A Report On Site HM Installation and Guidelines of Running Small Hydro Power.
A Report On Site HM Installation and Guidelines of Running Small Hydro Power.
Kathmandu, Nepal
Prepared By:
Bijaya Thani
Dordi Khola Jal Bidyut Company Limited
Tallo Khare Khola Hydropower Project (11MW)
Contents
ABBREVIATION .............................................................................................................................................. 6
1 GENERAL .................................................................................................................................................... 7
1.1 Project Background ....................................................................................................................... 7
1.2 Project Sumary .............................................................................................................................. 7
2 Fabrication of Penstock Pipe...................................................................................................................... 8
2.1 Hydro Mechanical Works Details ........................................................................................................ 8
2.1.1 Materials & Equipment required at hydro mechanical works ..................................................... 8
2.1.2 Manpower Available for the fabrication of penstock pipe .......................................................... 9
2.2 Cutting of the MS plate to required dimension .................................................................................. 9
2.3 Rolling of steel plate to required diameter....................................................................................... 10
2.3.1 Rolling Procedure ....................................................................................................................... 10
2.4 Welding of the pipe (Longitudinal and Circumference Welding) ..................................................... 11
2.5 Inspection of the welding joints........................................................................................................ 12
2.5.1 DPT (Dye Penetration Test) ........................................................................................................ 13
2.5.2 MPI (Magnetic Particle Inspection) ............................................................................................ 13
2.5.3 UT (Ultra Sound Testing) ............................................................................................................ 14
2.5.4 Radiography (X-ray Inspection) .................................................................................................. 14
2.6 Cleaning and Coating of Pipe ............................................................................................................ 14
3 Head Works (Installation of Hydro Mechanical Parts) ............................................................................. 15
3.1 Undersluice Gate............................................................................................................................... 15
3.1.1 Design Data ................................................................................................................................ 15
3.2 Undersluice Stoplog .......................................................................................................................... 16
3.3 Intake Gates ...................................................................................................................................... 16
3.3.1 Design Data ................................................................................................................................ 16
3.4 Intake Stoplog ................................................................................................................................... 17
3.5 Gravel Flushing Gate ......................................................................................................................... 17
3.5.1 Design Data ................................................................................................................................ 18
3.6 Gravel Flushing Stoplog..................................................................................................................... 18
3.7 Sand Flushing Gates .......................................................................................................................... 18
3.7.1 Design Data ................................................................................................................................ 18
3.8 Desander Outlet Gate ....................................................................................................................... 20
3.9 Coarse Trashrack ............................................................................................................................... 20
3.9.1 Design Data ................................................................................................................................ 20
3.10 Fine Trashrack ................................................................................................................................. 21
3.11 Steel Lining in Undersluice .............................................................................................................. 21
3.12 Bellmouth ........................................................................................................................................ 22
3.13 Expansion Joint ............................................................................................................................... 22
3.14 Air Release Valve ............................................................................................................................. 23
4 Hydro Mechanical & Electro Mechanical Works At Power House........................................................... 24
4.1 EOT Crane.......................................................................................................................................... 24
4.1.1Reference Standard for Overhead Travelling Crane ................................................................... 24
4.2 Turbine and auxiliaries ...................................................................................................................... 25
4.2.1 Reference Standard for Turbine ................................................................................................ 25
4.3 Governor ........................................................................................................................................... 26
4.3.1 Reference Standard for Governor.............................................................................................. 26
4.4 Alternating Current Generator ......................................................................................................... 26
4.4.1 Reference Standard for the AC Generator................................................................................. 27
4.5 Common Oil Pressure System ........................................................................................................... 27
4.5.1 Description of Oil pressure system ............................................................................................ 28
4.5.2 Specification of Turbine Oil ........................................................................................................ 30
4.5.3 Working Scheme ........................................................................................................................ 30
4.6 Water Cooling System ....................................................................................................................... 31
4.6.1 Reference Standard for Cooling Water System ......................................................................... 31
4.6.2 Application ................................................................................................................................. 32
4.6.3 Description ................................................................................................................................. 32
4.6.4 Control System ........................................................................................................................... 33
4.7 Pressure Relief Valve (PRV) ............................................................................................................... 33
4.8 Bifurcation......................................................................................................................................... 33
4.9 Earth Mat .......................................................................................................................................... 34
4.10 Tail Race Gate ................................................................................................................................. 35
5 Factors Affecting Degradation of Penstock Quality and Measures to be Followed for Proper
Inspection and Repair ................................................................................................................................. 36
5.1 Degradation Mechanism Evaluation ................................................................................................. 36
5.1.1 General Corrosion ...................................................................................................................... 37
5.1.2 Localized Corrosion .................................................................................................................... 37
5.2 A Case Study of Sundarijal Hydropower Plant Regarding Thickness Degradation ........................... 38
5.3 Inspection of Penstock and Pressure Conduits ................................................................................. 38
5.3.1 Inspection Procedures ............................................................................................................... 39
5.3.2 Frequency of Inspections ........................................................................................................... 39
5.3.3 Inspection Records ..................................................................................................................... 40
5.3.4 Pre-Inspection Work .................................................................................................................. 41
5.3.5 Initial (Visual) Assessment ......................................................................................................... 41
5.3.6 Detailed Assessment .................................................................................................................. 49
5.4 Penstock Evaluation .......................................................................................................................... 50
6 Guidelines for Operation and Maintenance of Hydropower Plant.......................................................... 51
6.1 Operation of Hydropower Plant Facilities/Equipment (Starting the System) ............................ 51
6.2 Black Start & System islands ............................................................................................................. 56
6.3 Guidelines for Maintenance of Hydropower Plants ......................................................................... 57
6.3.1 Maintenance of Civil Structures ................................................................................................. 57
6.3.2 Maintenance of Hydro-turbine & Auxiliaries ............................................................................. 62
6.3.3 Typical Problems in the Maintenance of Hydro-turbines .......................................................... 68
6.3.3 Maintenance of Generator & Auxiliaries ................................................................................... 71
6.3.4 Routine Maintenance of Power Transformers .......................................................................... 80
6.3.5 Routine Maintenance of Hydro-Mechanical Equipment ........................................................... 85
6.3.6 General Problems in Electrical Circuit and Checks..................................................................... 89
6.4 REQUIREMENTS FOR EFFECTIVE OPERATION AND MAINTENANCE ................................................. 89
6.4.1 Manpower Planning and Arrangement ..................................................................................... 89
6.4.2 Training Program for Operation & Maintenance........................................................................... 90
6.4.3 Planning and Arrangement of Spare Parts, Consumables, Tools and Testing Equipment ........ 91
6.5 Logging and Reporting ...................................................................................................................... 91
6.5.1 Logging ....................................................................................................................................... 91
6.5.2 Reporting........................................................................................................................................ 92
6.6 Equipment Labelling ......................................................................................................................... 93
6.7 A Typical Format for Spare Parts List / Monthly Report of Power Plant Operation and Maintenance
/ Typical Formats for Reporting .............................................................................................................. 94
7 Power House Generator Room Ventilation ....................................................................................... 107
7.1 Calculation of Heat Radiated by the Generator.............................................................................. 107
7.2 Calculation of Air Flow Required for Ventilation ............................................................................ 107
7.3 Routing Factor ................................................................................................................................. 108
7.4 Ventilation Fans .............................................................................................................................. 108
7.5 Layout of Fans ........................................................................................................................... 108
8 References ............................................................................................................................................. 110
ABBREVIATION
A.C. Alternative Current
AA All Aluminum
ABCB Air Break Circuit Breaker
ACE Area Control Error
ACSR Aluminum Conductor Steel Reinforced
AE/JE Assistant Engineer / Junior Engineer
AGC Automatic Generation Control
AVR Automatic Voltage Regulator
BDV Breakdown Voltage
CBM Condition Based Maintenance
CGLS Central Grease Lubrication System
D.C. Direct Current
D.G. Diesel Generator
DoED Department of Electricity Development
DP Degree of Polymerization
GoN Government of Nepal
G.B Guide Bearing
EPI Engine Performance Indicator
EMM Emergency Management Manager
EIA Environmental Impact Assessment
DT Draft Tube
GV Governor
HP High Pressure
HRC High Rupturing Capacity
NEA Nepal Electricity authority
NPS Nepal Power System
O&M Operation and Maintenance
O/L Over load
OLTC On-Load Tap Changer
OPU Oil Pressure Unit
OTI Oil Temperature Indicator
PCB Polychlorinated Biphenyls
PID Proportional Integral Derivative
PM Preventive Maintenance
PT Power Transformer
SCADA Supervisory Control and Data Acquisition
UPS Uninterrupted Power Supply
WTI Winding Temperature Indicator
SWL Standard Reservoir Water Level
T.B Thrust Bearing
T-G Turbine-Generator
TSD Temperature Sensitive device
UGB Upper Guide Bearing
1 GENERAL
Image: - Finished pipe after rolling & moving finished pipe with help of hydra
Gradually second pass and third pass results the required dimension pipe and tacking
(tack weld) is done to keep stricture rigid during lifting and repointing for the further
operations.
