Certificate: Government Polytechnic Ambad

The aim of the project is to plan and design a residential building by following the necessary rules and regulations regarding planning, design and construction of buildings. This will include designing the building plan, structural elements like beams, columns, slabs, footings etc. as per the local building bye-laws to ensure a safe and economical building.

Uploaded by

Shyam Bhumkar
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

Certificate: Government Polytechnic Ambad

The aim of the project is to plan and design a residential building by following the necessary rules and regulations regarding planning, design and construction of buildings. This will include designing the building plan, structural elements like beams, columns, slabs, footings etc. as per the local building bye-laws to ensure a safe and economical building.

Uploaded by

Shyam Bhumkar
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 18

CERTIFICATE

GOVERNMENT POLYTECHNIC AMBAD


DEPAI{TMENT OF CIVIL EN(;INEEIUN(;

(CAD)

e,u,lph~
This is certify that Mr. _ ~
~<'.~"
_ ~~{'_
K( \A._\.·e
:~!tth..~ the
Micro-project entitled "SUBMISSION PLAN OF 1 BilK IU~SlDENTIAL BUILDING
OF PLANT AREA (7.46M) (14S0M) being submitted herewith for the award or DIPLOMA IN
ENGINEERING & TECHNOLOGY in CIVIL ENGINEERING or MAIIARASIITRA
STATE BOARD & TECHNICAL EDUCATION (MSBTlq is the result of Micro-project
work completed under my supervision find guidance.

~'~~~M

(PROF Mrs .•J.S.SIRSAT. MADAM)


Place: Ambad
MICRO PROJECT GUIDANCI!
Date:k'~/JQ/2018

Scanned by CamScanner
["J
r
,- DECLARATION
-
- We. the undesired. hereby declare that the project entitsl
RESIDENTIAL BUILDING OF PLANT AREA (7.46M)
SUBMISSION PLAN
(1450M)"beings
OF 1 BHK
written and submitted
by us to Government Polytechnic Ambad during Year 2018·19, THIRD Semester for partial fulfillment of the

I" 'Micro Project' requirement of CONCRETE TECHNOLOGY." subject under Maharashtra State Board of
Technical E.ducation. Mumbai curriculum, under the guidance of PROF Mrs.J.SIRSAT MADAM.

I" The empirical findings in this project are based on the data collected in this project is
I" not copied from any other sources.
!~
I~ ROLL

r-
NO NAME OF STUDENTS SIGNATURE

261
~
I---~
I
I--~
[3 i~ 1. SURYAWANSHI
SUBHAM SHANKAR
\~ [--J
f-~
245 2. MHASKE ANIL
BHAGWAN
I~
-3 254 3. MULE RUSHIKESH
j ~ NARAYAN

L
J
.
~
:
L~
.I_,
L...
,
. --l~ .
~\ ~
~

II
~

L:~~~~~~~~~~~~~~~~~~
I.~.[
l
~

~!'!!!!!!!!!!!!!!'!!!!!!!!!!!!!!!!!,!!!!!!!!!!~~~~!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!'!!!!!!!!!!!!!!!!!!!!!!!!!~

II ~
f'I ACKNOWLEDGEMENTS
I'~
11'" I have great pleasure to express my immense gratitude towards a dynamic person and

11'" my project
ENGINEERING,
guide Prof Mrs.J.S.SIRSAT MADAM. Department
Government Polytechnic, Ambad for giving me an opportunity
of CIVIL
to work on
11 '
an interesting topic over one semester. The work presented here could not have been
11 ~
I~ accomplished without his most competent and inspiring guidance, incessant encouragement,

I~ constructive criticism and constant motivation during all phases of our group Micro-project

I:
work. I am greatly indebted to him.

I I am very much thankful to Prof. A. R. BAIS , Head Of Department is MORE SIR.


'..:;.
Civil Engineering all HODs of various departments and Prof. Dr. JINTURKAR SIR
,Principal, Government Polytechnic, Ambad, for his encouragement and providing me a

I" motivating environment and project facilities in the Institute to carry out experiments and

f" complete this Micro-project work.

I would like to extend our thanks to all our professors, staff members and all
'I ~ our friends who extended their co-operation to complete the project.
3
1
-~ I am indeed indebted to my parents and other family members for their

1- 3 immense help at all levels with moral, social & financial support, care and support

L, throughout my studies without which my work would not have seen light of the day.

