0% found this document useful (0 votes)
206 views6 pages

Precast Erection JSW

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views6 pages

Precast Erection JSW

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

Safe Plan of Action

Activity/ Task: Erection of Precast segments Work Area: Bagur Logistic Park Rev: 00 Date:
27.08.2019
Project Name: Bagur Logistic Park Project

Activity/ Task: Erection of Precast segments Work Area: Bagur Logistic Park Rev: 0 Date:
27.08.2019
Project Name: Bagur Logistic Park.
Hazard/Reaction to
Steps of Activity/Task Safe Plan Resources
Change
Deployed/ Accident due to collision with  Permit to be obtained.  Permit to work.
Positioning of hydra personal/equipment.  Hydra should have the valid documents  Hydra valid certificates &
Toppling of hydra due to  Tool box to be given to all workers. documents
uneven ground surface(or)  Task based JSA Brefing to all workers.  Hydra operator Licence & JSA
uneven loading parameters  Training to signalman should be ensured based Training
before taking up to the task.  Signal man with task based training
 Signalman should give proper signal to  Experienced Rigging crews
hydra operator.  Task based Training to the Rigging
 Hydra operator should have valid licence. crews
 Ensure that no persons should stand near  SWL (Safe Weighing Load)
hydra moving area. Barricade/cordon off  Task based PPE’s (Safety Helmet,
the swing area with appropriate signages Safety shoes, Safety eye wear, Cut
 Hydra marching route shall be checked in resistant hand gloves, Reflective
advance and ensure the area is clear from Jacket, Full body safety harness
obstruction with double lanyard fitted with
 Follow the SWL (Safe weighing Load) shock absorber

Valid test certificates for tools & tackles


Experienced/trained riggers for the task
Cut resistant hand gloves
Mounting the wire Hand injury due to improper
Ensure valid tools & tackle certificates are in place Task reach ladder
rope/web slings and D- handling,
and inspect the tools & tackles for wear & tear Safety Helmet, Full body safety harness
Shackle Fall from height,
before deploying it for the task with double lanyard fitted with shock
Ensure experienced/trained riggers are deployed absorber, Safety shoes, cut resistant
for the task. hand gloves, guide ropes, safety eye
Task crews must worn cut resistant hand gloves wear etc.,
Task reach ladder to be inspected prior to use and Safety inspections
ladders to be secured at both ends Valid & Inspected Wire rope slings/Web
Inspect the full body safety harness prior to use Slings, D-Shackle
and ensure present month safety inspection
stickers in place Signalman,rigger,load charts,over load
warning device,SWL.
Safe Plan of Action
Activity/ Task: Erection of Precast segments Work Area: Bagur Logistic Park Rev: 00 Date:
27.08.2019
Project Name: Bagur Logistic Park Project

Ensure 100% tie off while working at height Area cordoning


Deploy life line where necessary Caution signage in vernacular language
Only signal man can give signals to the operator
and do avoid multiple signalling.

Safety Helmet,Safety shoes, cut


Lifting the Precast segment Fall of material, Ensure the lifting area graded and sound for lifting resistant hand gloves,reflective jacket,
Fall of Person operation. safety eye wear, tag lines, area
Failure of tools & tackles Ensure the maximum radius, loads and heights of cordoning,Signalman,
Failure of hydra each lift is known by the riggers & task crews & by rigger. Safety Harness with double
Hand Injury/Cut Injury, the crane operator lanyard attached with shock absorber
Injury due to caught in Ensure competent & trained operators,
between the objects. signalman,riggers are deployed
Hit Injury Ensure overlaod warning device with alarm in
Property damage working condition
. Ensure riggers aware of hydra safe weighing load,
boom radius, etc.
Hydra load chart to be displayed.
Hydra SWL to be displayed.
Ensure over hoist limit switch, boom angle
indicators are in functional mode.
Guide ropes to be used & secured to control & to
prevent the lifting load swaying
Cordon off the lifting area & swing radius of the
crane.
Ensure task based caution signages are displayed
in vernacular language