During edge preparation v notch is created where two ends of plate meet whose
notch (Bevel) angle is 70𝑜 and width is 2.5-3.5 mm with depth of approx. 8mm by
grinding action.
After the edge preparation cleaning of welding area is done by using brushes and
cleaning tools.
For welding, 95 A is supplied for root pass layer, and depending upon welding
rod diameter 117-120 A current is supplied for 3.15 mm diameter electrode where,
165-170 A current for 4 mm diameter electrode.
During welding three passes are performed from outside where cleaning is done
through grinding before starting a new pass. After welding of outer section a v-notch is
created before performing welding from inner section and DPT is run to inspect the
quality of weld. After DPT if everything is well inner layer welding is done which is
completed at 2 passes. Where cleaning and DPT is performed before starting a new
pass.
Image: - Welding of pipe from outside & grinding welding layer before next Pass
Image: - Welding From inside Image: - Grinding welding layer before next pass
Image: - Worker cleaning the surface of finished pipe / Primer & Coal tar used for the
coating of finished pipe.
3 Head Works (Installation of Hydro Mechanical Parts)
In this section we will discuss about hydro mechanical parts that are to be
installed at the head works. Following are the different hydro mechanical parts that are
to be installed at the head works.
Generally expansion joints are provided at the open section of the penstock pipe
i.e. section where pipe is not buried. In our project expansion joint are provided at
anchor block 6-9 and 19-20. And may be extended if more open section are likely to be
seen in design.
3.14 Air Release Valve
Air release Valve is used to flush out trapped air/void inside the penstock pipe
due to the siphoned area. In our project siphon is seen near suri khola crossing bridge
where we will be using air release valve. To permit isolation and servicing, air and
vacuum relief valves are normally equipped with a ball, gate, or butterfly shutoff valve.
4 Hydro Mechanical & Electro Mechanical Works At Power House
Power house is the heart of any power plant. It is the place where generation of
power takes place. In simple we deliver water that is carried by the penstock pipe to
the turbine in this placed for the generation of the electricity.
4.3 Governor
For the speed regulation and monitoring purpose we are using digital speed
governing equipment with electronic PID control.
Fig: - General Layout of Oil Pressure System of turbine (not followed in our project)
An oil pumping unit is provided for normal & emergency control operations of
turbine Guide vanes and normal operations of main inlet valve & generator brakes.
Pressurized oil is used to control the following equipment.
Two variable axial piston pumps, one as main and other standby (2.1 & 2.2) are driven
by electric motors (4.1 & 4.2). Check valves (6.1 & 6.2) prevent flow of oil from one
pump to another. Pressure valves (5.1 & 5.2) are provided to relief the excess pressure.
Check valve (16.1 & 16.2 ) maintains the unidirectional flow to the pressure line filter
(15.1 & 15.2), filters are provided with clogging devices which indicates the clogging
locally and also gives signal which is further processes in control panel. Normally one of
the filter remains in circuit and other in standby. Pressure gauges (13.1 & 13.25)
indicate the pressure developed by the pump before filter and manifold pressure
respectively.
Piston type accumulator (17.1 & 17.2) maintains constant pressure in the system
compensating for internal oil leakage. These can be isolated by shut off cum safety
block (18.1 & 18.2). Total effective oil of the accumulator meets the requirements in
case of emergency or pump failure of guide vanes close-open-close operations.
In addition to the two nos. A/C supply driven pump, a hand pump (24.0) is
added for operation during maintenance. Delivery of the hand pump is directly fed to
the system through check valve (23.0). An isolating valve (22.0) is provided to isolate
the hand pump circuit from the system. A pressure relif valve (12.0) provided to relief
excess pressure.
A Manifold block (28.0) is provided to mount the directional control valve and servo
valve. Pressure switch (27.0) is provided to give signal of low pressure on the manifold
block.
Return oil from the emergency control valves directly leads to the sump & other
return lines passes through a return line filter (34.0). In case of filter clogging, a
differential pressure switch fixed with the filter, gives local mechanical indication as well
as electrical signal. A check valve is also provided parallel to the filter to ensure the
return flow even in the severe most condition of filter clogging.
ISO Grade 68
AGMA Grade 2
Specific Gravity @ 60°F 0.873
Density, lbs/gal @ 60°F 7.27
Color, ASTM D1500 0.5
Flash Point (COC), °C 243
Viscosity (40 °C) 68 𝑚𝑚2 /sec
Viscosity Index 102
Direction poppet valve (31.1) is provided to control the position (fully open/fully
close) of main inlet valve. Main inlet valve open and close time is obtain through
line mounted throttle check valve (35.1 & 35.2)
Directional control valve D.C. valve (31.1) is used to control the position (fully
open/fully close) operation of bypass butterfly valve. Flow control is achieved
through double throttle check valve (30.1) fixed with D.C. valve. The D.C. valve
is a decent type which requires only a pulse to change position of spool and
remains there until next pulse is given to the other solenoid.
3) Brake Operations
The brake mechanism requires low pressure for the operations, which can be
obtained by pressure reducing valve (48.0). Direction control valve (29.2) is
provided for control position of brake. A throttle check valve (36.0) is provided
for flow control during the brake operations. Pressure relief valve (49.0) is also
provided in line to drain excess pressure to the tank in case pressure in brake
line exceeds the required value.
Direction control valve (29.3) is provided for control of air injection device
operation. Flow control is obtain through double throttle check valve (30.2) fixed
with D.C. valve & line mounted throttle check valve (47.0)
6) PRV
PRV is used to release the excess pressure in the penstock during closing of
guide vanes. PRV control is provided with logic to operate the same in
conjunction guide vane servomotor i.e. whenever the guide vane close at a
faster rate, the pressure in the penstock rises; the PRV shall open till excess
water in penstock is relived. The PRV servomotor is opened and closed by oil
pressure. The direction of oil pressure to the PRV servomotor is governed by the
position of regulating valve which in turn by the pilot servomotor. One no. oil
tank with necessary instrument is provided for the PEV operations through the
use of pilot servomotor and the regulating valve.
4.6.2 Application
Cooling water is required for following purpose.
