Functional Change of Sac Into Iac: Standard Field Operating Procedure

This standard operating procedure outlines the steps for functionally changing a service air compressor (SAC) into an instrument air compressor (IAC) at the 2x800 MW Yermarus Thermal Power Station. The 8 steps close valves on the SAC and IAC, open valves to connect the dryer and compressor between the SAC and IAC, start the SAC compressor, and ensure the dryer motor is rotating while the compressor is operating. This process allows for instrument air to be supplied from a SAC when an IAC is unavailable.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
282 views

Functional Change of Sac Into Iac: Standard Field Operating Procedure

This standard operating procedure outlines the steps for functionally changing a service air compressor (SAC) into an instrument air compressor (IAC) at the 2x800 MW Yermarus Thermal Power Station. The 8 steps close valves on the SAC and IAC, open valves to connect the dryer and compressor between the SAC and IAC, start the SAC compressor, and ensure the dryer motor is rotating while the compressor is operating. This process allows for instrument air to be supplied from a SAC when an IAC is unavailable.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

STANDARD FIELD OPERATING PROCEDURE

2x800 MW Yermarus Thermal Power Station.


FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 1
PMPL/RPCL/BTG/SOP/33 Revision Date:

FUNCTIONAL CHANGE
OF SAC INTO IAC

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 2
PMPL/RPCL/BTG/SOP/33 Revision Date:

INDEX
1. OBJECTIVE
2. SCOPE
3. INTRODUCTION
4. RESPONSIBILITY
5. SAFETY PRECAUTIONS
6. SAFETY PPE’S
7. STEPS FOLLOWED
8. ABBREVIATIONS

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 3
PMPL/RPCL/BTG/SOP/33 Revision Date:

1. OBJECTIVE:
Smooth functional change of SAC in IAC.
2. SCOPE:
This SOP is applicable for 4 no. of Service air Compressor.

3. INTRODUCTION:
During the emergency condition when IAC is not available for any
reason we can produce instrument air from service air compressor
using the dryer of IAC and compressor of SAC. Changeover is only
possible in the connected Instrument air compressor and service air
compresssor i.e. between (IAC A & SAC A), (IAC B & SAC B), (IAC C &
SAC C) and (IAC D & SAC D).

4. RESPONSIBILITY:
Unit Control Engineer, Desk Engineer and Field Operator.

5. SAFETY PRECAUTIONS:
Field Operator ensures no permit to work is pending on regarding this
system by checking with CCR.

6. SAFETY PPE’S:
Ear Plugs, Safety Goggles, Hand Gloves, etc.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 4
PMPL/RPCL/BTG/SOP/33 Revision Date:

7. STEPS FOLLOWED
 STEP 1:- Close SAC A service air outlet valve.

 STEP 2:- Close IAC A compressed air outlet valve.

 STEP 3:- Open Air Dryer air outlet valve of IAC A.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 5
PMPL/RPCL/BTG/SOP/33 Revision Date:

 STEP 4 :- Open the valve between the IAC A and SAC A

 STEP 5 :- Open the regeneration valve of SAC B.

 STEP 6 :- Switch ON the connection of dyer motor from SAC A


control panel.

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 6
PMPL/RPCL/BTG/SOP/33 Revision Date:

 STEP 7 :- Check the power supply and SAC A comprressor


cooling water inlet and outlet pressure before starting the
comprssor.

 STEP 8 :- Start the compressor by removing the EPB &


switching it ON .

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head
STANDARD FIELD OPERATING PROCEDURE
2x800 MW Yermarus Thermal Power Station.
FUNCTIONAL CHANGE OF SAC INTO IAC
Document No.: Revision No.:
Effective Date: Page 7
PMPL/RPCL/BTG/SOP/33 Revision Date:

1. Note:- Ensure that theDryer motor is rotating while the compressor is


on load
8. Abbreviations:-
a. IAC :- Instrument air compressor
b. SAC :- Service Air Compressor

Prepared by (PMPL): Reviewed by (PMPL): Reviewed by (RPCL): Approved by (RPCL):


Signature: Signature: Signature: Signature:

Name: Name: Name: Name:


Desg.: Operation In-Charge Desg.: Site In-Charge Desg.: Operation In-charge Desg.: Plant Head