Valid Lifting tools & tackles duly


Inspect all slings,D-shackle before its use as per inspected
Safe Plan of Action
Activity/ Task: Erection of Precast segments Work Area: Bagur Logistic Park Rev: 00 Date:
27.08.2019
Project Name: Bagur Logistic Park Project

manufactures instruction. Tag lines


Precast segment placed in Toppling of materials due to Check all safety devices for its healthiness. Area cordoning with appropriate caution
already casted Plinth. improper stacking. Never lift the load above the reted capacity of signage
Fall from height. materials handling equipment. Signal man
Caught between the object. Tag lines should be tied to the lifting materials to Ladder
Hydra collapsed. prevent control of swaying Full body safety harness with shock
Fall from height. No one should be allowed to stand below the lifted absorber
Injury to person loads and in between the load & the crane to Work platform with appropriate green
Hit hazard prevent caught inbetween. tags
Area should be clear and barricaded with a Task based PPE
caution boards.
No persons should be allowed in the swing area of
Hydra.
Before carrying of the lifting operation check the
route that the materials has to be lifted.
Signalman should give proper signal to the crane
operator.
Ensure proper clearance from the electrical supply
line.
Except Signalman no one should give the signals
to hydra operator.
Ensure the pipe rack segment stacked & seated
properly in the allocated area.
Area should be barricaded.
Task ladder to be in place and the task crews to be
worn the safety harness with double lanyard fitted
with shock absorber
Ladders to be secured at both the ends
Workers must be provided appropriate work
platforms for to perform the task and green tags to
be in place
Task crews must be worn appropriate task based
PPE’s while in task

Rashes, Use adequate PPE Special tools recommended by


Burns, Provide adequate manpower for lifting of heavy manufacturer to be use.
Grouting with GP2 Eye injury, loads Keep the area clean
Respiratory Problem Training and instructions MSDS following for sealant activity
Safe Plan of Action
Activity/ Task: Erection of Precast segments Work Area: Bagur Logistic Park Rev: 00 Date:
27.08.2019
Project Name: Bagur Logistic Park Project

Use hand gloves / packing materials Confirmation of usage of required


Remove protruding nails before handling PPE’s

Remove the D-shackle and Hand injury due to improper Use hand gloves(Cut resistant hand gloves) Hand gloves, Safety Harness with
slings handling. Task reach Ladder should be in place after double lanyard attached with shock
Fall from height. inspection. absorber, Task reach ladder
Ladder to be secured at both ends.
Full body safety harness with double lanyard fitted
with shock absorber to be worn by the task crews
while working from 2 Mtrs. Height
Emergency Injury to workers, Scaffolding Blow the siren with the help of megaphone Emergency Assembly Point
collapsed. Mark the emergency exit signs at several locations Guidance to workers
to ease the workers to act quickly during Megaphone
emergency Fire tender
Guide the workers to assemble in the emergency First aider with first aid content
assembly point Emergency Vehicle
Call fire tender in case of major fire and do not try
to extinguish the major fire at any cost
First aider & emergency vehicle to be in place for
to act during emergency

Name Contractor Contractor PM CBRE Safety CBRE site


Safety Representative
Sign
Date 27-Aug-19 27-Aug-19 27-Aug-19 27-Aug-19
Execution Team PMC Team
Safe Plan of Action
Activity/ Task: Erection of Precast segments Work Area: Bagur Logistic Park Rev: 00 Date:
27.08.2019
Project Name: Bagur Logistic Park Project

Contractor (AVS Construction)

The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew.
Supervisor’s Signature: Date 27.08.2019
Safe Plan of Action
Review checklist. Check all that apply.
A new JSA is required if the job scope or work conditions change.
Required Permits Hazards Safe Plan

