RCD Pile

(1) The document discusses the use of reverse circulation drill (RCD) piles for Project LRT Line 3. (2) RCD piling involves drilling a pile shaft using a drilling rig while circulating drilling fluid to remove cut soil. (3) Benefits of RCD piles include limiting construction disturbance and noise, controlling excavated soil, and obtaining better pile quality. (4) The presentation outlines the RCD piling process and provides examples of past projects where RCD piles were successfully used.

Uploaded by

Hasrina ramazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
820 views

RCD Pile

(1) The document discusses the use of reverse circulation drill (RCD) piles for Project LRT Line 3. (2) RCD piling involves drilling a pile shaft using a drilling rig while circulating drilling fluid to remove cut soil. (3) Benefits of RCD piles include limiting construction disturbance and noise, controlling excavated soil, and obtaining better pile quality. (4) The presentation outlines the RCD piling process and provides examples of past projects where RCD piles were successfully used.

Uploaded by

Hasrina ramazi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

PROJECT LRT LINE 3

TECHNICAL & METHOD STATEMENT PRESENTATION


FOR
REVERSE CIRCULATION DRILL (RCD) PILE

Piling Contractor : GEOFORCE EAST SDN BHD


1.0 INTRODUCTION

What is Reverse Circulation Drill (RCD) method?


Benefit of RCD Pile
1.0 Introduction
What Is RCD Pile?

RCD method provides a continuity drilling with extension 3.0m drill rod at every
stage of drilling work
Soilslurry will be sucked up through the rod where the suction force being
produce by the suction pump mounted on the RCD rig
Slurry is then discharge into siltation tank provided on site for segregation of
the soil and water
Water is then discharged back into the bored shaft and drilling work shall carry
on by circulation of the water
1.0 Introduction (con’t)
✓ Benefit of RCD Pile

 Good for limitation of construction space


 High water table level would potentially delay if using caisson method
 No vibration compared to other drilling method
 Free of sound disturbance
 Better control of excavated soil within the siltation pond
 Better choice for big diameter and deep boring pile
 Less disturbance to bored pile wall and provide better skin friction
 Better pile verticality can be obtained
2.0 Plant & Equipment

 List of Plant & Equipment for the project


 Reverse Circulation Drill (RCD) Rig Specification
2.0 Plant and Equipment

-List of Plant and Equipment for the project

No. Plant & Equipment Description


1 Reverse Circulation Drilling Rig For bored pile drilling works
2 Service Crane (mobile crane) For hoisting of equipment / materials (RCD rig,
reinforcement cage, boring tools and etc)
3 Temporary Casing (3000mm diameter) Temporary support for bored hole
4 Excavator For site platform preparation for drilling rig
5 Tremie Set For concreting of bored pile in wet condition
6 Water Pump For pumping of water
7 Generator Set Power supply for RCD Rig and equipment
3.0 METHOD STATEMENT FOR RCD PILE
3.0 Method Statement for RCD Pile

 Platform preparation
 Surveying and setting out
 Installation of Steel Casing
 Setting up of RCD Machine and detention tank
 Drilling of the bored pile shaft
 Steel cage installation
 Installation of Tremie Pipes
 Concreting
 Removal of temporary casing & backfill of empty bored shaft
4.0 Consequence of Works
for RCD PILE
4.1 Drilling Process
– Plan view during drilling process
4.2 Drilling Process
– Sectional view during drilling process
4.3 Steel Cage Installation Process
– Plan view during steel cage installation
4.4 Steel Cage Installation Process
– Sectional view during steel cage installation
4.5 Concrete Process
– Plan view during concreting process
4.6 Concrete Process
– Section view during concreting process
5.0 Past Completed Project with RCD Method
5.1 Past Completed Project with RCD Method

Project :
Road Widening at LDP, Sri
Damansara, Kuala Lumpur
Pile Size : 1500mm Dia
Drill Depth : 18.0m
5.2 Past Completed Project with RCD Method

Project :
V-Resident, Gurney, Penang

Pile Size : 750mm Dia


Drill Depth : 60.0m
5.3 Past Completed Project with RCD Method

Project :
MRT V3-Pier 27&28,
Bandar Utama

Pile Size : 2800mm Dia


Drill Depth : 35.0m
5.4 Past Completed Project with RCD Method

Project :
MASS RAPID TRANSIT LEMBAH
KELANG, JAJARAN SUNGAI
BULOH - KAJANG (PACKAGE V1)

Pile Size : 600mm Dia


Drill Depth : 40.0m
5.5 Past Completed Project with RCD Method

Project :
Kajang Bridge 2

Pile Size : 1800mm Dia


Drill Depth : 40.0m
5.6 Past Completed Project with RCD Method

Project :
Tanjung Bin

Pile Size : 1800mm Dia


Drill Depth : 40.0m
5.7 Past Completed Project with RCD Method

Project :
Next Success, Hotel, Penang

Pile Size : 1200mm Dia


Drill Depth : 80.0m
5.8 Past Completed Project with RCD Method

Project :
Loji Rawatan Kumbahan
Serantau, Penang
Pile Size : 1000mm Dia
Drill Depth : 76.0m
6.0 Current Project with RCD Method

Project : Pile Size : 3.0m Dia.


MRT LINE 2 Package V208, Pile Length : 38.0m
Seri Kembangan
THANK YOU