Studi VE: Value Standard, Body of Knowledge SAVE-International 2007
Studi VE: Value Standard, Body of Knowledge SAVE-International 2007
Aktivitas
pra -studi
Hasil
Fase Informasi Fase analise fungsi Fase kreativitas Fase evaluasi
Ok ?
ya
Hasil tidak
Ok ?
Fase -fase Studi
Nilai
ya Fase Aktivitas tindak
pelaksanan lanjut/berikutnya
Aktivitas
Created by : Dr. Mohammed Ali tambahan
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
Konsep utama metodologi VE terletak pada
nilai, fungsi dan biaya.
Value Standard, SAVE 2007
Penerapan VE pada
tahap konsep dan
persiapan proyek
memberikan potensi
efektifitas pembiayaan
proyek yang optimum
dan akan
menghasilkan nilai
terbaik bagi sebuah
proyek.
Member
VE WORKSHOP
Duration
Created by : Dr.PACT
COLLECT Mohammed
ONLY Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
INFORMATION PHASE
Created byIN
GARBAGE – CARBAGE
: Dr. MohammedOUT
Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
INFORMATION PHASE
Created
AREby YOU
: Dr. Mohammed
SURE ? Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
INFORMATION PHASE
Created
PLEACE CHECK FOR by : Dr. MohammedOF
COMPLETENESS Ali INFORMATION
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
2.0 FUNCTION PHASE
SI Function
NO. Component / Process Basic / Secondary
Verb Noun
WHAT
Created DOES
by : Dr. IT DO ? Ali
Mohammed
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
SI Function
NO. Component / Process Basic / Secondary
Verb Noun
WHAT
Created DOES
by : Dr. IT DO ? Ali
Mohammed
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
2.2. Higher other Function 2.3 Lower irder Function
Function that
happen “All the Time”
Critical Path
Function
Unwanted
Secondary
Funcions
SCOPE OF VE STUDY
FUNCTION IS A TOOL
Created by : Dr.FOR COMMUNICATION
Mohammed Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
FUNCTION PHASE
A. Suspend Judgement
B. Quantity breeds quality
C. Free wheel
D. Cross fertilise
3.1 FUNCTION TO BE PERFORMED
IDEAS :
FUNCTION TO BE PERFORMED
IDEAS :
ARE YOU
Created by KILLING AN IDEAS
: Dr. Mohammed Ali ?
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
CREATIVE PHASE
FUNCTION TO BE PERFORMED
IDEAS :
EVERYTHING
Created byBEGINS WITH ANAli
: Dr. Mohammed IDEAS ?
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
4.0 EVALUATION PHASE
4.1 DENTIFY CRITERIA FOR SELECTION
IDENTITY CRITERIA SCORE RANK
A
Created by : Dr.UNBIASED
REMAIN Mohammed Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
4.2 LISTING OF ADVANTAGES & DIS ADVANTADE
Created
NOW IS THEbyTIME
: Dr. Mohammed Ali
FOR JUDGEMENT
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
SI No. Proposal Advantage Disadvantage
CreatedARE
by : Dr.
YOU Mohammed
FAIR ? Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
4.3 DECISION MATRIX
5 POINT SCALE
EXCELLENT = 5
VERY GOOD = 4
GOOD = 3
FAIR = 2
POOR = 1
WEIGHTAGE A B C D E F G H I J
PROPOSA TOTAL
FOR
L SCORE
CRITERIA
Created BE
by :OBJECTIVE
Dr. Mohammed Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
4.4 MIDCOURSE CORRECTION
DATES
DISCUSSED WITH
Created
SEEK by : Dr. FROM
OPINION Mohammed Ali
EXPERTS
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
5.0 RECOMMENDATION PHASE
5.1. RECOMMENDATION
Created by : Dr.IFMohammed
SEEK HELP Ali
NECESSARY
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
SAVING AND CALCULATION
Created BE
by :THOROUGH
Dr. Mohammed Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
SAVING AND CALCULATION
Created by : Dr.CALCULATIONS
CHCK YOUR Mohammed Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
5.3. LIFE CYCLE COST ANALYSIS
PROPOSALS
Present
Rs. Lakh I II III
Rs. Lakhs Rs. Lakhs Rs. Lakhs
I. INITIAL
1) Design Cost
2) Purchase Cost
3) Construction Cost
4) Installation or Commissioning Cost
5) Other Cost (if any)
………………….
…………………
………………….
TOTAL INITIAL COST …
Created byYOUR
VALIDATE : Dr. Mohammed Ali
ASSUMPTIONS
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
5.3. LIFE CYCLE COST ANALYSIS
PROPOSALS
Present
Rs. Lakh I II III
Rs. Lakhs Rs. Lakhs Rs. Lakhs
Saving
R.O.I. = ----------------- * 10
Initial Cost
Initial Cost
Payback = --------------------
Saving
Period
(in year)
Created BE
by :OBJECTIVE
Dr. Mohammed Ali
Berawi M.Eng.Sc.Ph.D, Dr. Ir.
6.0. RECOMMENDATION WITH IMPLEMENTATION PLAN
SI Actions to be Person /
Recommandations Completion date Remarks
No. taken Agentcy
Project Title :
Savings :