0% found this document useful (0 votes)
702 views2 pages

Daily Report

Sampling is currently being done for a half sleeve polka dot shirt for Uniqlo and a women's maternity dress for H&M for the

Uploaded by

Shalu Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
702 views2 pages

Daily Report

Sampling is currently being done for a half sleeve polka dot shirt for Uniqlo and a women's maternity dress for H&M for the

Uploaded by

Shalu Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY REPORT

CUTTING
SHALU process:-
PROCESS:-
- Fabric unwind from the fabric rolls. Cutting
-keep unwind fabric in the storage space for 24 hours for fabric relaxation -At presen
-fabric spreading on the spreading table. - Fabric co
-placing marker paper on the lay. -No of pie
-100% inspection of parts and replacement of parts if needed. -Fabric len
-fabric cutting -Total no o
-Relaying the required parts for mitering. -Total no
-Ticketing -Total cos
-Sorting and bundling. -Total no
-Send to sewing department.

FINISHING

PROCESS:- Finishing
-Garment received from sewing department -In finishin
-Rough ironing -The mach
-Inside treaming and checking (dusting m

-Button closing -Per hour 2


-Top stitch checking -For ironin
-Finishing quality checking
- Measurement of garment
-Lot auditing
-Minoshima checking
-Minishima final checking
-Seal
-Label checking
-Dusting
-Presentation checking
-Ironing and folding
-size segregation
-Send to dry room for further process.

SAMPLING

PROCESS:-
-Tech pack received from buyer.
-Pattern making according to buyers requirement.
-After making the pattern ,the sample is made by using the pattern set.
-Size setting ,after making the sample size is set according to tech pack.if there is any fault ,
the sample is redone.
-Pre- production sample, after the buyer has inspected the sample ,a pre-production sample is made before
producing in bulk amount.
-After finalizing the sample ,grading is done to separate the samples from each other.
-After all these processes pattern and sample is delivered for final production.
REPORT

Cutting department details:-


-At present the cutting is going on for shirts under the brand "UNIQLO".
- Fabric consumption for one shirt= 1.26 m
-No of pieces of shirts cut in one ply= 6 shirts
-Fabric lengh of one ply = 6m
-Total no of band knife available in cutting department = 2
-Total no of straight knife available in cutting department= 9
-Total cost of cutting department- 5000 per day
-Total no of pieces cut in one day=9000 pieces

Finishing department details:-


-In finishing department around 4000 pieces finished per day.
-The machines used in finishing department are thread sucking machine
(dusting machine) and drying machine.

-Per hour 20 pieces checked in QC process.


-For ironing, a labour gets 1.80-/ Rs per garment.

Sampling details:-
-At present sampling is going on for half sleeve polka dot shirt under
the brand "UNIQLO" and women maternity dress under the brand
"H&M" which is for season 2020SU.
any fault ,

on sample is made before

her.

You might also like