C - 6 Crane & Lifting Equipment Standart

This document outlines an emergency rescue plan and checklist for crane and lifting equipment. It includes procedures for recovering persons in an emergency and lists required equipment and resources. Tasks and responsibilities are assigned to specific personnel. A risk assessment and additional supporting information must be attached. The plan also includes a close-out checklist to ensure the work area is tidy and safe, equipment is ready for service, and supervisors are notified upon completion.

Uploaded by

wawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
238 views4 pages

C - 6 Crane & Lifting Equipment Standart

This document outlines an emergency rescue plan and checklist for crane and lifting equipment. It includes procedures for recovering persons in an emergency and lists required equipment and resources. Tasks and responsibilities are assigned to specific personnel. A risk assessment and additional supporting information must be attached. The plan also includes a close-out checklist to ensure the work area is tidy and safe, equipment is ready for service, and supervisors are notified upon completion.

Uploaded by

wawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

C - 6 Crane & Lifting Equipment Standart

EMERGENCY RESCUE PLAN IOC FORM C6-04, REV. 1.0


In the event of an emergency incident ( IF SECTION 10 IS APPLICABLE ) the following procedure is
to be followed
● Recovery of persons

Task
Person(s) in charge of job
Person Assigned to Task
Response/Rescue Method
How

Who
Equipment
Comunications Used
Resources

ATTACH A RISK ASSESSMENT AND ANY OTHER ADDITIONAL INFORMATION TO SUPPORT


THE RESCUE PLAN
EMERGENCY RESCUE/PLAN CHECKLIST
LOCATION EQUIP
ITEM DESCRIPTION REQUIRED
OF EQUIP CHECKED
1 WORKING AT HEIGHTS □ Yes □ No □ Yes □ No
2 TRAINED AND APPOINTED PERSONNEL □ Yes □ No □ Yes □ No
3 RISK ASSESSMENT □ Yes □ No □ Yes □ No
4 RESCUE PLAN COMPLETED AND □ Yes □ No □ Yes □ No
UNDERSTOOD
5 PERSONAL PROTECTION EQUIPMENT □ Yes □ No □ Yes □ No
6 FIRST AID KIT □ Yes □ No □ Yes □ No
7 COMUNICATION □ Yes □ No □ Yes □ No
8 BREATHING APPARATUS □ Yes □ No □ Yes □ No
9 LIFT GUARD 10 MINUTE OXYGEN PACK □ Yes □ No □ Yes □ No
10 RESUSCITATOR UNIT □ Yes □ No □ Yes □ No
11 RELEVANT SAFE WORK PROCEDURES □ Yes □ No □ Yes □ No
Other equipment
available
C - 6 Crane & Lifting Equipment Standard

CLOSE-OUT OF LIFT PLAN IOC FORM C6-04, REV. 1.0

I HEREBY CLOSE THIS PLAN :

□ CONFIRM THE IMMEDIATE WORK AREA HAS BEEN TIDIED

□ CONFIRM THAT ALL PERSONNEL WORKING UNDER THE PLANT AND PERMIT HAVE SIGNED OFF
AND LEFT THE WORK AREA

□ CONFIRM THERE HAS BEEN NO DAMAGE TO THE ENVIRONMENT FROM THE WORK CONDUCTED

□ WHERE EQUIPMENT IS UNABLE TO BE RETURNED TO SERVICE AN "OUT OF SERVICE " TAG HAS
BEEN PLACED ON THE RELEVANT ITEM

□ HAVE VISUALLY INSPECTED THE WORK AREA TO ENSURE THE TASK IS COMPLETEE AND THE
EQUIPMENT IS SAFE AND READY FOR SERVICE

□ ENSURED COPY OF PLAN IS PLACED IN CRITICAL LIFT REGISTRY

□ HAVE NOTIFIED THE ACTIVITY SUPERVISOR OR JOB-CO-ORDINATOR OF THE JOB STATUS

PERSON IN CHARGE OF JOB (Block


Latters)

SIGNATURE

LIFT PLAN Date Time


WORK INSTRUCTION
C - 6 Crane & Lifting Equipment Standard

CLOSE-OUT OF LIFT PLAN IOC FORM C6-04, REV. 1.0

I HEREBY CLOSE THIS PLAN :

□ CONFIRM THE IMMEDIATE WORK AREA HAS BEEN TIDIED

□ CONFIRM THAT ALL PERSONNEL WORKING UNDER THE PLANT AND PERMIT HAVE SIGNED OFF
AND LEFT THE WORK AREA

□ CONFIRM THERE HAS BEEN NO DAMAGE TO THE ENVIRONMENT FROM THE WORK CONDUCTED

□ WHERE EQUIPMENT IS UNABLE TO BE RETURNED TO SERVICE AN "OUT OF SERVICE " TAG HAS
BEEN PLACED ON THE RELEVANT ITEM

□ HAVE VISUALLY INSPECTED THE WORK AREA TO ENSURE THE TASK IS COMPLETEE AND THE
EQUIPMENT IS SAFE AND READY FOR SERVICE

□ ENSURED COPY OF PLAN IS PLACED IN CRITICAL LIFT REGISTRY

□ HAVE NOTIFIED THE ACTIVITY SUPERVISOR OR JOB-CO-ORDINATOR OF THE JOB STATUS

PERSON IN CHARGE OF JOB (Block


Latters)

SIGNATURE

LIFT PLAN Date Time