Hazard/Reaction to
Steps of Activity/Task Safe Plan Resources
Change
Deployed/ Accident due to collision with Permit to be obtained. Permit to work.
Positioning of hydra personal/equipment. Hydra should have the valid documents Hydra valid certificates &
Toppling of hydra due to Tool box to be given to all workers. documents
uneven ground surface(or) Task based JSA Brefing to all workers. Hydra operator Licence & JSA
uneven loading parameters Training to signalman should be ensured based Training
before taking up to the task. Signal man with task based training
Signalman should give proper signal to Experienced Rigging crews
hydra operator. Task based Training to the Rigging
Hydra operator should have valid licence. crews
Ensure that no persons should stand near SWL (Safe Weighing Load)
hydra moving area. Barricade/cordon off Task based PPE’s (Safety Helmet,
the swing area with appropriate signages Safety shoes, Safety eye wear, Cut
Hydra marching route shall be checked in resistant hand gloves, Reflective
advance and ensure the area is clear from Jacket, Full body safety harness
obstruction with double lanyard fitted with
Follow the SWL (Safe weighing Load) shock absorber
Remove the D-shackle and Hand injury due to improper Use hand gloves(Cut resistant hand gloves) Hand gloves, Safety Harness with
slings handling. Task reach Ladder should be in place after double lanyard attached with shock
Fall from height. inspection. absorber, Task reach ladder
Ladder to be secured at both ends.
Full body safety harness with double lanyard fitted
with shock absorber to be worn by the task crews
while working from 2 Mtrs. Height
Emergency Injury to workers, Scaffolding Blow the siren with the help of megaphone Emergency Assembly Point
collapsed. Mark the emergency exit signs at several locations Guidance to workers
to ease the workers to act quickly during Megaphone
emergency Fire tender
Guide the workers to assemble in the emergency First aider with first aid content
assembly point Emergency Vehicle
Call fire tender in case of major fire and do not try
to extinguish the major fire at any cost
First aider & emergency vehicle to be in place for
to act during emergency
The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew.
Supervisor’s Signature: Date 27.08.2019
Safe Plan of Action
Review checklist. Check all that apply.
A new JSA is required if the job scope or work conditions change.
Required Permits Hazards Safe Plan
Confined JSAce Overhead Utilities Power de-energization required Insulation blankets required Wire watcher required
Critical Lift Required clearance distance = _______Ft. Safe work zone marked
Hot Work Crane or other Signalman assigned Tag lines in use Area around crane barricaded
Lock Out/Tag Out Lifting Equipment Lifting equipment inspected Personnel protected from overhead load
Soil Disturbance (Over 12”) Underground Utilities Reviewed as-builts Subsurface surveys Received dig permit
Utility Clearance Required clearance distance = _______ Ft. Safe work zone Marked
Required PPE
Electrical Lock Out/Tag Out/Try Out Permit required? Confirm that equipment is de-energized
Hard Hat, Class C Reviewed electrical safety procedures
Hard Hat, Class E (Elect. Protect) Excavations Permits Inspected prior to entering Proper sloping/shoring
Ear Plugs/Ear Muffs Barricades provided Access/egress provided Protection from accumulated water
Eye Protection: Fire Hazard Hot Work Permit Fire Extinguishers Fire watch
Safety Glasses Adjacent area protected Unnecessary flammable material removed
Face Shield Vehicular Traffic or Traffic Barricades Cones Signs Flagmen Lane closure
Chemical Goggles Heavy Equipment Communication with equipment operator
Welding Hood Noise >85 dB Hearing protection is required: Ear plugs Ear Muffs Both
Hand Protection: Hand & Power Tools: Inspect general cond. GFCI in use Identified PPE required for each tool
Cut Resistant Gloves Reviewed safety requirements in operators manual(s) Guarding OK
Welders Gloves Hand Hazards List sharp tools, material, equipment: ________________________________________________
Nitrile Gloves PPE gloves, etc. Protected sharp edges as necessary
Surgical Gloves Manual Lifting Reviewed proper lifting tech. Identified material requiring lifting equipment
Rubber Gloves Hand protection required Back support belts
Elect. Insulated Gloves Ladders Inspect general cond. before use Ladder inspected with in last quarter
Arm Sleeves Ladder tied off or held Proper angle and placement Reviewed ladder safety
Foot Protection: Scaffolds Inspect general condition before useTags in place Properly secured
Sturdy Work Boots Toe boards used Footings adequate Materials properly stored on scaffold
Safety Toe Boots Slips, Trips Falls Inspect for trip hazards Hazards marked Tools & material properly stored
Rubber Boots Extension cords properly secured Work zone free of debris
Rubber Boot Covers Pinch Points List potential pinch points: ________________________________________________________
Dielectric Footwear Working near operating equipment Hand/Body positioning
Respiratory. Protection: Working w/ Chemicals List specific chemicals involved and list hazards and precaution on front side.
Reviewed MSDS Exposure Monitoring required Have proper containers and labels.
Dust Mask Identified proper PPE (respirators, clothing, gloves, etc.)
Air Purifying Respirator Asbestos or Lead Paint Areas to be worked may contain asbestos or lead paint Asbestos controls incorporated
Supplied Air Respirator Potential Lead based point controls in place Exposure monitoring conducted.
SCBA Heat Stress Potential Heat stress monitoring (>85o) Liquids available Cool down periods
Emergency Escape Respirator Sun Screen Reviewed Heat Stress symptoms
Cold Stress Potential Proper clothing (i.e.. gloves, coat, coveralls) Wind chill <32o
Special Clothing:
Reviewed Cold Stress symptoms Warm up periods
Tyvek ® Environmental Air emissions Water discharge Hazardous wastes Other wastes
Poly Coated Tyvek ® Pollution prevention Waste minimization
Fire Resistant Coveralls Natural or Site Hazards Weather Terrain Adjacent operations or processes Biological hazards
Rain Suit Animals/reptiles/insects hazards
Safety Vest Adjacent Work/Processes Notified them of our presence Other workers adjacent, above, or below.
Coordinated with adjacent supervisor/customer/operator Need barriers between.
Fall Protection:
Barricades/covers Caution barricade tape required Danger barricade tape required Rigid railing required
Harness Covers over opening Warning signs required
Double Lanyard Required Additional Information:
Anchorage Point Available
Additional Anchorage Connector
Needed e.g. Cross Arm Strap, etc.