Design Deliverable Schedule, 30-60-90-100%
Record of Revision
Rev Date Description POC RM
Page 1 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
project shall obtain concurrence from the ES-PE Group Leader. N/A (preferred) or delete rows not
applicable to given project.
10. The ESM contains additional detail on these deliverables as well as additional required deliverables.
Project-specific documents such as SOWs, performance criteria, RCD’s, and other design criteria
documents may also contain deliverable requirements not contained here.
11. Spec maturity at 30%: Where applicable LANL Master Specs (or generic masters) exist and will be used,
submitting them unedited is acceptable at 30% as it communicates LANL Standards understanding, material
choices (e.g., roofing type), fire loading, energy efficiency, etc. Where applicable LANL Master Specs do not
exist, outline or draft specs must be submitted. Outline specs are typically a one page synopsis that
communicate preliminary intentions on important material (and occasionally method) choices. A thorough
preliminary project description (defined by CSI, follows UniFormat) that fulfills these same functions is
acceptable.
12. Spec maturity at 60%: Specs shall portray complete scope of work, non-applicable sections removed.
Unedited masters are unacceptable.
13. Calcs, etc: PE sealing by licensed NM-registered engineer except where noted in Section Z10.
Page 2 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 3 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 4 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 5 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 6 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 7 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 8 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Page 9 of 10
LANL Engineering Standards Manual STD-342-100 Chapter 1-General
Chapter 1 – General MANDATORY DOCUMENT
Section Z10 – Attachment C Deliverable Schedule 30-60-90-100% Rev. 5 5/16/13
Endnotes
Guidance on expectations for design and other project documentation deliverables not addressed in ESM is available
in DOE G 413.3-12, U.S. Department of Energy Project Definition Rating Index Guide and the maturity matrices at
the end of AACE 56R-08: Cost Estimate Classification System - As Applied for the Building and General Construction
Industries (Rev. Dec. 5, 2012)