 Confined JSAce  Overhead Utilities  Power de-energization required Insulation blankets required  Wire watcher required
 Critical Lift  Required clearance distance = _______Ft.  Safe work zone marked
 Hot Work  Crane or other  Signalman assigned  Tag lines in use  Area around crane barricaded
 Lock Out/Tag Out Lifting Equipment  Lifting equipment inspected  Personnel protected from overhead load
 Soil Disturbance (Over 12”)  Underground Utilities  Reviewed as-builts  Subsurface surveys  Received dig permit
 Utility Clearance  Required clearance distance = _______ Ft.  Safe work zone Marked
Required PPE
 Electrical  Lock Out/Tag Out/Try Out  Permit required?  Confirm that equipment is de-energized
 Hard Hat, Class C  Reviewed electrical safety procedures
 Hard Hat, Class E (Elect. Protect)  Excavations  Permits  Inspected prior to entering  Proper sloping/shoring
 Ear Plugs/Ear Muffs  Barricades provided  Access/egress provided  Protection from accumulated water
Eye Protection:  Fire Hazard  Hot Work Permit  Fire Extinguishers  Fire watch
 Safety Glasses  Adjacent area protected  Unnecessary flammable material removed
 Face Shield  Vehicular Traffic or  Traffic Barricades  Cones  Signs  Flagmen  Lane closure
 Chemical Goggles Heavy Equipment  Communication with equipment operator
 Welding Hood  Noise >85 dB Hearing protection is required:  Ear plugs  Ear Muffs  Both
Hand Protection:  Hand & Power Tools:  Inspect general cond.  GFCI in use  Identified PPE required for each tool
 Cut Resistant Gloves  Reviewed safety requirements in operators manual(s)  Guarding OK
 Welders Gloves  Hand Hazards List sharp tools, material, equipment: ________________________________________________
 Nitrile Gloves  PPE gloves, etc.  Protected sharp edges as necessary
 Surgical Gloves  Manual Lifting  Reviewed proper lifting tech.  Identified material requiring lifting equipment
 Rubber Gloves  Hand protection required  Back support belts
 Elect. Insulated Gloves  Ladders  Inspect general cond. before use  Ladder inspected with in last quarter
 Arm Sleeves  Ladder tied off or held  Proper angle and placement  Reviewed ladder safety
Foot Protection:  Scaffolds  Inspect general condition before useTags in place Properly secured
 Sturdy Work Boots  Toe boards used  Footings adequate  Materials properly stored on scaffold
 Safety Toe Boots  Slips, Trips Falls  Inspect for trip hazards  Hazards marked  Tools & material properly stored
 Rubber Boots  Extension cords properly secured  Work zone free of debris
 Rubber Boot Covers  Pinch Points List potential pinch points: ________________________________________________________
 Dielectric Footwear  Working near operating equipment  Hand/Body positioning
Respiratory. Protection:  Working w/ Chemicals  List specific chemicals involved and list hazards and precaution on front side.
 Reviewed MSDS  Exposure Monitoring required  Have proper containers and labels.
 Dust Mask  Identified proper PPE (respirators, clothing, gloves, etc.)
 Air Purifying Respirator  Asbestos or Lead Paint  Areas to be worked may contain asbestos or lead paint Asbestos controls incorporated
 Supplied Air Respirator Potential  Lead based point controls in place  Exposure monitoring conducted.
 SCBA  Heat Stress Potential  Heat stress monitoring (>85o) Liquids available  Cool down periods
 Emergency Escape Respirator  Sun Screen  Reviewed Heat Stress symptoms
 Cold Stress Potential  Proper clothing (i.e.. gloves, coat, coveralls)  Wind chill <32o
Special Clothing:
 Reviewed Cold Stress symptoms  Warm up periods
 Tyvek ®  Environmental  Air emissions  Water discharge  Hazardous wastes  Other wastes
 Poly Coated Tyvek ®  Pollution prevention Waste minimization
 Fire Resistant Coveralls  Natural or Site Hazards  Weather  Terrain  Adjacent operations or processes Biological hazards
 Rain Suit  Animals/reptiles/insects hazards
 Safety Vest  Adjacent Work/Processes  Notified them of our presence  Other workers adjacent, above, or below.
 Coordinated with adjacent supervisor/customer/operator  Need barriers between.
Fall Protection:
 Barricades/covers  Caution barricade tape required  Danger barricade tape required Rigid railing required
 Harness  Covers over opening  Warning signs required
 Double Lanyard Required Additional Information:
 Anchorage Point Available
Additional Anchorage Connector

Needed e.g. Cross Arm Strap, etc.
 Retractable Device Needed

 Horizontal Life Line System Req’d.


 Fall Clearance Distance Adequate
 Fall Rescue/Retrieval Plan Set Up