Experimental Analysis of Various Communication Technologies in AMI Systems PDF
Experimental Analysis of Various Communication Technologies in AMI Systems PDF
Abstract—The low-voltage (110V and 220V) AMI (Advance plan energy management, and achieve the purpose of energy
Metering Infrastructure) test site of various building (four types) and saving and carbon reduction[1].
floors (B2-4F, 8F and 18F) in CHTTL (Telecommunication
Laborateries, Chunghwa Telecom) have been established. The effects AMI network includes Wide Area Network (WAN) and
of various communication technologies (RF( Radio Frequency ) Local Area Network (LAN). LAN usually use PLC(Power
Wireless, PLC(Powerline Communication) and Cellular) on the Line Communication) and RF (Radio Frequency) technologies
communication performance in CHTTL test site were investigated. to transmit meter data. The PLC communication technology
The results indicated that the HES(Head-end server) successfully has been studied by several investigators. The communication
obtained the meters data through various communication modules performance of the DCU(Data Concentrator Unit) connected
(RF, PLC and Cellular) on different building types and floors, with 14 PLC communication modules was examined
especially the basement of stairs and power distribution room. experimentally by Kim et al. [2]. The results showed average
However, the results also revealed that various external factors such operating rate of DCU is 99.3 percent and average operating
as the power line distance, the surrounding wireless signal and the rate of modules is 98.5 percent. González-Sotres et al.
integration of meter and communication module play a significant established a PLC communication model to study the
effect on communication performance and must be considered. These communication performance in the scenarios with 108 or 144
test results provided an efficient way to characterize the users [3]. Numerical simulation results predicted the time of
communication performance for AMI; the results will benefit the
received data to read all nodes has been always lower than 5
future construction of AMI for Taiwan and other countries.
minutes. A NB-PLC(Narrowband PLC) which performed over
Keywords—AMI; communication technologie; communication a week on an extremely power noisy test site simulated the
performance worst case scenario and was conducted experimentally by
Mishra et al. [4]. The results showed data loss rate is less than
1%. Sheikh et al. [5] developed a test site to verify
I. INTRODUCTION communication performance of NB-PLC(Narrow Band-PLC).
In the global climate change, many countries promote The results indicated that the places for high connection
various policies for smart grid. AMI (Advance Metering density, noise inducing loads, residential consumers and
Infrastructure) is the infrastructure for the development of special distribution network have a lower communication
smart grid. AMI is an information system for collecting, performance for NB-PLC. There have appeared a number of
storing and analyzing power data. AMI consists of three parts, RF communication technologies in the published literature. A
namely, smart meter, communication system and model of the RF communication to explore the communication
MDMS(Meter Database Management System). MDMS performance in a typical rural area with an extension of
receives power data from smart meter by communication 240km2 was developed by Malandra et al.[6]. The results
system to analyze and manage data, and further integrate with showed the data (1 collector, 114 routers and 3300 smart
other application systems. meters) can be received within 342.52(s) as soon as possible.
Mafra et al.[7] developed a hybrid communication module
AMI also can apply to home energy management. AMI which can work as well as a bridge between RF and PLC
can help to reduce the cost and manpower for manual meter communication technologies. They found optimal the
reading, and provide power information for users or utilities to transmission rates and data payload to prevent network traffic
jam.
Room
signal be sheltered. Therefore, each building placed a DCU to
Door
Steel box
R15
Parking area
Exit 1F
avoid the signal being covered, it is found that the HES could
Steel box
R16
receive all the meter’s data (including real-time and historical
R1 Stair B2 Exit data) successfully(except for R12). The results also shows that
the alarm messages, power off messages, signal interference,
(c) Building B(B1F-5F) (d) Building C(B2F-18F) and RF mesh test could be received successfully. Finally, we
installed 14 communication modules C in R1 to R18 area. The
results had shown that both real-time and historical data could
be collected by single DCU, and LoRa masking effect didn’t
happened. It is because that the module communication
transmission power was 500mW. Besides that, we found that
the signal which integrated module B and meter of brand X
couldn’t transport to faraway distance (1F~18F), but the signal
Fig. 4. Schematic diagram of RF communication modules position integrated with the meter of brand Y would not have this
phenomenon. It probably caused by the meter and
(a) Building A (b) Staff dorm communication module integration model. The defect of
integration model led to lack of power supply, which
influenced the maximum transmission power. And the tests of
alarm message and power cut message, RF mesh test were
passed successfully. In term of reading data speed, module B
was the fastest among all modules. It probably both module B
and module C were the same brand products, which let HES
read the data from meter quickly.
In term of PLC communication technology, both module D
and E were used PLC communication technology. Module D
used broadband PLC and Module E used narrowband PLC. We
installed 14 modules D in P1 to P14 area, and the results were
shown as Table II. The results shown that the both real-time
data and historical data could be successfully received by HES,
other such as tests of alarm message and power off message,
mesh test could also be received successfully. Next, we
installed 14 modules E in P1 to P14 area. The results shown
that the data from building A(P1~P6) couldn’t be received. So
we tried to move the DCU(building A) to other places. When
the DCU installed in P2 area, the data of P1~P6 could be
Fig. 6. Potograph of the spectrum analysis
received successfully. This is due to the length different
between S-phase and earth wire for The original preset device
placement, which led to unsynchronized phenomenon during V. CONCLUSIONS
communication. Besides that, although module E used NB
In this paper, the effects of various communication
PLC and there were lot of appliances in the dormitory. It worth
technologies (RF, PLC and Cellular) on the communication
to mention that both the real-time data and historical data could
performance in the low voltage AMI test site of CHTTL in
be received successfully. It probably that there were no air
Taiwan have been investigated experimentally. According to
conditioning and dehumidifiers in this area, so the commission
the present measurements, the following conclusions can be
signal wasn’t be influenced. In term of reading data speed,
drawn.
