Foundation BBS

The document is a bar bending schedule for a solar panel foundation project. It provides details on bar types, quantities, lengths and weights needed for concrete foundations. It lists 10 different bar markings for long and short spans of grade slabs and solar panel foundations. The total weight of reinforcing steel required is 32.09 tons. Dimensional details are specified in multiples of 5mm or 25mm.

Uploaded by

modarth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
216 views2 pages

Foundation BBS

The document is a bar bending schedule for a solar panel foundation project. It provides details on bar types, quantities, lengths and weights needed for concrete foundations. It lists 10 different bar markings for long and short spans of grade slabs and solar panel foundations. The total weight of reinforcing steel required is 32.09 tons. Dimensional details are specified in multiples of 5mm or 25mm.

Uploaded by

modarth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

CUT & BEND DIVISION Appendix: 4A, Issue: 4, Rev.

: 0

Contractor : AL ASAB EST. Prepared by : VKS


Project : OGD-0 & OGD-II Replacement & Modification Checked by : SKR
Schedule Reference : SOLAR PANEL FOUNDATION Revision No. :
Date Prepared : 10-Mar-19 Date Revised :
BAR BENDING SCHEDULE CONFORMS TO B.S. 8666 2005
T S NO NO TOTAL LENGTH F

SHAPE CODE

WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
Clear Cover Bottom & Sides=75mm & Top=50mm S. Dwg Ref # BBS-99-76-1624
SOLAR PANEL FOUNDATION
190 Nos. Size 2000 550 750
Long Span (T&B) 1A1 T 16 190 6 1140 2950 21 550 1850 550 5313.54
Short Span (T&B) 1A2 T 16 190 22 4180 1500 21 550 400 550 9906.60
Side bars 1A3 T 16 190 4 760 2550 21 360 1815 360 3062.04

GRADE SLAB 57 Nos. Size 2000 1910 300


Long Span (T&B) 1A4 T 12 57 26 1482 2100 21 125 1850 125 2763.63
Short Span (T&B) 1A5 T 12 57 28 1596 2025 21 125 1760 125 2869.93

GRADE SLAB 57 Nos. Size 2000 960 300


Long Span (T&B) 1A6 T 12 57 14 798 2100 21 125 1850 125 1488.11
Short Span (T&B) 1A7 T 12 57 28 1596 1075 21 125 810 125 1523.54

GRADE SLAB 38 Nos. Size 2500 1910 300


Long Span (T&B) 1A8 T 12 38 26 988 2600 21 125 2350 125 2281.09
Short Span (T&B) 1A9 T 12 38 34 1292 2025 21 125 1760 125 2323.27

GRADE SLAB 19 Nos. Size 2000 460 300


Long Span (T&B) 1A10 T 12 19 8 152 2100 21 125 1850 125 283.45
Short Span (T&B) 1A11 T 12 19 28 532 575 21 125 310 125 271.64

Size of bar T8 T10 T12 T14 T16 T20 T25 T32 T40 Total
Bar Weight (Kg/m) 0.395 0.617 0.888 1.209 1.580 2.470 3.853 6.313 9.864
Weight (Ton) 0.000 0.000 13.805 0.000 18.282 0.000 0.000 0.000 0.000 32.09

Specifies *-Multiple of 5mm **-Multiple of 25mm Page 1 of 2


CUT & BEND DIVISION Appendix: 4A, Issue: 4, Rev.: 0

Contractor : AL ASAB EST. Prepared by : VKS


Project : OGD-0 & OGD-II Replacement & Modification Checked by : SKR
Schedule Reference : SOLAR PANEL FOUNDATION Revision No. :
Date Prepared : 10-Mar-19 Date Revised :
BAR BENDING SCHEDULE CONFORMS TO B.S. 8666 2005
T S NO NO TOTAL LENGTH F

SHAPE CODE

WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*

A = STOCK LENGTHS.

R
A

A
A A B B

1 = SEMI-CIRCULAR
C
A

A
1
B

C
A
B

A C B
C

1 = SEMI-CIRCULAR

C
B
A

B
C

D
D
C

1
B B
A

E
D A

B C
C B
C

B
A A

D
D

D
D

A A

A 1 = SEMI-CIRCULAR C
A C
B
D

E
1 1
B

D
C
D

C A A

D A A
C
E

E E
B
C

B
B
D

A
D

A B C
C

C C
A E
D
C

D
B

B
A

B
D

C E
B A A

E B
A
C

C
D

A
A

R
B

F B
B C A

ALL OTHER SHAPES WHERE STANDARD SHAPES CANNOT


C = NUMBER OF TURNS
A BE USED.
NO OTHER SHAPE CODE NUMBER, FORM OF DESIGNATION
OR ABBREVIATION SHALL BE USED FOR SCHEDULING.
B

A DIMENSIONED SKETCH SHALL BE DRAWN OVER THE


DIMENSION COLUMNS A TO E. EVERY DIMENSION SHALL BE
SPECIFIED AND THE DIMENSION THAT IS TO ALLOW FOR
B

PERMISSIBLE DEVIATIONS SHALL BE INDICATED IN


D
B

PARENTHESIS, OTHERWISE THE FABRICATOR IS FREE TO


CHOOSE WHICH DIMENSION SHALL ALLOW FOR
A
C TOLERANCE.
(FIVE BENDS OR MORE MIGHT BE IMPRACTICAL WITHIN
PERMITTED TOLERANCES.)

Specifies *-Multiple of 5mm **-Multiple of 25mm Page 2 of 2

You might also like