4.6.3 Description
For application stated above, pressurized cooling water is required. Water for this
purpose is pumped from cooling water sump. Further 3 nos. centrifugal pump (2 main,
one for each unit +1 common standby) shall be provided. A gate valve at each pump
inlet and outlet shall be provided for isolating purpose, a check valve also shall be
provided to maintain the unidirectional flow. A pressure switch shall be provided at
outlet of each pump to indicate high and low pressure condition.
A pressure gauge shall be provided in common header line for local indication. A
globe valve is provided, which shall be used for regulating the flow. Duplex coarse
basket filter (500 micron) is provided in common header line for coarse filtration of the
water. Normally one will be remain in the circuit and other in standby. Further Duplex
fine basket filter (200 micron) is provided to in common header line. Normally one unit
remains in the circuit and other on standby. Duplex filter are basket type & manually
changeover, back flushing also can be done manually operating the back flushing valve.
A pressure gauge shall be provided after the fine filter in common header line for local
indication. After bifurcation line, a globe valve is provided, which shall be used for
regulating the flow. A pressure switch be provided to give low pressure signal to control
panel. A pressure gauge also provided in line for local indication of pressure.
4.8 Bifurcation
Bifurcation is the section in penstock pipe where the water flow is divided into
two parts for each turbine as we are using two turbines for the power generation.
Image: - Fabrication of Bifurcation
Numbers of sickle plate and stiffener beam are used to withstand the water
hammering effect which we can observe in above image.
Manage the complete hydro asset inventory using current asset condition
assessments
Identify the highest priority projects based on facts which are used to establish
an asset’s health, risk exposure, etc.
Manage risk by planning work according to fact-based priorities
Improve long term planning of project scopes, schedules and budgets.
Continue to add to the body of knowledge regarding the condition of each asset
and evolve the level of detail used in their assessment.
Corrosion
General Corrosion
Localized Corrosion
Pitting
Crevice corrosion
Under deposit corrosion
Microbiologically influenced corrosion
Stress Corrosion Cracking
Flow Sensitive Mechanisms
Erosion-cavitation
Flow accelerated corrosion
Fatigue
Mechanical fatigue
Thermal stratification
Thermal transients
Thermal transients
Other effects
Overload
Embrittlement
Fabrication defects
For penstocks, the prevalent degradation mechanisms are general and localized
corrosion
Once these and other pertinent factors have been addressed, the inspection
frequency can be established. Minimal guidelines for inspection frequency are as
follows:
A log should be established at the plant to record the date, type of inspection
performed, and results of all inspections performed on penstocks. Inspection results
should be forwarded to the engineering staff or other appropriate personnel for review
and evaluation. These records must be maintained for future reference. A documented
chronology of inspections, results, evaluations, and repairs will help identify the
development of any adverse trends and is essential for the proper maintenance of safe
penstocks.
Dates of inspection
Inspection participants
Names of facilities inspected
Description of inspection activities
All technical investigations, data analyses, and design studies
All recommendations made during or as a result of the inspection
Inspection reports should be distributed to all inspection participants and groups
associated with the facility. The reports should be kept on file by the responsible office
for a minimum of 10 years.
2) Alignment
Penstock alignment should be checked to verify substantial agreement with the original
design drawings. Penstock misalignment could indicate slope movement and settlement
that could cause a penstock rupture if the movements were of sufficient magnitude to
allow joints to open up or rupture to occur.
The inspector should look for signs of misalignment, including cracked thrust blocks,
ovaling of the penstock, and cracks in the earth surrounding the penstock. Pipe
movement may also cause misalignment of bolted sleeve-type couplings. Coupling
misalignment can stress the gaskets, resulting in leakage.
3) Ovalization/Out-of-Roundness
Thin-walled penstocks are most susceptible to losing their shape and becoming out of
round. However, penstocks with an acceptable wall thickness also can lose their shape.
Some of the most common causes of penstock ovalization are listed below:
Dewatering is preferred for penstock interior inspection. Caution should be taken when
dewatering a penstock because several problems may occur. For instance, if the grout
curtain at the upstream end of the penstock is not completely effective or if the
penstock has excessive leakage, water pressure can build up behind a tunnel liner or
buried penstock. Water pressure on the outside of a buried penstock or tunnel liner
could become high enough to buckle the penstock after dewatering. If this condition is
a possibility, the penstock can be dewatered slowly to allow the external water pressure
to decrease before a problem develops. Another potential problem to be aware of is a
clogged vent line (or a closed valve on the vent line) at the upstream end of the
penstock. Excessive negative internal pressures could develop when attempting to
dewater, which may result in collapsing or buckling the penstock.
If dewatering is not economically or technically feasible, i.e., if the penstock was not
designed for this condition, a submersible remote operated vehicle (ROV) might offer
one feasible method of inspecting the interior. Use of remote-controlled video
equipment or penstock-inspecting robots is relatively new technology. These devices
can perform inspections rapidly and safely inside slippery, steeply inclined penstocks.
Internal paint, rust, and erosion conditions are monitored on an external cathode ray
tube (CRT) linked to a camera mounted on the inspection unit. However, use of an ROV
may not be as effective as performing a hands-on inspection after dewatering of the
penstock. An ROV inspection may be of limited use if turbidity of the water causes poor
visibility.
2) Linings
The penstock interior may be lined or unlined. A penstock lining will hide any defects or
cracks in the steel. Look for areas of distress in the lining, such as stretching or broken
areas, which could indicate further problems such as cracks in the base metal hidden
underneath the lining. The present condition of the lining is important to the longevity
of the penstock. Even small areas of pinhole leaks or degraded lining will allow water to
seep between the lining and the base metal, trapping moisture and increasing the rate
of corrosion. The presence of rust or stains indicates that the lining is not performing as
intended. The inside surfaces of the penstock should be examined to verify that the
original surface is smooth and that the lining, if present, is intact. The condition of the
inside surface or lining affects head loss. The lining should be examined to verify that it
is protecting the penstock structural material. A determination should be made if any
lining is missing or if the surface is rough or smooth. If operating conditions have
caused layers of deposits, like calcium carbonate, that have been allowed to remain in
place, a determination should be made as to whether such deposits are detrimental to
the base metal underneath.
3) Organic Growth
The interior surfaces of the penstock may have become fouled with organic growth over
a period of time, thus restricting water flow. Also, marine organisms such as freshwater
clams or zebra mussels can reduce hydraulic capacity of a penstock.
The degree of erosion and corrosion, as well as the condition of the lining, are
important. Erosion or cavitation inside the penstock can be caused by turbulent water
(typically occurring at discontinuities and bends), high velocity, or scouring damage
caused by abrasive material carried in the water (typically occurring along the penstock
invert). Mismatched surfaces at inside joints should be checked to verify their integrity.
Corrosion can occur on the inside of a penstock. Pinhole leaks may occur at any
location, although general corrosion and deep pitting is more likely to occur in relatively
horizontal penstock regions and in crevices. Also, look for rust streaks or discoloration
which may indicate penstock deterioration. The extent of wall thinning caused by
uniform corrosion and erosion may be difficult to measure visually, so further testing
may be necessary to determine the average wall thickness.
1) Coatings
Penstock coatings will hide any defects or cracks in the steel. Look for areas of
distress in the coating, such as stretching or broken areas, which could indicate further
problems such as cracks in the base metal hidden underneath the coating. The present
condition of the coating is important to the longevity of the penstock. Even small areas
of pinhole leaks or degraded coating will allow water to seep between the coating and
the base metal, trapping moisture and increasing the rate of corrosion. Small rust
blisters or stains could indicate small pinhole leaks caused by pitting, leakage past
rivets, etc. The coating should be examined to verify that it is protecting the penstock
structural material.
