8 Lightning Calculation
8 Lightning Calculation
THIS SHEET IS ONLY FOR INTERNAL USE "DO NOT ATTACH WITH DOCUMENT"
SHEET # PAGE
1 Cover sheet
2 Record of Revision
3 Project details
4 Objective and Scope
5 Statutory Codes & standards
6 Site Climatic conditions
7 General power supply conditions
8 Universal parameters of Contract
9 List of Vendor drawings & documents
10 Technical Specifications-Equipment Specific
11 List of Attachments
12 Special Notes
DOCUMENT NO. : 2M0042 - 7402 - BE - 1006
REVISION : 0
REV DATE: 21st June 2018
LIGHTNING CALCULATION
OWNER'S
-
CONSULTANT
4 OF 75
5 OF 75
OBJECTIVE AND SCOPE
TKII'S DRG # CONTACTOR'S DRG # OWNER'S DRG #
2M0042 - 7402 - BE - 1006 - 0
REVISION NO. 0 DATE 21st June 2018
OBJECTIVE
The objective of this document is to encompass the typical design calculations for
earthing system envisaged for Urea product handling system
SCOPE
Following areas are covered under typical design calcualtions
AQC-1 & 2 BOILERS, PH-1 & 2 BOILERS, STG BUILDING, COOLING TOWER
6 OF 75
7 OF 75
s to encompass the typical design calculations for
8 OF 75
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
1] DESIGN BASIS -
2. Lighting Risk factor which is basis for providing protection is evaluated for the buildings a
below given list
3. Self-conducting structures may not be provided with aerial rods and down conductors.
They shall be connected to the earthing system at minimum two points of the base.
5. Since, PH Boiler is below the tallest structure in the plant i.e. Preheater next to it
PH Boiler structures will be protected from existing Cement Plant Lightning
arrester on Preheater.
Considering this, Lightning Protection is considered for STG Building and AQC Boilers.
6. In this calculation, Lighting calculation for STG Buidlign is considered since, STG Building
being comparatively biggest buidling.
7. Below is Summary of Lightning Arresters Qty envisaged for supply as per calculation
AREA Qty
STG Building 2
PH Boiler-1 0
PH Boiler-2 0
AQC Boiler-1 2
AQC Boiler-2 2
Cooling Tower 2
Total 8
9 OF 75
10 OF 75
HTNING PROTECTION SIZING CALC
11 OF 75
12 OF 75
LIST OF ATTACHMENTS
TKII'S DRG # CONTACTOR'S DRG # OWNER'S DRG #
0 0 0
REVISION NO. 0 DATE 0
NOTE:
13 OF 75
Attachments given in above table shall be considered as part of this document
14 OF 75
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
As per IS/IEC 60305:2010, for this building Loss of human life (L1) and economic loss (L4) are
relevant for this type of structure.
It is required to evaluate the need for protection. This implies the need to determine the risk R1
for loss of human life (L1) with the risk components R A, RB, RU Aand RV and to compare it with th
tolerable risk RT = 10-5 (according to Table 4). The tolerable risk RT for economic loss is 10 -3.
Considering this, the suitable protection measures to mitigate human life risk will inturn mitigat
economical loss as well.
Data for incomming Power lines & their internal systems connected
15 OF 75
Resulting PLD
parameters 0.6 Table B.8
PLI 0.3 Table B.9
16 OF 75
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0040-7402-BE-1006
REVISION NO. 0 DATE 21st June 2018
17 OF 75
18 OF 75
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0040-7402-BE-1006
REVISION NO. 0 DATE 21st June 2018
D1 RA ### 1.17E-09
Injury RU = RU/P 1.7E-06 1.67E-06
D2 RB 2.3E-10 2.34E-10
Physical damage RV = RV/P 3.3E-07 3.35E-07
Total ### R1 = ###
Tolerable R1 > RT: Lightning Protection is requried.
However, still a nominal protection is provided as per IS/IEC 62305 as per agreed specs.
19 OF 75
20 OF 75
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0040-7402-BE-1006
REVISION NO. 0 DATE 21st June 2018
Below Values of rolling sphere radius, mesh size and protection angle corrosponding to th
LPS of Class - IV shall be considered as per Table-2.
21 OF 75
22 OF 75
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
As per IS/IEC 60305:2010, for this building Loss of human life (L1) and economic loss (L4) are
relevant for this type of structure.
It is required to evaluate the need for protection. This implies the need to determine the risk R1
for loss of human life (L1) with the risk components R A, RB, RU Aand RV and to compare it with the
tolerable risk RT = 10-5 (according to Table 4). The tolerable risk RT for economic loss is 10 -3.
Considering this, the suitable protection measures to mitigate human life risk will inturn mitigate
economical loss as well.
Data for incomming Power lines & their internal systems connected
D1 RA ### 1.34E-09
Injury RU = RU/P 1.8E-06 1.78E-06
D2 RB 5.4E-10 5.37E-10
Physical damage RV = RV/P 7.1E-07 7.11E-07
Total ### R1 = ###
Tolerable R1 > RT: Lightning Protection is requried.
However, still a nominal protection is provided as per IS/IEC 62305 as per agreed specs.
