Use of Domestic Product For Electricity Infrastructure Development

This document outlines Indonesia's regulations for using domestic products in electricity infrastructure development, specifically for steam power plants (PLTUs). It discusses the implementation of PLTUs based on capacity, required components, rules around importing goods, assessing and verifying domestic content levels (TKDN), TKDN thresholds, administrative sanctions for not meeting TKDN requirements, and financial penalties for shortfalls in TKDN levels. The overall purpose is to promote the use and development of domestic products in Indonesia's electricity sector.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views11 pages

Use of Domestic Product For Electricity Infrastructure Development

This document outlines Indonesia's regulations for using domestic products in electricity infrastructure development, specifically for steam power plants (PLTUs). It discusses the implementation of PLTUs based on capacity, required components, rules around importing goods, assessing and verifying domestic content levels (TKDN), TKDN thresholds, administrative sanctions for not meeting TKDN requirements, and financial penalties for shortfalls in TKDN levels. The overall purpose is to promote the use and development of domestic products in Indonesia's electricity sector.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPS, PDF, TXT or read online on Scribd
You are on page 1/ 11

USE OF DOMESTIC PRODUCT

FOR ELECTRICITY
INFRASTRUCTURE
DEVELOPMENT
STEAM POWER PLANT (PLTU)
Regulation

PERMENPERIN
PERMENPERIN PERMENESDM
NO. 3/2014
NO. 54/2012 NO. 03/2015
NO. 16/2011
Ministry of Energy and Mineral Resources Regulation No.
03/2015 : “Power Purchase Procedure” article No.5
IMPLEMENTATION Of PLTU
Until 135 MW per unit shall be implemented
and lead by national company
Over 135 MW per unit shall be implemented
by national company or in consortium with
foreign company

Article 16, Permen 54/M-IND/PER/3/2012


Components Of PLTU

Main components of goods : Steam


Turbine, Boiler, Generator, Electrical,
Instrument and Control, Balance of Plant
and/or Civil and Steel Structure
Service : consultancy (Feasibility Study),
Integrated Engineering, Procurement, and
Construction, Inspection, Verification,
Certification and/or supporting services.

Article 6 (2), Permen 54/M-IND/PER/3/2012


Imported Goods
Procurement of imported goods is allowed if:
1. The goods have not yet been produced in
Indonesia
2. Technical specifications of domestically
produced goods do not meet the
specified requirements
3. Quantity of domestic product does not
meet demand

Article 3 (2), Permen 54/M-IND/PER/3/2012


TKDN Assessment &
Verification
Self Assessment
 Supplier shall conduct self-assessment of the TKDN
value based on its reliable data in responsible manner
 Reliable data shall include:
 Self-owned data
 Data supplied by vendor

Verification
Goods/service user may request supplier for clarification on
the TKDN value which is submitted by supplier or appointing
an independent surveyor to conduct verification

Article 22, Permen 54/M-IND/PER/3/2012


TKDN Threshold Value

TKDN
TYPE Capacity
Goods Service Combination
PLTU s/d 15 MW 67.95 96.31 70.79
15-25 MW 45.36 91.99 49.09
25-100 MW 40.85 88.07 44.14
100 – 600 MW 38 71.33 40
600 MW 36.1 71.33 38.21

Chapter II, Permen 54/M-IND/PER/3/2012


Administrative Sanction
Written warning

TKDN value at the end of project fails to meet the


minimal requirement
Fails to provide supporting data of self-
assessment result and/or refuses verification
Falsification of local content data intentionally
which will have effect on TKDN value
(2 Years)
Black list

Totally fails the use of domestic product.

Article 27, Permen 54/M-IND/PER/3/2012


Financial Sanction

16.00%
4.99%
14,97 %
14.00%

12.00% BLACKLIST
3.33%
Penalty (%)

10.00%

8.00% Penalty

6.00%

4.00%

2.00%

0.00%
0.00% 2.00% 4.00% 6.00% 8.00% 10.00%

Article 27, Permen 54/M-IND/PER/3/2012


∆ TKDN
TERIMA KASIH