2) Corrosion
Corrosion can occur on the outside of a penstock. Pinhole leaks may occur at any
location, although general corrosion and deep pitting is more likely to occur in relatively
horizontal penstock regions and in crevices. Also look for rust streaks or discoloration
which may indicate penstock deterioration. The extent of wall thinning caused by
uniform corrosion may be difficult to measure visually, so further testing using
ultrasonic techniques may be necessary to determine the average wall thickness.
3) Localized Buckling
For buried or concrete-encased penstock sections, voids may be present in the backfill
or concrete. The external pressure from surrounding ground water in the area of these
voids can cause the penstock shell to partially collapse in the form of an inward bulge.
Voids in backfill are typically caused by ground-water erosion of the backfill material
near the invert of the penstock. Prolonged erosion of the backfill can undermine the
penstock foundation, leading to differential settlement and potential failure. This type of
defect can usually be detected by striking the penstock shell with a hammer at multiple
locations and listening for a hollow sound.
Voids in concrete are caused by poor consolidation of the fresh concrete during
concrete placement or by the trapping of excess water in the concrete "bleed water"
near the penstock invert. Typically, these type of voids are localized and relatively
small. However, voids large enough to cause damage to the penstock can occur. The
detection of voids in concrete is similar to the detection of voids in backfill.
5.3.5.3 Penstock Supports
1) Ring Girders
Ring girders, which are used to support long span elevated penstocks, are constructed
by welding steel plate rings to penstocks. All loads are transferred from the penstock to
the ring girder and support legs. The support legs are welded to the ring girder, then
attached to bearing plates. The bearing plates are attached to a concrete foundation.
Ring girders should be visually inspected for signs of deterioration and distortion.
Inspection of ring girders should also include the condition of the .coatings. The
potential for premature coating failure is greater at ring girders than at adjacent smooth
penstock surfaces because ring girder surfaces are irregular.
Often, ring girder supports must allow penstock movement caused by changes in
temperature. This movement is usually accommodated in bearings located under the
support legs. -Rocker, roller, and low friction slide bearings are commonly used for ring
girder support. The bearings should be inspected to verify their integrity. They should
be clean and well maintained to allow full penstock movement throughout the full range
of design temperatures. Clean, well maintained bearings will help minimize forces in the
penstock and anchorages.
2) Saddle Supports
Saddle supported penstocks typically span shorter distances between supports than ring
girder supported penstocks discussed above. Stress concentrations occur at the tip of
the saddle where "horn stresses" result in the penstock shell becoming unsupported.
Saddles are usually constructed from reinforced concrete and support the lower 120-
degree arc at the penstock invert. However, saddle supports may also be fabricated
from rolled steel plate. Sheet packing that may be lubricated with graphite can be used
as a cushion between the saddle support and the penstock. The sheet packing also
permits limited movement of the penstock relative to the support as a result of
temperature changes.
If required, the penstock shell at saddle supports is stiffened by welding steel rings to
the shell at each side of the saddle support.
Saddle support inspection should include a coating inspection and inspection for signs
of deterioration and high stress areas similar to ring girders. Localized buckling or
distortion can occur at the penstock's upper contact points with a saddle support. In
addition, the condition of the concrete saddles should be noted and investigated for any
signs of settlement or concrete deterioration. Inspection of the surfaces between the
saddle and the shell is difficult, but important, because significant corrosion may be
occurring in the contact area.
3) Anchor/Thrust Block
Unrestrained joints include expansion joints and bolted sleeve-type couplings. Typically,
unrestrained joints are not working if any water is leaking past the seal or if the joint is
seized. Look for leakage, cracked welds, base metal flaws, loose or missing bolts, and
heavily corroded areas. In unrestrained joints, scrape marks or unpainted surfaces may
be visible where the pipe has moved in relation to the follower ring.
5) Welded Joints
A representative portion of all structural welding performed on the inside and outside of
the penstock is visually examined for signs of rusting, pitting, or other structural
defects. For welded joints, look for cracked base metal or welds, surface flaws, etc.
Flaws in welds during construction can occur from high carbon content of the base
material, embrittlement of the heat affected zone, improper preheat, and improper rate
of cooling after welding. Typically, these problems are more likely to occur as the plate
becomes thicker or when the joint is made under adverse construction conditions
6) Stiffener Rings
Look for flawed welds, including undercut, base metal flaws, and heavily corroded
areas.
7) Penetrations
Penetrations would include items directly attached to the penstocks and exposed to the
internal pressure carried by the penstock. Some examples of penetrations are:
manhole, air vent connection, filling line connection, etc. Look for damaged or missing
parts, cracked welds, cracked or broken castings on valve bodies, broken or missing
bolts and rivets, heavy corrosion, and leakage from gasketed joints, packings, flanges,
couplings, and manholes. Check the surface of all penetrations for distortions, cracks,
and other defects, paying particular attention to the welds or riveting used for attaching
such parts and their reinforcement.
8) Drains
Penstock dewatering drains, located typically at low points along the penstock profile,
should be examined to verify that they are in working condition and are not leaking.
Valves that control these drains should be examined. Overtightened packing gland bolts
could lead to bolt failure and packing gland rupture. Also, the drains must safely
discharge water away from the penstock to prevent undermining of the penstock
foundation during dewatering.
Drainage systems for penstocks that are located in tunnels should be checked, if
possible, to verify proper operation. Drainage systems that are installed to relieve water
pressure against the penstock, thus protecting the penstock from possible collapse, can
become blocked over time. Blockage consisting of debris or waterborne minerals such
as rock fines or calcium can render the drains ineffective. The drains should be
maintained and cleaned on a regular basis.
9) Appurtenances
Standpipes and vent pipes are usually located at high points along the penstock
profile and immediately downstream from gates. They should provide unrestricted
air inlet or air release to the penstock. In cold climates, the pipes should be
inspected for ice blockage. Standpipes and vent pipes should be inspected regularly
to verify they have not become blocked.
2) Surge Tanks
Surge tanks are installed to limit pressure rise and fall in penstocks. Surge tanks are
fabricated of steel plate, wood, or reinforced concrete.
Surge tank assessment must consider the type of surge tank, condition of tank
coatings and linings, and tank mechanical appurtenances. Surge tanks often have
roofs and vents that can become blocked similar to standpipes. The condition of the
ladders, handrails, grating, and other surge tank access equipment should also be
noted.
3) Gates and Valves
Gates are normally provided to shut off water flow to the penstocks and are usually
located at the upstream end of the penstock. Penstock installations incorporate
many different types of gates to control flow into the penstock.
Because most gates are of steel construction, assessment techniques used for
inspection of steel penstocks may be appropriate. Inspectors should pay particular
attention to the condition of the coatings. Gate seals, which are often fabricated
from rubber but are also fabricated from alloy metals, tend to wear out. The
condition of the seals should be noted and the amount of leakage past the
emergency gates while in the closed position should be noted and documented.
Bypass, filling, and shutoff valves are often installed in penstocks for the purpose of
filling, dewatering, or redirecting flows. Butterfly, globe, and gate valves are typical
for bypass and shutoff applications. In addition to coating condition, assessment
should include the condition of the valve operators, packing glands, and moving and
stationary parts that may experience wear.
4) Piezometer Taps
Piezometer taps are typically located in the penstock several pipe diameters
upstream from the turbine and are used to measure flow. The taps, which are often
forged steel pipe couplings less than I inch in diameter, are welded through the
penstock shell; four taps located 90 degrees apart are common. The taps are often
equipped with petcocks or gate valves and are connected by copper tubing to a flow
measuring location in the powerhouse. Assessment should include verifying that the
piezometers are not blocked and that the taps, tubing, and valves are not leaking.
