Operator: Total Pieces Minutes Per Piece

The document contains activity logs for two operators, A and B, recording their time spent working at a machine versus not present. It summarizes their total time observed, productive vs non-productive minutes, utilization percentage, total pieces completed, minutes per piece and daily capacity. Operator A spent 306 minutes total, 288 productive minutes at 94% utilization and completed 62 pieces at 4.65 minutes per piece. Operator B spent 326 minutes total, 275 productive minutes at 84% utilization and completed 85 pieces at 3.24 minutes per piece.

Uploaded by

zeshan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Operator: Total Pieces Minutes Per Piece

The document contains activity logs for two operators, A and B, recording their time spent working at a machine versus not present. It summarizes their total time observed, productive vs non-productive minutes, utilization percentage, total pieces completed, minutes per piece and daily capacity. Operator A spent 306 minutes total, 288 productive minutes at 94% utilization and completed 62 pieces at 4.65 minutes per piece. Operator B spent 326 minutes total, 275 productive minutes at 84% utilization and completed 85 pieces at 3.24 minutes per piece.

Uploaded by

zeshan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Operator A

Activity Time Start Time End Duration Minutes Remarks


Working At Machine 9:57:00 AM 12:03:00 PM 2:06 126.00 P
Not Prasent At Machine 12:03:00 PM 12:08:00 PM 0:05 5.00 NP
Working At Machine 12:08:00 PM 1:00:00 PM 0:52 52.00 P
Working At Machine 2:16:00 PM 2:22:00 PM 0:06 6.00 P
Not Prasent At Machine 2:22:00 PM 2:28:00 PM 0:06 6.00 NP
Working At Machine 2:28:00 PM 3:50:00 PM 1:22 82.00 P
Not Prasent At Machine 3:50:00 PM 3:53:00 PM 0:03 3.00 NP
Working At Machine 3:53:00 PM 4:15:00 PM 0:22 22.00 P
Not Prasent At Machine 4:15:00 PM 4:19:00 PM 0:04 4.00 NP

Summary
Totla time Observed 306
Non Productive Minutes 18.0
Productive Minutes 288.00
Utilization 94%
Total Pieces 62
Minutes per Piece 4.65
Capacity Per Day 103
Operator B

Activity Time Start Time End Duration Minites Remarks


Working At Machine 9:57:00 AM 10:45:00 AM 0:48 48.00 P
Not Prasent At Machine 10:45:00 AM 10:55:00 AM 0:10 10.00 NP
Working At Machine 10:55:00 AM 11:20:00 AM 0:25 25.00 P
Not Prasent At Machine 11:20:00 AM 11:30:00 AM 0:10 10.00 NP
Working At Machine 11:30:00 AM 1:00:00 PM 1:30 90.00 P
Working At Machine 2:16:00 PM 3:42:00 PM 1:26 86.00 P
Not Prasent At Machine 3:22:00 PM 3:25:00 PM 0:03 3.00 NP
Working At Machine 3:25:00 PM 3:46:00 PM 0:21 21.00 P
Not Prasent At Machine 3:46:00 PM 4:14:00 PM 0:28 28.00 NP
Working At Machine 4:14:00 PM 4:19:00 PM 0:05 5.00 P

Summary
Totla time Observed 326
Non Productive Minutes 51
Productive Minutes 275
Utilization 84%
Total Pieces 85
Minutes per Piece 3.24
Capacity Per Day 148