CLADDING
CLADDING
STRUCTURAL RECOMMEN-
SUPPORT DEFORMATION LOADING
ELEMENT DATION
TYPE
DRIFT
METAL PANELS / H / 60 TO H/ 100
PERPENDICULAR 10 YEAR WIND
BARE FRAME MAXIMUM
TO WALL
FOUNDATION DRIFT
PRECAST WALLS / H / 100
PERPENDICULAR 10 YEAR WIND
BARE FRAME MAXIMUM
TO WALL
UNRIENFORCED DRIFT
1 / 16 IN. CRACK
MASONRY WALLS / PERPENDICULAR 10 YEAR WIND
BASE OF WALL
BARE FRAME TO WALL
RIENFORCED DRIFT
H / 200
MASONRY WALLS / PERPENDICULAR 10 YEAR WIND
MAXIMUM
BARE FRAME TO WALL
PRE-ASSEMBLED
UNITS / BARE RACKING H / 500 10 YEAR WIND
FRAME
CURTAIN WALLS /
RACKING H / 500 10 YEAR WIND
BARE FRAME
L / 360
CURTAIN WALLS / VERTICAL
SPANDRELS DEFLECTION
≤ 1 / 4 - 1 / 2 IN. 0.5 × LL
MAXIMUM
40 / DESIGN GUIDE 3, 2ND EDITION / SERVICEABILITY DESIGN CONSIDERATIONS FOR STEEL BUILDINGS
SERVICEABILITY CONSIDERATIONS
PLASTERED
ROOF MEMBER
VERTICAL L / 360 0.5 × LL OR
CEILING DEFLECTION MAXIMUM 50 YEAR SNOW
ROOF MEMBER
VERTICAL L / 240 0.5 × LL OR
DEFLECTION MAXIMUM 50 YEAR SNOW
NON-PLASTERED
CEILING
FLOOR BEAM / VERTICAL L / 360 ≤ 1 IN.
DL
GIRDER DEFLECTION MAXIMUM
HORIZONTAL H / 500
FRAME 10 YEAR WIND
MOVEMENT MAXIMUM
DESIGN GUIDE 3, 2ND EDITION / SERVICEABILITY DESIGN CONSIDERATIONS FOR STEEL BUILDINGS / 41
SERVICEABILITY CONSIDERATIONS
EQUIPMENT
TOP RUNNING
DRIFT AT RUNWAY H / 240 ≤ 1-IN. CRANE LATERAL
PENDANT BARE FRAME
ELEVATION MAXIMUM OR 10 YR. WIND
OPERATED
VERTICAL H / 225
JIB CRANE BOOM CRANE VERTICAL
DEFLECTION MAXIMUM
H / 500
BARE FRAME DRIFT 10 YEAR WIND
MAXIMUM
ELEVATORS
MACHINE / VERTICAL L / 1666
DL + LL
SHEAVE BEAMS DEFLECTION MAXIMUM
MACHINE /
VERTICAL H / 1666
SHEAVE BEAMS DL + LL
DEFLECTION MAXIMUM
SUPPORTS
42 / DESIGN GUIDE 3, 2ND EDITION / SERVICEABILITY DESIGN CONSIDERATIONS FOR STEEL BUILDINGS