5) Air Valves
Air and vacuum release valve assemblies are installed along the penstock to vent air
to and from the penstock under service conditions and also during penstock filling
and draining. To permit isolation and servicing, air and vacuum relief valves are
normally equipped with a ball, gate, or butterfly shutoff valve. Malfunctioning of
these air valves could result in penstock rupture if, for example, they are installed to
mitigate transient pressures. Thus, assessment of air and vacuum release valve
assemblies must verify they are not plugged, restricted, or leaking, and that they are
operating properly and are in good working condition. In cold climates, the valves
should be protected from freezing. Where employed, heaters should be operational.
5.3.5.5 Vibration
Penstocks should be assessed for both flow-induced and equipment-induced
vibrations. Resonant vibrations can cause material fatigue and may cause penstock
problems if not corrected. The penstock should be inspected while operational, and
operators or maintenance personnel should document abnormal vibration. If excessive
vibration appears to exist, instrumentation should be used to record vibration frequency
and relative amplitude.
The inspector should note the type and location of penstock joints and any noticeable
misalignments. Span distances and ground elevations between penstock supports
should be checked and compared with the as-built drawings. Frequently, joint leakage,
distortion, or misalignment can indicate other problems that might require further field
and analytical evaluation.
The following NDE techniques may be used to evaluate discontinuities in the base
material or welded joints of the penstock shell and its various components:
Any guidelines including the present one are to be taken as a dynamic process and
should be updated periodically as new O & M procedures and technologies are
developed and employed. The present guidelines has been formulated in an easily
understandable manner to help the operation and maintenance crews based on
collection and compilation of related information about O & M management and
technologies, which have been formulated by the developed utilities in many years.
The source of information is vast; hence, the process of making the guidelines
should not stop here but continue in future as well.
Note: Check lists given above are for starting of the machine after long shutdown. If
the starting of the machine is to be done after a short shutdown, certain checklists such
as position of stop log gates, AVR condition, IR values, Jack position, earth link for bus
duct, IR of winding and core, BDV of oil are not required. This applies for Black Start
as well, but black start is done without relying on external transmission network (i.e.,
using Diesel Generator or other power source). This aspect is dealt in the NEA Grid
Code.
The following are the activities to be carried out for operation of the hydropower plants
after the general check-up as mentioned above:
For intake gate opening, check intake gate power supply and hoisting system,
give raising command and check gate position in raised condition.
For Inlet Valve Opening, put oil pumps on ‘auto’ mode, open bye-pass valve
manually or give opening command to by-pass auto valve, check water pressure
on spiral side, and then give opening command to inlet valve on equalized
pressure.
For turbine operation, put oil pumps on ‘auto’ mode to maintain required
pressure in pressure accumulator, check availability of Nitrogen cylinder and
check also pressure of the same for systems using compresses nitrogen, check
air pressure for maintaining proper oil level in pressure accumulator (if provided),
open cooling water for bearings, open shaft seal water, put brake on ‘auto’
mode, unlock guide vane lock, fix GV (Governor) opening limit, and put machine
on ‘auto’ mode.
For generator operation, select AVR Auto/Manual mode as required, keep
firefighting system operative (where provided), switch on DC supply for
excitation flashing, at 30% of generator voltage DC supply from battery cuts off,
at 90% speed switch on generator excitation (if not on auto), start machine on
‘Auto’ or ‘Manual’ mode as required.
For synchronization, check grid voltage and frequency, check generator voltage
and frequency, reduce or increase generator voltage & frequency to match with
line voltage & frequency, put synchroscope in ‘ON’ position. Needle will start
moving and lamps will start glowing. Needle on 12o clock position and lamps on
dark position indicate that voltages and frequencies of grid and generator
respectively are matching, at equal grid & generator voltage and frequency,
close generator breaker, now generator is synchronized with grid, and then take
minimum prescribed load immediately.
For checks after synchronizing and taking load, unit control board supply is
changed to Unit Auxiliary Transformers, Change excitation from “manual” to
‘Auto mode, transformer “Motor for cooling water supply” started, all parameters
in control room are matching and correct, and general checkup for machine and
other unit auxiliaries at all floors.
Following are the checks to be carried out at the “Time of Shift Change Over (Machine
Running on Load)”:
General: Check lighting, ventilation and air conditioning, check water levels in Forebay
& Tailrace channel, check availability of discharge, check communication systems, check
instructions and status of various equipment and work permit/shut downs/ breakdowns,
check general cleanliness of the area, equipment and control panel etc., check all
indication lamps are glowing, check with test push button that all fault indication lamps
are ok, physical check of all sub-distribution boards installed in the Power Station, check
all inlet exhaust fans are working, check all batteries are physically in good condition
and check battery chargers are in normal working conditions. Check operation of all the
installed instrumentations whether they are functioning correctly or not.
Turbine and Generator: Check temperature of thrust bearing, upper guide bearing
and lower guide bearing, check in normal working condition of cooling water flow and
pressure of all bearings at inlet & outlet, sealing water flow and pressure top cover
drainage system, stator cooling water flow & pressure and grease pump; check oil level
in housings of all bearings, check if there is vibration or abnormal sound in OPU pumps
and check grease in the container of centralized grease lubrication system; check
working of OPU pump 1 & 2, OLU pump, drainage pump & dewatering pumps, governor
compressor, general – purpose compressor, and cooling water strainers; check running
& vibration of machine and ensure nothing is abnormal, check water, oil and air flow
indicators, and check the physical appearance of various system such as manholes,
valves, indicators, etc.
Generator, AVR & Excitation System: Watch running & vibration of machine and
ensure nothing is abnormal, check for any sparking from the brush of slip ring, check
temperatures of winding and core (ensure that these are within limit), check that all
instruments and indicators mounted on unit control board, governor panel and AVR &
excitation panel are in ok condition, check for any abnormality, sound chattering in
busduct, and neutral cubical.
Control Room: Check that all parameters indicated on various panels are matching, all
indicating lamps are glowing (also check annunciations are ok), check movement of all
pointers & reset them, check all instruments mounted on panels are in working order,
check all relays are reset, check rear of all panels and mounting on this side for OK
condition, check emergency lighting system is ok, check position of circuit breakers for
outgoing lines, and check grid voltage & frequency.
L.T. Room: Check all indication lamps are glowing, have general look on instruments
and relays mounted on board, check various switches are in correct position, and check
whether supply to various distribution boards are ok.
Main Transformer: See that oil level in conservator is OK and there is no leakage
from anywhere, check that oil pressure and water pressure are normal, check that oil
temperature and winding temperature are normal, check silica gel colour is normal, see
that oil and water flow indicators are normal, carry out checks of compressor and power
for healthy condition of Multi-type System (wherever applicable).
Switchyard: Have general look at switchyard including bus bars, jumpers etc. Ensure
that there is no sparking anywhere and everything is in order, check compressed air
system in case of ABCB is ok (if provided), check SF6 gas pressure in case of SF6
breakers and check position of all breakers, isolators & line isolator and cast a look on
all CTs, PTs, LAS, surge counters, wave traps and coupling capacitors, reactors and
capacitors and ensure that everything is in order.
Following are the routine maintenance to be carried out during each shift:
Note that inspection and observation carried out during each shift shall be logged daily
in control room log book. Also check the speed of the turbine which is displayed by
ratemeter and tachometer generally.
To provide a black start, some power stations have small diesel generators, normally
called the black start diesel generator(BSDG), which can be used to start larger
generators (of several megawatts capacity), which in turn can be used to start the main
power station generators.
