Existing Process System of Heera

The document describes the existing process system at Heera, including: - Crude oil from offshore wellhead platforms enters the system at pressures between 7-82 bar. - The crude oil goes through separation and dehydration units before oil is exported and gas is sent to uplift or internal consumers. - Supporting units include a gas dehydration system using glycol, a glycol regeneration system, a demulsifier system, and a water injection and swage treatment facility.

Uploaded by

AAADSFDVSDV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Existing Process System of Heera

The document describes the existing process system at Heera, including: - Crude oil from offshore wellhead platforms enters the system at pressures between 7-82 bar. - The crude oil goes through separation and dehydration units before oil is exported and gas is sent to uplift or internal consumers. - Supporting units include a gas dehydration system using glycol, a glycol regeneration system, a demulsifier system, and a water injection and swage treatment facility.

Uploaded by

AAADSFDVSDV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Existing process system of Heera ASSOCIATED +

Manifold Receiving BANDRA GAS,


Crude Oil from MMSMD=
MMSMD=3.8 Pr.=82 Gas Dehydration UNIT Lbs/mmscf.=5.0
(0.6+0.4)= 1.0
Wellhead Platforms MMSCMD=0.68 Pr.=7 Gas to URAN
Pr.=55

HRA HP Sep
Gas to Lift
BANDRA
05 PGCs FLARE GAS FROM MMSMD=2.8
Pr=7.1 HX & HY
Pr.=81
Te=48

LP-sep MMSCMD=0.019 Gas to Internal consumers (FG +


etc)
MMSMD=0.280
Pr=4.5
BOPD=12684 Pr.=81
BWPD=12737 Te=59
w/c=4
Oil ppm=500
Production manifold

BOPD=45300
HRG HP Sep-A/B MMSCMD=2.5
BWPD=7284 w/c=2.4

Oil ppm=350
Pr=7.3
Te=49
Pr=4.2
Te=59
BOPD=24783
BWPD=25606
w/c=6
Oil ppm=400
BWPD=2589
HRC HP Sep MMSCMD=0.6
Oil ppm=400 BOPD=45300
w/c=1.8
Pr=7.5 Pr.=20ksc
Te=52 Oil to Uran

BWPD=14190 BOPD=7820

Oil ppm=600 w/c=6

Figure 01 A: Simplified Process System with parameters of a Typical Offshore Process Platform

316
Figure 02: Gas Dehydration System at Heera Process Complex

Figure 03: Glycol Regeneration System at Heera Process Complex


317
Heera
Production
Manifold

Figure 04: Demulsifier System at Heera Process Complex

Figure 05: Gas Flow Diagram at Heera Process Complex

318
Figure 06: Water Injection Facility Flow Diagram at Heera Process Complex

Figure 07: Swage Treatment Flow Diagram at Heera Process Complex