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
Below Values of rolling sphere radius, mesh size and protection angle corrosponding to the
LPS of Class - IV shall be considered as per Table-2.
As per IS/IEC 60305:2010, for this building Loss of human life (L1) and economic loss (L4) are
relevant for this type of structure.
It is required to evaluate the need for protection. This implies the need to determine the risk R1
for loss of human life (L1) with the risk components R A, RB, RU Aand RV and to compare it with the
tolerable risk RT = 10-5 (according to Table 4). The tolerable risk RT for economic loss is 10 -3.
Considering this, the suitable protection measures to mitigate human life risk will inturn mitigate
economical loss as well.
Data for incomming Power lines & their internal systems connected
D1 RA 0.00E+00 ###
Injury RU = RU/P 0 0
D2 RB 1.37E-09 1.37E-09
Physical damage RV = RV/P 1.27E-06 1.27E-06
Total 1.27E-06 R1 = ###
Tolerable R1 > RT: Lightning Protection is requried.
However, still a nominal protection is provided as per IS/IEC 62305 as per agreed specs.
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
Below Values of rolling sphere radius, mesh size and protection angle corrosponding to the
LPS of Class - IV shall be considered as per Table-2.
As per IS/IEC 60305:2010, for this building Loss of human life (L1) and economic loss (L4) are
relevant for this type of structure.
It is required to evaluate the need for protection. This implies the need to determine the risk R1
for loss of human life (L1) with the risk components R A, RB, RU Aand RV and to compare it with the
tolerable risk RT = 10-5 (according to Table 4). The tolerable risk RT for economic loss is 10 -3.
Considering this, the suitable protection measures to mitigate human life risk will inturn mitigate
economical loss as well.
Data for incomming Power lines & their internal systems connected
D1 RA 0.00E+00 ###
Injury RU = RU/P 0 0
D2 RB 8.92E-10 8.92E-10
Physical damage RV = RV/P 9.89E-07 9.89E-07
Total 9.90E-07 R1 = ###
Tolerable R1 > RT: Lightning Protection is requried.
However, still a nominal protection is provided as per IS/IEC 62305 as per agreed specs.
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
Below Values of rolling sphere radius, mesh size and protection angle corrosponding to the
LPS of Class - IV shall be considered as per Table-2.
As per IS/IEC 60305:2010, for this building Loss of human life (L1) and economic loss (L4) are
relevant for this type of structure.
It is required to evaluate the need for protection. This implies the need to determine the risk R1
for loss of human life (L1) with the risk components R A, RB, RU Aand RV and to compare it with the
tolerable risk RT = 10-5 (according to Table 4). The tolerable risk RT for economic loss is 10 -3.
Considering this, the suitable protection measures to mitigate human life risk will inturn mitigate
economical loss as well.
Data for incomming Power lines & their internal systems connected
D1 RA 0.00E+00 ###
Injury RU = RU/P 0 0
D2 RB 4.55E-10 4.55E-10
Physical damage RV = RV/P 7.27E-07 7.27E-07
Total 7.27E-07 R1 = ###
Tolerable R1 > RT: Lightning Protection is requried.
However, still a nominal protection is provided as per IS/IEC 62305 as per agreed specs.
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
Below Values of rolling sphere radius, mesh size and protection angle corrosponding to the
LPS of Class - IV shall be considered as per Table-2.
As per IS/IEC 60305:2010, for this building Loss of human life (L1) and economic loss (L4) are
relevant for this type of structure.
It is required to evaluate the need for protection. This implies the need to determine the risk R1
for loss of human life (L1) with the risk components R A, RB, RU Aand RV and to compare it with the
tolerable risk RT = 10-5 (according to Table 4). The tolerable risk RT for economic loss is 10 -3.
Considering this, the suitable protection measures to mitigate human life risk will inturn mitigate
economical loss as well.
Data for incomming Power lines & their internal systems connected
D1 RA 0.00E+00 ###
Injury RU = RU/P 0 0
D2 RB 4.72E-10 4.72E-10
Physical damage RV = RV/P 7.37E-07 7.37E-07
Total 7.37E-07 R1 = ###
Tolerable R1 > RT: Lightning Protection is requried.
However, still a nominal protection is provided as per IS/IEC 62305 as per agreed specs.
LIGHTNING PROTECTION SIZING CALC
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 21st June 2018
Below Values of rolling sphere radius, mesh size and protection angle corrosponding to the
LPS of Class - IV shall be considered as per Table-2.
Various Reference Tables from IS/IEC 62305:2010 which are used in Calculat
62 OF 75
63 OF 75
TECHNICAL SPECIFICATIONS
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 18th June 2018
64 OF 75
65 OF 75
TECHNICAL SPECIFICATIONS
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 18th June 2018
66 OF 75
67 OF 75
TECHNICAL SPECIFICATIONS
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 18th June 2018
68 OF 75
69 OF 75
TECHNICAL SPECIFICATIONS
TKII'S DRG #
2M0042 - 7402 - BE - 1006
REVISION NO. 0 DATE 18th June 2018
70 OF 75
71 OF 75
s from IS/IEC 62305:2010 which are used in Calculation
72 OF 75
73 OF 75
74 OF 75
75 OF 75