Total System Black Out: The system is said to be under total black out when
all Regional utility generation has ceased to operate and there is no supply from
external interconnections to the Western grid and it is not possible for the total system
to function again without black start.
System islands: In case, part of the system is separated from the grid due to
system splitting or through defense schemes and operates independently, it is called
System Islanding.
A noticeable longitudinal crack was seen in the centre of the crest parallel to the
dam axis nearly along the whole dam crest. Opening of this crack was variable.
It had maximum width of about 15 cm in the middle and was narrowing
towards both the abutments;
In addition to continuous crack in the centre of the crest longitudinal cracks
were also seen on both the upstream and downstream shoulders of the dam
crest. However, opening of the cracks on the upstream shoulder was greater
(maximum about 15 cm) than that of the cracks on the downstream shoulder
(maximum about 5 cm); and
Leakage water gauge was showing that the leakage quantity was decreasing
from 55.79 l/sec at reservoir level 1530.074 m (on Nov. 9, 1983) to 48.9 l/s at
reservoir level 1529.076 (on Dec. 29, 1983), and the leakage water was
completely clear.
i) The longitudinal cracks must have been resulted from differential settlement of
different material zones of the dam body; and
ii) Clear leakage water is the indication of the absence of transverse cracks in the core,
thus, the cracks were considered to be not dangerous. However the team suggested
the following:
Later on, an international expert (Mr. I. L. Pinkerton), who had provided his services an
independent expert at several stages of construction of this dam was invited. During his
visit to the site, a trench of about 3 m depth was opened on the dam crest to examine
the crack.
It was found that at this depth the crack was bifurcating and was slightly dipping
towards upstream. However, the opening width of the crack was decreasing quickly
with increment in the depth. According to suggestion made by Mr. Pinkerton the cracks
in the core were filled with betonite and since then the dam has no problem in this
regard. Nearly same time, noticeable cracks and signs of movement were seen on the
hill slope behind the intake gate control shaft. A possible landslide at this place could
block the intake and endanger the safety of the dam as well. Japanese specialist from
Nippon Koei also visited the site. The following remedial works were carried out
according to the suggestions made by Mr. Pinkerton and the Japanese experts:
Sliding mass located just behind the intake gate shaft was provided with suitable
anchoring into the bedrock.
After treatment of this landslide, monitoring was carried out several years, which
indicated that the above mentioned measures were appropriate. A sloping intake as
well had to be constructed under KDPP (Kulekhani Disaster Prevention Project) at the
side of the Kulekhani-I Dam due to the reason that there was possibility of
encroachment of the existing intake by increased sedimentation caused after the
rainstorm of 1993 July. The sloping intake constructed was virtually an inclined shaft
structure with full opening which shall be closed by concrete stop logs one by one from
the bottom depending on the actual sediment surface elevation around the intake. The
Mandu head pond and intake structure of Kulekhani-II HPP that was also completely
destroyed by the debris flow containing numerous boulders occurred during the same
flood event. For Kulekhani-II operating in tandem with Kulekhani-I, besides covering
the destroyed headpond of Mandu intake with concrete structure, monitoring of the size
of riverbed of Khani Khola was initiated in order to take up the counter measures in a
timely manner against (i) closure of the tailrace outlet due to rising of the river bed,
and (ii) inundation of the Kulekhani-II power station and switchyard by flood from the
water level rise due to rising of the river bed. For existing dam as described above the
maintenance/remedial measures are taken case by case based on events occurred
rather than scheduled type maintenance, while for the weirs/ headworks of the run-of-
river type hydropower plants, the scheduled maintenance works relevant particularly for
the Nepalese context being performed consist of the following:
It is to be noted here that in the 6.2 MW Puwa Khola Hydropower Plant there is not
only a threat to the penstock alignment especially during rainy season, but also the
water leakage due to crack development at the head tank/forebay due to fragile
geology in the vicinity. In such case, the penstock alignment must be always under
close watch along with all possible measure with crack filling, repair works with high
strength concrete in the head tank/forebay, improving the penstock support blocks,
constructing saddle supports, etc. such problems, however, require a thorough
geological investigation.
6.3.1.3 Powerhouse Structures
The major items to be attended and necessary repair works undertaken during
maintenance of powerhouse structures are leakages, river and slide protection works in
the vicinity and regular painting of powerhouse building.
6.3.1.4 Tailrace
The tailrace is usually lined with concrete for a short distance, to a point where
the greatest turbulence has subsided. Up to this point, maintenance is usually very
light, but thereafter, in the original river bed, some minor trouble may be expected.
The tailrace lining usually consists of a base slab and concrete retaining walls.
The tops of the retaining walls should be sloped to avoid any standing puddles, which
may result in crazing. Adequate weep holes are necessary and should be extended a
few inches from the face of the wall to avoid unsightly staining.
Screens may be provided in the tailrace to prevent fish or any other animals
swimming into the machines, in which case efficient tackle is necessary for lifting the
screens for periodic cleaning. Though the tailrace screens are covered by the intake
screens, it is surprising how much trash reaches them. It is every bit as important to
keep tailrace screens clean as it is to maintain free passage through the intake screens.
Owing to fluctuating load on the turbines, conditions downstream are not as they
were in nature. The greater floods may have been abolished or much reduced by the
reservoir (if the plant is with the reservoir), but the equivalent of a minor flood occurs
each time load is taken up quickly by the power station; so that these minor floods are
frequent and have an unnaturally rapid rise and fall, which may easily lead to scouring
of the river bed and banks to an objectionable degree and for surprisingly long distance
downstream of the station.
The following daily, weekly, monthly, annual and five yearly inspection checks are to be
done for the routine maintenance of hydro-turbines & auxiliaries.
After successful running of plant for about one year, few weeks are required to
be allocated to inspect rotating parts, control equipment and measuring instruments,
etc. and analyse cause of change in the performance characteristics (if any).
Modify/repair/replace, whenever required, the worn out parts in order to prevent forced
outage of machine at later date.
After every five years it is necessary to inspect / check the machine more
critically for Abnormalities like fatigue defects for excessive wear and tear of some parts
or any change in Original parameters/clearances, etc. This exercise becomes very
essential in cases where Performance level has been observed to have gone down in
five years of operation.
Capital Maintenance
Capital maintenance or overhauling of hydro-turbine set is usually done after
about 10 years of operation or as and when necessary. During this maintenance, the
whole unit is to be stripped off and all the defective/worn out parts/ components
repaired/ replaced with new ones. Then the unit is re-commissioned as per originally
established commission practice of the power plant. After capital maintenance, the units
are subjected to all the periodic maintenance outlined in above sections before it
reaches the next cycle of capital maintenance. Following checks are to be exercised
during capital maintenance of hydro turbine set.
Erosion
The damages in runners, chambers, guide vanes and other underwater parts
have assumed serious proportions especially in the Nepalese context due to
predominance of run-of-river hydropower plants in the Nepal Power System. The rivers
of Nepal carry enormous silt loads particularly during summer monsoon so much, so
that the power stations had to be closed down to prevent serious damage to the
turbine parts and the water conveyance system. Even with greater attention being paid
to desilting arrangements, heavy damages have been observed on the runner, labyrinth
seals, guide vanes, inlet valves, shaft seals and draft tube cone. The wear due to silt
occurs so fast that the unit has to be taken out for reconditioning every few years. The
remedy appears to lie in effective desilting arrangements and manufacturing of turbine
parts with harder and erosion resistant materials like stainless steel of proper grade. In
the Chilime hydropower plant (22.1 MW), even in the peaking pondage reservoir in the
water conveyance system enroute to powerhouse, sediments used to be trapped. The
annually removed sediment from the pondage reservoir amounted in the range from
10,000 to 12,000 m3 per year.
