Operator: Total Pieces Minutes Per Piece
Operator: Total Pieces Minutes Per Piece
Summary
Totla time Observed 306
Non Productive Minutes 18.0
Productive Minutes 288.00
Utilization 94%
Total Pieces 62
Minutes per Piece 4.65
Capacity Per Day 103
Operator B
Summary
Totla time Observed 326
Non Productive Minutes 51
Productive Minutes 275
Utilization 84%
Total Pieces 85
Minutes per Piece 3.24
Capacity Per Day 148