. C . 25 Providing and fixing in position strip seal / modular type expansion joints as per detailed drawing and approved
specifications including cost of all materials and fixtures, welding, preparing surface for receiving the joints including
all leads and lifts etc. complete as per detailed approved drawing and specification and as directed by
Engineer/Client. The expansion joints shall allow for movement of between 50mm and 70mm [4.11]

Modular expansion joint mtr 17.00

14. C . 26 Providing & laying of Steel Reinforced Elastomeric Bearings pad as per the bearing drawings & specifications.
The rate shall be inclusive of all installation , transportation and providing of test certificate from the manufacture.
size 360*450*98mm [4.9]

Elastomeric bearings each 8.00

14. C . 27 Providing and placing of Neoprene rubber pad . The rubber pad is placed between seismic arrester block and
box girder. The rate should include all works necessary to complete the task [4.9]
Neoprene rubber pad each 4.00

14. C . 28 The top of the deck slab and approach slab shall be finished with brush after the intial setting of concrete. The
brush shall be done in the cross direction to provide extra gripping and bondage to the wearing coat. [4.11]
Brush finishing-deck slab sqm 211.00

14. C . 29 Providing & laying of wearing coat of 60 mm thick bituminious black topping on the deck slab and approach
road in transverse direction as per design drawing. The blacktopping must be made very accurate. A maximum
tolerance in thickness of only upto 5mm shall be permitted. The black topping must be of high quality, waterproof
and oil resistant.

Bituminious black topping 60mm sqm 211.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words

14.C. 30 Providing & Fixing GI Square Hollow Section 4mm thick as per drawings complete
GI Square Hollow Section Railing mtr 28.00

SUB TOTAL FOR BILL NO. 14 (BRIDGE C)

TOTAL FOR BILL NO. 14 (BRODGE A+B+C)

BILL NO. 15: OPERATION AND MAINTENANCE


15.0 A. ROUTINE MAINTENANCE
15.A.1 Clearing of Carriageway, side drains, culvert walls, bridges and catch pits md 7200.00

15.A.2 Clearing vegetation/jungle from drains, road shoulder and road corridor md 3600.00

15.A.3 Surface dressing of road shoulder md 1800.00

15.A.4 White washing of structures md 900.00

15.A.5 Pothole patch repair md 1800.00

15.A.6 Pavement crack repair md 1200.00

15.A.7 Pavement marking renewal md 2400.00

15.A.8 Road surface clearing and sweeping md 2400.00

15.A.9 Cleaning of structures md 600.00

15.A.10 Road signs and distance marker maintenance md 1200.00

15.A.11 Bioengineering md 900.00

Bridge maintenance complete (apply grease and paint, foundation repair, parapet & footpath repair, river protection
15.A.12 md 1350.00
works etc.)

SUB TOTAL FOR BILL NO. 15. A


15 B. EMERGENCY MAINTENANCE (PROVISIONAL)
15.B.1 Clear landslides (slip clearance)

15.B.1(a) Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 m² on plan, including disposal of
m3 8000.00
excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary Soil
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
15.B.1(b) Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 m² on plan, including disposal of
excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Ordinary rock with or without m3 4500.00
blasting

15.B.2 Slope protection works due to major slide (SH: R/wall & B/wall construction)
15.B.2 (a) Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 m² on plan, and depth > 300
m3 600.00
mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary Soil

15.B.2 (b) Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 m² on plan, and depth > 300
mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift - Ordinary rock with or m3 200.00
without blasting

15.B.2 (c) Providing and laying Hand packed stone filling or soling with stones m3 250.00

15.B.2 (d) Providing and laying in position plain cement concrete 1:5:10 (1 cement : 5 sand : 10 graded crushed stone 40 mm
m3 20.00
nominal size) excluding the cost of centering and shuttering - All work upto plinth level.

Providing & laying Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:6
15.B.2 (e) m3 550.00

Dry hand packed rubble masonry hammer dressed (facing), with stone-boulder > 0.04 m³
15.B.2 (f) m3 250.00

15.B.2 (g) Providing & laying 20mm cement plaster - C.M 1:4 m2 600.00

15.B.3 Gabion wall construction in running metre


15.B.3 (a) Construction of gabion wall, height up to 1.00 mm with dry stone masonry ( hammer dressed facing) including
delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedge wire 3.4 mm dia, m 80.00
binding/lacing wire 2.40 mm dia complete

15.B.3 (b) Construction of gabion wall, height up to 2.00 mm with dry stone masonry ( hammer dressed facing) including
delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedge wire 3.4 mm dia, m 40.00
binding/lacing wire 2.40 mm dia complete

15.B.3 (c) Construction of gabion wall, height up to 3.00 mm with dry stone masonry ( hammer dressed facing) including
delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedge wire 3.4 mm dia, m 40.00
binding/lacing wire 2.40 mm dia complete

15.B.3 (d) Construction of gabion wall, height up to 4.00 mm with dry stone masonry ( hammer dressed facing) including
delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedge wire 3.4 mm dia, m 40.00
binding/lacing wire 2.40 mm dia complete

15.B.3 (e) Construction of gabion wall, height up to 5.00 mm with dry stone masonry ( hammer dressed facing) including
delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedge wire 3.4 mm dia, m 25.00
binding/lacing wire 2.40 mm dia complete
Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
15.B.3 (f) Construction of gabion wall, height up to 6.00 mm with dry stone masonry ( hammer dressed facing) including
delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedge wire 3.4 mm dia, m 25.00
binding/lacing wire 2.40 mm dia complete

SUB TOTAL FOR BILL NO. 15. B


C. DAY WORKS
15. C.1 Equipment (including driver, fuel & mtc)

15.C.1 (a) Road Patrol vehicle 4 wheel drive months 36.00

15.C.1(b) Mtc mobile unit hr 1500.00

15.C.1 (c) Loader (1/2 m3) hr 1200.00

15.C.1(d) Backhoe hr 1200.00

15.C.1 (e) Excavator hr 1500.00

15.C.1(f) Tripper truck (8tonne) hr 900.00

15.C.1 (g) Motor grader (min 120hp) hr 750.00

15.C.1(h) Static drum roller (8-10tonne) hr 900.00

15.C.1 (i) Vibrating drum roller (10tonne) hr 1050.00

15.C.1(j) Rubber Tyred roller (15tonne) hr 1050.00

15.C.1 (k) Trailer (20MT capacity or higher) hr 750.00

15.C.1(l) Tractor with trailer (50HP or higher) hr 750.00

15.C.1 (m) Power chain hr 300.00

15.C.1(n) Air compressor with jack hammers hr 600.00

15.C.1 (o) Concrete mixer (5-7cft) hr 900.00

15. C.2 Manpower

15. C.2 (a) Foreman/Supervisor day 180.00


Item No. Description Unit Quantity Rate (BTN) Amount (BTN)
In figures In words
15. C.2 (b) Plant Operator Grade 1 day 180.00

15. C.2 (c) Plant Operator Grade 2 day 180.00

15. C.2 (d) Mason Grade 1 day 300.00

15. C.2 (e) Mason Grade 2 day 300.00

15. C.2 (f) Labour day 900.00

SUB TOTAL FOR BILL NO. 15. C


TOTAL FOR BILL NO. 15 (A+B+C)

BILL NO.16: PROVISIONAL ITEMS


16.1 Construct road side amenities for resting passengers Nos 2.00 1000000
16.2 Landslide clearance greater than 20 cum per instance. Cum 15000.00 900000
GRAND TOTAL FOR SECTION B (BTN)

You might also like