Two types of shaft gland seals (i) carbon or ferrobestos segment (ii) Rubber flap
are generally in use. The maintenance of rubber flap type gland seal is simpler and
easier over the carbon or ferrobestos segment. Only the precaution to be taken during
assembly of rubber gland is to see that the jointing of the rubber seal is done in the
proper way. It is, however, to be noted that the quality of rubber used plays a very
important role for satisfactory performance of the rubber gland. The shaft sleeve should
also be checked, it should be circular and smooth and properly secured on the shaft. In
case of carbon or ferrobestos segment type of shaft gland seals, the seal segments are
housed in stuffing box, which being always in touch with the shaft is subjected to
excessive wear and tear. The overhauling of the staffing box becomes necessary when
it is observed that consumption of cooling water has considerably increased or
excessive water in top cover appears to be coming. Normally the maintenance of this
type of seals is required to be done annually. In the event of breakage or damage to a
carbon segment, it is advisable to replace the whole set of carbon segments. In very
rare case only, the damaged segment is replaced. Whenever reassembly of the gland
seal with existing gland ring or new ring is done it is important to ensure:
All carbon/ferrobestos segments are carefully examined for any chipping or
damage.
All stainless steel facings are flat and square with the gland sleeve and there are
no steps at the facing joints.’
Stainless steel facing and sleeve are completely free from grease.
Ensure proper bedding of segments with shaft sleeve.
All segment to segment and segment to stainless steel mating surfaces are
perfect.
All garter springs are assembled to obtain even tension all around.
Alignment of segments in the lower assembly is carefully checked with a hard
Wooden peg or similar device before fitting retaining pins.
In the guide vane servomotor, main source of trouble is rubber cup seals, which
need to be replaced after a few years. Normally rubber seals are replaced during capital
maintenance. It is important that all the parts are match marked before dismantling so
that reassembly is correctly done.
Governor
Governors are of four types (i) mechanical (ii) governor employing magnetic
amplifier (iii) governor employing electro-hydraulic amplifier, and (iv) digital governor.
The digital type of zthe governor is maintenance free and fast response modern day
governor, while the other three types of governor may require maintenance because of
the following reasons:
Chocking of oil parts and throttles.
Wearing out of throttles due to which oil leakage becomes more and
readjustment of governor becomes essential. In this case, governor should be
opened and all the throttles, etc. should be cleaned. Filters also should be
cleaned, and after cleaning and reassembly, governor parameters and
characteristics should be readjusted so that there is no hunting of the governor.
The normal problem, which had been faced in different hydropower stations, is
entry of water in the governing oil system particularly from top cover through oil
leakage pumps which caters leakage of servomotor oil. Its sump being located well
below the level of servomotors in the top cover may not be properly sealed, thus
providing access to the top cover water which may ultimately delivered to the OPU
sump. To eliminate this problem the oil leakage unit delivery should be isolated from
the OPU sump and connected to a separate tank.
The oil sump should be properly cleaned and filled with filtered oil. The oil
samples should be got tested for verification of the desired properties. Regular
centrifuging of oil with the help of De-Laval type oil purifying machine would go a long
way in enhancing the life of the oil. In certain case, oil retained its properties even up
to 15 to 20 years of continuous use. During annual overhauling, the OPU sump and
pressure accumulator should be completely emptied and cleaned. The strainers should
be inspected and repaired, if necessary. The OPU pumps require maintenance when
they develop excessive noise or vibration. This may be due to some worn out bearing,
screw/impeller and body of the pump, which would be replaced. Sometime oil level in
sump is found decreased which may be due to system leakage in the system. This
requires to be attended.
Hourly maintenance check is done to keep the temperature record on log sheet for core
and winding, hot and cold air of the stator. Similarly, the temperature of Thrust Bearing pad
and oil as well as the same of Guide Bearings are measured by RTD & TSD and recorded on log
sheets. The checking of the temperature of cold & hot water of oil pipeline / external oil cooling
system is also done on hourly basis to keep record on log.
1 Slip ring/ Brush i. spring tension i. Use a precision spring balance for
Rocker ii. Check pitting and adjusting spring tension. The carbon
grooving slip ring. brushes can be used till it is not
iii. Check carbon brushes possible to measure / adjust spring
for absence of pitting and tension.
severe wear and tear. ii. In case of excessive grooving
rectify by grinding.
iii. In case the damage is excessive,
replace complete set.
2 Guide Bearings Analysis of oil from oil bath Record to be kept
3 General Check connections of
current carrying leads &
cables. Tighten the bolts, if
required after removing
the insulation.
Capital Maintenance
5 Fan motors Check IR value of motor Dry out, if found low. Check balancing of
winding, noise and vibration of fans.
fans
6 Tanks and Check painting and surface Replace any component found
accessories finish damaged.
Mechanical inspection of all Touch up/repaint, if required
accessories
7 Gasket joints Check the tightness of bolts. Tighten the bolts evenly to avoid uneven
pressure
8 Earth resistance Check earthing resistance Take suitable action, if earth resistance
is high.
9 OLTC Diverter switch servicing Draw out diverter clean & tighten
Check the contact of diverter contacts.
switch for burning or pitting Recondition/ replace, if required.
marks
10 Bushing top Check contact joints. Adjust arcing horn gap & retighten
connectors and Clean arcing horns and check
arcing horns gap
Where transformer windings are to be taken out due to any reason such as to repair a damage, thorough
washing due to sludge formation or for thorough inspection to locate a fault as a result of DGA or some
other tests, after carrying out the necessary works for which the transformer was opened, do the
following also:
Tighten all coil clamping screws to remove looseness from the windings, if any;
Tighten all nuts and bolts whether metallic or made if insulating material on mechanical and electrical
joints;
Tighten core yoke bolts, core-clamping screws, etc.
I. 20 Yearly
1 Life assessment DP and Furan content Under the normal operating condition
tests measurement transformer has a useful life of about
2530 years. This may vary considerably
depending upon the overloads it has
carried and the temperature at which it
has worked during its span of operation.
Therefore, for any future planning it
may be worthwhile to know well in
advance the remnant life of the
transformer in service. This can be done
by assessing extent of degradation of
cellulosic paper through furan content in
transformer oil or/and degree of
polymerization (DP) of paper. It is
proposed to carry out this study after a
period of 20 years of service. After
knowing the remnant life of a
transformer, the action can be planned
in conjunction with life assessment
studies on generating unit.
Besides, the partial and complete services as follows are recommended for
transformers.
Spherical Valves: Spherical valves have a body shaped like hollow sphere with flanges
or other connection for mounting in a piping system. The rotor (shaped like ball) has a
cylindrical hole through its centre at right angles to support shafts located on each side
of valve. In open position with rotor opening parallel to the flow direction, the valve
offers and unrestricted flow with minimum disturbance to the flow path. To close the
valve, the valve rotor is turned to 90o from the axis of rotor opening. Spherical valve
has tendency to close for positions less than 50% opening which facilitates under
emergency closing. Movable seals reduce valve leakage when the valve is closed.
Mostly the valves have both upstream and downstream seal. The upstream seal is
maintenance seal or emergency seal, the downstream seal is working seal. When valve
is closed under full pressure, the upstream maintenance seal allows replacement or
maintenance of the working seal without dewatering the penstock. The upstream
maintenance seals have positive mechanical locking to prevent accidental opening. The
maintenance procedures and frequencies for these valves are as follows:
Daily checks of operating system and remedial measures are must;
Annual inspection and overhauling of mechanical seal after dewatering
penstock is must;
Annual inspection and overhauling of operating seal is also essential; Annual
overhauling of operating mechanism to ensure smooth working throughout the
year is also done;
Annual overhauling of the valve rotor and other parts are also taken up as
required.
