Construction Method
1. Preliminaries (Initial site works) ‐ % of total cost
2. Site clearance and earthwork
3. Foundation construction (E.g. Piling and footing)
4
4. Work below lowest floor finish
Work below lowest floor finish
5. Frame
6. Staircase
7. Upper Floor
8. Roof
9. Wall and partition
10. Door and window
11. Finishes
12. Sundries (Built‐in furniture)
13. Building services (M&E, ICT etc)
14. External works (Water reticulation, landscape etc)
17.50
14.00
‐‐‐‐‐‐‐‐‐‐
245.00 245 m2
‐‐‐‐‐‐‐‐‐‐
2) Foundation
2 2) Excavation for pile cap
2.2) Excavation for pile cap Size of pile cap
Size of pile cap = 700 x 700
= 700 x 700
Depth of excavation:
6/0.70 1100 + 50 (lean concrete) = 1150
0.70
1.15
‐‐‐‐‐‐‐‐‐‐
3.38 3.38 m3
‐‐‐‐‐‐‐‐‐‐
Concrete for pile cap
p p
Formwork for pile cap
Pile Cap = 80‐100kg/m3
b
0.88m3 x 100kg/m3 = 88kg
Column stump = 300‐350kg/m3 a
0.11m3 x 350kg/m3 = 38.50kg
lap
2/12.50
0 15
0.15
0.50 1.88
3.91m3 Excavation for ground beam
g
2/12.50
0 15
0.15
3.75
7.80m2
RC for ground beam
2/12.50
0 15
0.15
0.45 1.69
3.51m3
RC for ground beam
2/2/12.50
0.45
22 50
22.50
55.31m2
Installation of reinforcement bar and
formwork for ground beam
Ground beam = 250‐350kg/m3
3.51m3 x 250kg/m3 = 877.50kg
3) WBLFF
14.90
11 40
11.40 BRC A6
150mm thick
150mm thick
concrete slab
0.30
‐‐‐‐‐‐‐‐‐‐
50.96m3
‐‐‐‐‐‐‐‐‐‐ 50mm thick
sand
d
100mm thick
hardcore
DPM
Length = 9500+3000+1200(apron)+1200(apron) = 14900
Width= 4500+4500+200+1200= 11400
Installation of
Installation
Installation of formwork,Damp
of formwork,Damp
formwork Damp Proof Membrane
Proof Membrane
(DPM) and BRC wire mesh for ground slab
14.90
11.40 50mm thick
sand
0.15
100mm thick
‐‐‐‐‐‐‐‐‐‐ hardcore
25.48m3
DPM
‐‐‐‐‐‐‐‐‐‐
Length = 9500+3000+1200(apron)+1200(apron) =
14900
Width= 4500+4500+200+1200= 11400
0.15 4.47
50mm thick
2/11.40 sand
7.89m3 DPM
‐‐‐‐‐‐‐‐‐‐ 100mm thick
hardcore
DPM
9.00
‐‐‐‐‐‐‐‐‐‐
50mm thick
112.50m2 sand
‐‐‐‐‐‐‐‐‐‐ 100mm thick
hardcore
DPM
3) WBLFF
3.3) Ground slab Area of slab = length x width
3.3.6) 50mm sand bedding for ground
slab
150mm thick
BRC A6
169.86m2 concrete slab
0.05
8 49 3
8.49m3
50mm thick
sand
100mm thick
hardcore
DPM
11.40
0.10
50mm thick
‐‐‐‐‐‐‐‐‐‐ sand
16.99m3 100mm thick
hardcore
‐‐‐‐‐‐‐‐‐‐
DPM
2/11.40
50mm thick
‐‐‐‐‐‐‐‐‐‐ sand
52.60m 100mm thick
hardcore
‐‐‐‐‐‐‐‐‐‐
DPM
Installation
Installation of reinforcement bar and
of reinforcement bar and
formwork for column
Column= 300‐400kg/m3
g of wall
Height
0.49m3 x 300kg/m3 = 147.00kg
2/12.50
0 15
0.15
0.40 1.50
3.12m3
49.40m2
= 400+150+400
= 950
Roof beam = 320‐380kg/m3
3.12m3 x 320kg/m3 = 998.40kg
3938
b
5.1) Steel roof trusses and corrugated
aluminum steel roof covering Area of roof L1= 14900
= (L1 x b x 2 x ½)+
2/½ /14.90 (L2 x a x 2 x ½)
6.93 Side elevation
103.26
a = (14.90/2)2 + 3.942 b
2/½ /11.40 a
8.43 a = 8.43
L2=11400
96 10
96.10
Front and Back
199.36 atau 200m2 b = (11.40/2)2 + 3.942 elevation
b 6 93
b = 6.93
2/ 9.00
2/ 9 00
3.60 64.80
2/ 9.50
3.60 68.40 133.20
Less opening (e.g. door and window)
2/2.20
0 90
0.90 3.96 (door)
3 96 (door)
2/2.40 Brickwall
0.60 2.88 (window)
126.36m2
8) FINISHES
8) FINISHES
8.1) External Plastering and painting
126.36 m2
8.2) Internal Plastering and painting
126.36 m2
8.3) Floor Finishes – cement render
169.86 m2
Brickwall
8.4) Ceiling
8 4) Ceiling – gypsum plasterboard
gypsum plasterboard
169.86 m2
9) SUNDRIES Assumption
Assumption.
9.1) Built‐in counter size 1800mm x 900mm 1 no of counter for frontdesk.
x 725mm(h).
1