Request For Inspection: (Client Name)

The document is a request for inspection from PT. Bangun Bejana Baja to PT. Pertamina Persero regarding painting inspection of 7 courses of a service water tank's shell and its roof plate and accessories at the Tanjung Sekong LPG Terminal project in Merak, Banten on July 9, 2018 at 8:00 AM. The inspection involves representatives from PT. Bangun Bejana Baja, PT. Wika, and PT. Pertamina Persero.

Uploaded by

Adi QC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
60 views

Request For Inspection: (Client Name)

The document is a request for inspection from PT. Bangun Bejana Baja to PT. Pertamina Persero regarding painting inspection of 7 courses of a service water tank's shell and its roof plate and accessories at the Tanjung Sekong LPG Terminal project in Merak, Banten on July 9, 2018 at 8:00 AM. The inspection involves representatives from PT. Bangun Bejana Baja, PT. Wika, and PT. Pertamina Persero.

Uploaded by

Adi QC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REQUEST FOR INSPECTION PT.

BANGUN BEJANA BAJA


Engineering, Procurement & Construction

Pekerjaan Engineering,Procurement &Construction (EPC) Proyek Tanjung Sekong, Merak-


Project Title Location
Pembangunan Terminal LPG Refrigerated Banten
WO No. 051/F00000/2016-S0 Report No. RFI-095
Customer/Client PT. PERTAMINA PERSERO Date 09 July 2018
Contractor WIKA-PEN CONSORTIUM Page 1 of 1
Sub-Contractor PT. BANGUN BEJANA BAJA

(Client Name) : Attn. Mr. Mulyono


QA/QC Manager

Gentlemen,

We would like to have your presence for inspection according to the following schedules.

Date and time Place/Area Inspection Item Remarks

09 July 2018
Service Water Tank
PAINTING INSPECTION OF :
8.00 AM (T-502)

1. 1st SHELL COURSE

2. 2nd SHELL COURSE

3. 3rd SHELL COURSE

4. 4th SHELL COURSE

5. 5th SHELL COURSE

6. 6th SHELL COURSE

7. ROOF PLATE

8. TANK ACCESSORIES

Tank  Civil Instrument Mechanical

Piping Structural Electrical

COMMENT :

Performed By Reviewed By Approved By


Involvement Party
PT.BANGUN BEJANA BAJA PT. WIKA PT. PERTAMINA PERSERO

Signature

Name NURZAMAIN ADI P.


Sign Date 09 July 2018
Job Title QC ENGINEER