module D was faster than module E. Because the fastest
transmission speed of module E was 240 Mbps. • HES successfully obtained the meter data through
In term of Cellular communication technology(NB-IoT), various communication modules(RF, PLC and Cellular)
module F was installed in R1 to R18 area. The results had on various building types and floors(B2-4F, 8F and
shown that the historical data could be received by HES 18F).
successfullye. In the future, when the NB-IoT communication • The effects of power line length and diameter which
module is commercialized and the telecom operators are communication module of narrowband PLC is installed
officially negotiated. We can expect that cellular in have a significant impact on the communication
communication technology will be replaced by NB-IoT. performance. The communication performance
decreases due to communication transmission is not
TABLE II. SPECIFICATION OF VARIOUS COMMUNICATION MODULES synchronized.
Communication • It is important to note that a better integration with
A B C D E F
module communication module and meter will provide a better
R1 O O O -- -- O
R2 O O O -- -- O
communication performance. It is found that the
R3 O O O -- -- O communication performance decrease as a poor
R4
R5
O
O
O
O
O
O
--
--
--
--
O
O
integration with communication module and meter due
R6 O O O -- -- O to the transmit power decrease.
R7 O O O -- -- O
R8
R9
O
O
O
O
O
O
--
--
--
--
O
O
• In Taiwan, communication module of RF using 920
R10 O O O -- -- O MHz band requires a higher transmit power due to the
R11 O O O -- -- O signal may be masked by LoRa, which decrease the
R12 O X O -- -- O
R13 O O O -- -- O communication performance.
R14 O O O -- -- O
R15 O O O -- -- O
R16 O O O -- -- O References
R17 O O O -- -- O
R18 O O O -- -- O [1] Stanislav Chren, Bruno Rossi and Tom´aˇs Pitner, “ Smart grids
P1~P14 -- -- -- O O -- deployments within EU projects: The role of smart meters,” Smart Cities
Symposium Prague (SCSP), 2016.
[2] Y. I. Kim, S. J. Park, N. J. Jung, M. S. Choi, B. S. Park, "Design and
implementation of NMS using SNMP for AMI network device
monitoring," IEEE International Conference on Power System
Technology, pp. 1-6, Oct. 2016.
[3] L. González-Sotres, C. Mateo, P. Frías, C. Rodríguez-Morcillo, J.
Matanza, "Replicability Analysis of PLC PRIME Networks for Smart
Metering Applications," IEEE Transactions on Smart Grid, Issue: 99, pp.
1-9.
[4] A. Mishra, H. Tayal, M. A. Khan, M. RaZa, "Suitable PHY Layer of
Narrow-band Power Line Carrier Communication in Emerging
Advanced Metering Infrastructure Scenario,"IEEE Conference on
Standards for Communications and Networking (CSCN), pp. 235-239,
Oct. 2015.
[5] A. A. Sheikh, Q. Idrees, M. Ahmad, M. A. Arshad, I. Mahmood, U. U.
Fayyaz, I. E. Rana, and N. A. Zaffar, "Feasibility of NB-PLC in LT
Power Distribution Network of Electric Utility in Pakistan", Power
Systems Conference (PSC), South California, USA, pp.1-7, 2016.
[6] F. Malandra, B. Sans`o, "Analytical performance analysis of a large-
scale RF-mesh smart meter communication system," IEEE Innovative
Smart Grid Technologies Conference (ISGT), pp. 1-5, Feb. 2015.
[7] J. Mafra Jr.,M. Hosami, L. Freitas, M. Martinelli, A. Almeida, "Hybrid
Communication Module – Motivations, Requirements, Challenges and
Implementations," Innovative Smart Grid Technologies Latin America
(ISGT LATAM), Montevideo, Uruguay, pp. 25-29, Oct. 2015.
[8] Rapeepat Ratasuk, Benny Vejlgaard, Nitin Mangalvedhe and Amitava
Ghosh, "NB-IoT System for M2M Communication" Workshop on
Device to Device communications for 5G NETWORKS, 2016.
[9] Wenjie Yang, Mao Wang, Jingjing Zhang, Jun Zou, Min Hua, Tingting
Xia and Xiaohu You, " Narrowband Wireless Access for Low-Power
Massive Internet of Things: A Bandwidth Perspective" IEEE Wireless
Communications, pp. 138-145, Jun. 2017.
[10] J. H. Huh, K. Seo, “Smart Grid Framework Test Bed Using OPNET and
Power Line Communication” 8th International Conf. on Soft Computing
and Intelligent Systems and 17th International Symposium on Advanced
Intelligent Systems(SCIS&ISIS)., Sapporo, Japan, pp.736-742, 2016.
[11] S. Sree Lekshmi, P. Sivraj and K. K. Sasi, “Selection of routing
protocols for advanced metering infrastructure,”Int. Conf. on Advances
in Computing, Communications and Informatics (ICACCI)., Jaipur,
india, pp.1335-1339, 2016.
[12] U. Ozgur, S. Tonyali, and K. Akkaya, “Testbed and Simulation-based
Evaluation of Privacy-preserving Algorithms for Smart Grid AMI
Networks”IEEE 41st Conf. on Local Computer Networks
Workshops(IEEE LCN 2016)., Dubai, UAE, pp.181-186, 2016.