0% found this document useful (0 votes)
66 views

Outlet: Basin / Tunnel Outlet Monitoring Table

This document provides a monitoring table for the outlet: basin/tunnel outlet project. It shows the description, quantity, rates, amounts earned, and percentages earned for 14 items of work over the current, previous, and this week. The sub-total earned for the project so far is $42,480,965.27 or 75.47% of the total cost, with $32,058,608.41 earned as of the previous week and $30,267,277.59 earned for this week, an increase of $1,791,330.82.

Uploaded by

edla3710
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views

Outlet: Basin / Tunnel Outlet Monitoring Table

This document provides a monitoring table for the outlet: basin/tunnel outlet project. It shows the description, quantity, rates, amounts earned, and percentages earned for 14 items of work over the current, previous, and this week. The sub-total earned for the project so far is $42,480,965.27 or 75.47% of the total cost, with $32,058,608.41 earned as of the previous week and $30,267,277.59 earned for this week, an increase of $1,791,330.82.

Uploaded by

edla3710
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

OUTLET: BASIN / TUNNEL OUTLET MONITORING TABLE

CURRENT PREVIOUS WEEK THIS WEEK


ITEM NO. DESCRIPTION UOM BOQ QTY RATE AMOUNT EARNED % EARNED AMOUNT EARNED % EARNED AMOUNT EARNED % EARNED AMOUNT
4.1 Outlet: Basin/Tunnel Outlet

4.1.1 Clearing and Grubbing sq.m. 2,040.00 674.66 1,376,298.71 100.00% 1,376,298.71 100.00% 1,376,298.71 0.00% -

4.1.2 Common Excavation cu.m. 400.00 2,193.29 877,314.30 100.00% 877,314.30 100.00% 877,314.30 0.00% -

4.1.3 Rock Excavation cu.m. 2,300.00 4,926.27 11,330,419.99 100.00% 11,330,419.99 100.00% 11,330,419.99 0.00% -

4.1.4 Common Backfill cu.m. 500.00 3,649.28 1,824,642.27 100.00% 1,824,642.27 100.00% 1,824,642.27 0.00% -

4.1.5 Gravel Fill cu.m. 15.00 8,424.77 126,371.51 100.00% 126,371.51 100.00% 126,371.51 0.00% -

4.1.6 Lean Concrete cu.m. 15.00 45,168.42 677,526.23 100.00% 677,526.23 100.00% 677,526.23 0.00% -

4.1.7 Structural Concrete cu.m. 90.00 49,817.76 4,483,598.64 39.95% 1,791,330.82 0.00% - 39.95% 1,791,330.82

Transition Tunnel cu.m. 29.23 49,817.76 1,455,953.86 23.21% 337,911.70 0.00% - 23.21% 337,911.70
Foundation slab cu.m. 6.78 49,817.76 337,911.70 100.00% 337,911.70 - 100.00% 337,911.70
Walls cu.m. 6.88 49,817.76 342,917.79 - - 0.00% -
Cirved Roof / Arch cu.m. 15.56 49,817.76 775,124.37 - - -
Transition Basin cu.m. 60.77 49,817.76 3,027,644.78 48.00% 1,453,419.13 0.00% - 48.00% 1,453,419.13
Foundation shear key/slab cu.m. 29.17 49,817.76 1,453,419.13 100.00% 1,453,419.13 - 100.00% 1,453,419.13
Walls cu.m. 31.60 49,817.76 1,574,225.65 - - 0.00% -
4.1.8 Waterstop lm 52.00 18,445.01 959,140.48 - - 0.00% -
4.1.9 Reinforcing Steel kg 9,000.00 487.62 4,388,544.45 37.72% 1,655,415.66 37.72% 1,655,415.66 0.00% -

Transition Tunnel kg 3,194.69 487.62 1,557,781.05 15.69% 244,367.38 15.69% 244,367.38 0.00% -
Foundation slab kg 501.15 487.62 244,367.38 100.00% 244,367.38 100.00% 244,367.38 0.00% -
Walls kg 1,536.78 487.62 749,359.71 - - 0.00% -
Cirved Roof / Arch kg 1,156.76 487.62 564,053.95 - - 0.00% -
Transition Basin kg 5,805.31 487.62 2,830,763.41 49.85% 1,411,048.28 49.85% 1,411,048.28 0.00% -
Foundation shear key/slab kg 2,893.77 487.62 1,411,048.28 100.00% 1,411,048.28 100.00% 1,411,048.28 0.00% -
Walls kg 2,911.54 487.62 1,419,715.13 - - 0.00% -
4.1.10 Shotcrete with wiremesh sq.m. 600.00 9,744.01 5,846,408.60 100.00% 5,846,408.60 100.00% 5,846,408.60 0.00% -

4.1.11 Rock Anchors pcs 130.00 48,235.73 6,270,644.77 100.00% 6,270,644.77 100.00% 6,270,644.77 0.00% -

4.1.12 Handrail pcs 20.00 46,248.26 924,965.20 - - 0.00% -

4.1.13 Steel Grating sq.m. 14.20 80,934.47 1,149,269.45 - - 0.00% -


4.1.14 Formwork sq.m. 200.00 11,229.10 2,245,820.66 12.57% 282,235.55 12.57% 282,235.55 0.00% -

Transition Tunnel sq.m. 70.18 11,229.10 788,077.08 11.30% 89,053.64 11.30% 89,053.64 0.00% -
Foundation slab sq.m. 7.93 11,229.10 89,053.64 100.00% 89,053.64 100.00% 89,053.64 0.00% -
Walls sq.m. 28.07 11,229.10 315,155.77 - - -
Cirved Roof / Arch sq.m. 34.19 11,229.10 383,867.68 - - -
Transition Basin sq.m. 129.82 11,229.10 1,457,743.57 13.25% 193,181.91 13.25% 193,181.91 0.00% -
Foundation shear key/slab sq.m. 17.20 11,229.10 193,181.91 100.00% 193,181.91 100.00% 193,181.91 0.00% -
Walls sq.m. 112.61 11,229.10 1,264,561.66 - - 0.00% -
SUB-TOTAL 42,480,965.27 75.47% 32,058,608.41 71.25% 30,267,277.59 4.22% 1,791,330.82