The following checks and attending are also essential during annual maintenance:
In order to ensure all structures and equipment are operated and maintained in
a safe and efficient manner, planning and management of manpower needs to be done
well in advance preferably during the pre-commissioning of the plant. The manpower
required will be based on following factors:
Type of plant.
Number of shifts.
Location of the plant.
RoR type of plant demands more manpower than for dam type because of the spread
of hydraulic structures. Similarly, if the numbers of shifts are more there will be more
need of manpower. For remotely located plant there may be a need of additional staff
for the support services such as transport, maintenance of residences, drinking water
supply, etc. However, the manpower can be kept minimum by employing a
multidisciplinary force such as an engineer with experience in civil and electro-
mechanical work or technician with driving experience and by employing local labor
during requirement of additional work. The guiding factor is safety of equipment and
manpower. Similarly, the contractual work such as civil maintenance, welding and
fabrication, etc. may be awarded on annual basis to keep work force low.
In selecting manpower e.g. for a position of plant in-charge or plant manager a person
having basic degree in electrical with experience in civil and mechanical works is most
suitable while for testing engineer, he/she should be familiar with all equipment testing
to take decision in case of any fault on electrical equipment such as generator,
transformer and switchgear. For the technician, a technician level certificate holder with
hands on experience in electro-mechanical work such as diesel generating (DG) plant,
electrical installation, hydraulic equipment, electrical panel, PLC panels, cable work, etc.
Keeping n view that the private hydropower plants will be handed over to the GoN after
a designated period of Operation and Maintenance of the plant, the GoN staff to be
deployed for O & M need to be trained at least for a duration of one year before the
end of License Period.
The plant manager may authorize training exemptions based on assessment of the
individual’s experience (Note that the exemptions must be documented). Annual
training (continuing type) to ensure the staff is proficient in the knowledge and skills
needed to perform their duties. Training must be provided sooner if there is a change in
job assignments, change to systems or processes, or a change in procedures. The
remedial type of training must be provided when there is a reason to suspect
deficiencies or inadequacies in the employee’s knowledge or skills.
On-the-job: The primary mode of training for the facility is through on-the-job
training. Training must be carefully supervised and controlled to avoid mistakes.
Instructor-led: Classroom or in the field.
Computer–based: Online or other.
Required Reading: Assignments require signatures by the employee to indicate that
they have read and understood the document.
The knowledge and skills should be evaluated and the assessment methods must be
documented. The training program needs to be reviewed annually and
recommendations are to be made for any changes or improvements.
For effective maintenance, it is necessary to list out all required ordinary and
special tools, spare parts, consumables and testing equipment along with assessment of
the quantity and arrange the same in a timely manner in advance so that time is not
lost in re-commissioning the plant after the shutdown. Ordinary tools and parts include
different type and sizes of screw drivers, pliers, spanners, hammers, etc., while the
special type of devices and parts is required during assembly or dismantling of
machines. For example, rotor lifting device and endless slings, pole turning device, shaft
lifting device, rotating device and slings for alignment, shaft extension pieces and so on.
These are not required for day to day maintenance; as such these should be properly
stored and secured. Necessary maintenance, if required, must be carried out on these
devices in time. Slings should be stored duly coated with preservatives as
recommended by the manufacturers.
6.5.1 Logging
A station log needs to be maintained at each facility in the Control Room. The
station log contains chronological record of all operating and maintenance activities and
events which provides a reference for future use. Operation and maintenance personnel
use these information to evaluate present and past plant status. The station log may be
paper, electronic or a combination of both. The station log documents are following:
Staff on duty
Operations of waterway equipment including gates, valves and changes to
spillway gate positions.
Communications involving plant operations, switching, Hot Line Orders,
clearances, special conditions, alarms and relay operations. All communications
with Transmission Operators shall also be logged.
Water elevations and releases and operational changes affecting water
elevations and releases.
Status of auxiliary equipment.
Testing of equipment or gate controls.
Act of vandalism or other security incidents.
Requests and occurrence to change from normal operation during an emergency
or unusual conditions
Communication network checks and emergency exercises conducted.
The disabling and re-enabling of facility alarms.
Unit start and stop times.
Any equipment failures and malfunctions.
Line outages.
Breaker opening and closing.
Callouts.
Any change in unit status (available, unavailable, etc.)
Status of all major equipment.
Listing of personnel (visitors) arrival and departure.
The plant manager must review and initial the operating Log Book.
Shift turnover is critical part of the facility’s operation and provides oncoming operation
staff with an accurate picture of the overall status of the facility. Hence, the incoming
operation staff must review logs, turnover checklist (if used), SCADA displays, alarm
displays, disabled alarms, protective devices, and computer pages, and they must
receive verbal briefing from the on-duty operator prior to assuming responsibility for the
operation of the facility. A visual inspection of control boards including a test of the
annunciator windows will be completed to verify indication/annunciation light is
operational. During a shift turnover, at a minimum, the information on major equipment
status, alarm status, work in progress, hazardous energy control procedures, any
abnormal plant conditions, water release, power schedules and work schedule should
be exchanged. The operation staff, then, will sign into the log documenting that shift
turnover has been completed.
6.5.2 Reporting
With the passing of time along with growth of demand in electricity and due to
advancement in the technical development the interconnected power system are
becoming more and more complex. This requires increased emphasis on the analysis of
system performance to ensure achievement of the best reliability. One of the most
important requisites for such analysis is the availability of clear, concise and the
accurate reports on power system operation and maintenance (O & M) for review by
management at various levels. Specific details regarding preparation, issuance, and
distribution of the monthly O & M reports is described in the following paragraph.
A narrative report of power plant O & M activities shall be prepared and distributed
monthly by the power plant O & M office on each project that includes operating power
facilities. The report shall briefly describe all important non-routine events of a power
plant O & M nature that occurred during the month, such as date, time, duration of
major items of maintenance undertaken or accomplished new equipment or service
installation or connections, changes in system arrangement or interconnections with
adjacent utilities, major power interchanges between systems or water movements
scheduled or accomplished, new facility(ies) added, important personnel activities, etc.
The report shall be distributed to the concerned as specified by the system operating
authority/ regulating authority as applicable.
In addition to the above indicated monthly O & M report the following reporting are
required for record keeping for future reference.
In case any accident occurs, the accident hazard notice needs to be given as
earliest as possible to the chief electricity inspector appointed by GoN.
The labels are placed on, or as near as practical to, the controls or equipment being
labelled. Labels are oriented so that they are easy to read. The operation manager
should be responsible for ensuring that missing or damaged labels, once identified, are
promptly replaced and that newly installed equipment or new modifications to existing
equipment are properly labelled.
6.7 A Typical Format for Spare Parts List / Monthly Report of Power
Plant Operation and Maintenance / Typical Formats for Reporting
I) TYPICAL FORMAT FOR SPARE PARTS LIST
II) FORMAT FOR MONTHLY REPORT OF POWER PLANT OPERATION AND MAINTENANCE
III) ANNUAL OUTAGE PROGRAM
1
= 5500(0.94 − 1)
= 351 KW
= (351*56.9) Btu/min
=19972 Btu/min
Where,
P = Power of Generator
19972
=(0.071∗0.24∗50)*1.5
= 35161 cmf
Where
As per the Structure of the power house it will be better to use intake and
exhaust fan system for the ventilation. As the air flow required is 35161 cmf per unit it
is better to use standard duty belt drive fan. Following are the details of fan.