I_~ With warm regards,

1_., Yours Sincerely,

I , Place: Ambad M r./ Ms. ----------------------------- _


Date:. I. 1

~
ABSTRACT

Hydembad is the fifth largest city in OUr country. As it is rapidly developing the
. construction in the city is very costly. Economic point of view if the building is
constructed at a far distance from the city it will be cheaper and residents can live
peaceful without any external polluted sources. Having a peaceful surroundings s
the main point of view of most of the people in today's lifestyle.

I,:,,:,

I
~

, I
,
)

,
,
.,
.,
~

J
""l
. . ., ...
3

~
J)
~
.
~ I
_.
I
. ,,"
~)')J
~I "
J'"
J'"
J ", STUDY AREA:

~J "
'rI, Our proposed site is located at Vijaya buildings, Bandalguda, NagoJe road,
Hyderabad.

~" The main road which is near to.site leads to kamineni hospital. A branch road of
10m which is near is existing \\1bm road connected very near to the plot. The total

J.\ " ~
area of the site is about 235.llsq m. the residential building consists of two bed
room.

I ~
J ~
J~
'/
.,
~, ~

,_ .,
J~
)-~
)_,
,I~
r '
.1 ~
,I J
, J
,I
~
'/ 'l
,
~ .., 4

..,
, 'J
CONTENTS

l '-,
['" 1. AIM OF THE PROJECT
l ,'t
THEORY
r ~

I ~
2. INTRODUCTION

I" ~
3. DEMAND OF HOUSES
4. CLASSIFICATION OF BUILDING BASED ON OCCUPANCY
5. SELECTION OF PLOT AND STUDY

L:
I
6. SURVEY OF SITE FOR PROPOSED BUILDING
7. RESIDENTIAL BUILDINGS
a) LIMITATIONS OF BUILT UP AREA
1_3 b) MINIMUM FLOOR AREA AND HEIGHT OF ROOMS

L· 8. BUILDING BYE LAWS AND REGULATIONS


9. ARRANGEMENT OF ROOMS

I DESINGS
J 10. DESING OF SLAB

l 11. DESING OF BEAM


a) FRAME ANAL YSIS
I~ 12. DESING OF COLUMN
13. DESING OF FOOTING
1-..,
I~ DRAWINGS

I_
I4.PLAN
IS.BEAM
I6.FOOTING
l~ 17.PHOTOS
.
\

CONCLUSION

5
..
I'
1
,
J

1
.,
,
,
I
I u
I r
J e 6

II
'" o
f

3 a
~ '-,
AIM r
~ PROJECT
e
s
~
i
~ d
e
-
oject is to
-- p
l
n
t
- a i
~ a
n
l
~
a
. n
b
u
d
~ i
l
~ d
d
e
i
~ s
n
- i
g
g
.
n

t
h
e

f
r
a
m
e
d

s
t
r
u
c
t
INTRODUCTION

7
2.INTRODUCTION

The basics needs of human existences are food, clothing's & shelter. From times immemorial
man has been making efforts in improving their standard of living. The point of his efforts has
been to provide an economic and efficient shelter. The possession of shelter besides being a
basic, used, gives a feeling of security, responsibility and shown the social status of man.

Every human being has an inherent liking for a peaceful environment needed for his
pleasant living, this object is achieved by having a place of living situated at the safe and
convenient location, such a place for comfortable and pleasant living requires considered and
kept in view.

A Peaceful environment.

Safety from all natural source & climate conditions

General facilities for community of his residential area.

The engineer has to keep in mind the municipal conditions, building bye laws,
environment, financial capacity, water supply, sewage arrangement, provision of future, aeration,
ventilation etc., in suggestion a particular type of plan to any client.

"
3. DEMAND OF HOUSES

The house is the first unit of the society and it is the primary unit of human habitation. The
house is built to grant the protection against wind, weathers, and to give insurance against
physical insecurity of all kinds.
~ The special features of the demand for housing consists of in its unique nature and depend on the
following factors.
~

\) Availability of cheap finance.

~ Availability of skilled labours.


.:
~
Availability of transport facility.
~
Cost of labours & material of construction.
3
Predictions of future demand.
~
Rate of interest on investment e. g., low rates of interest with facilities of long term
~
payment may facilities investment in housing.
3
Rate of population growth and urbanization.
~
Supply of developed plots at reasonable prices.
3
Taxation policy on real estates
~
Town planning & environmental conditions.
~

.AI9
. .-,
~

?
~ (,

? 9

You might also like