0% found this document useful (0 votes)
60 views

Auxiliary

The document provides a computer layout for different areas of a facility. It lists the areas and what technologies are available in each, such as telephone, CCTV, biometric access, local area network, and WiFi. Some key areas mentioned are Admin, Canteen, QC/Research, Warehouse, and various utility and maintenance rooms. The layout is summarized in 3 sentences or less.

Uploaded by

Apple Anibo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views

Auxiliary

The document provides a computer layout for different areas of a facility. It lists the areas and what technologies are available in each, such as telephone, CCTV, biometric access, local area network, and WiFi. Some key areas mentioned are Admin, Canteen, QC/Research, Warehouse, and various utility and maintenance rooms. The layout is summarized in 3 sentences or less.

Uploaded by

Apple Anibo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

COMPUTER LAYOUT

AREA TELEPHONE CCTV BIOMETRIC LAN WIFI


ADMIN 51 9 1 51 4
CANTEEN 2 3 1 2 -
QC / RESEARCH 53 8 1 53 -
WAREHOUSE 16 21 2 16 -
PENICILLIN
SITE DEVELOPMENT - 26 - - -
NON-PENICILLIN
BOILER
MAINTENANCE RM
STP
RAINWATER COLL.
CISTERN TANK
DETENTION POND
UTILITIES
MRF
POWER HOUSE (CQAP) - - - - -
POWER HOUSE (WH)
POWER HOUSE (UB)
STAFF LOCKER RM
PUMP RM
ENGINEERING OFF.
SECURITY OFF.
PUTER LAYOUT FDAS
I/O ACCESS DOOR SPEAKER SMOKE DET. HEAT DET. HORN STROBE TELEPHONE JACK
11 1 55
- 1 21 11 3 3 2
28 1 114 54 7 3 3
2 181

- - -

3 1

- - 18 17 12 5 -
7 20 4 4
MANUAL PULL STATION

3
3

5
4
THE CATHAY DRUG COMPANY, INC. - YSS LABORATORIES COMPANY, INC.
PROJECT AND CONSTRUCTION MANAGEMENT

CCTV CAMERA DESIGNATION

AREA CCTV NO./NAME TYPE QTY.


1 SITE DEVELOPMENT ME IN BULLET 1
ME OUT BULLET 1
MAIN ENTRANCE PARKING BULLET 1
MAIN ENTRANCE BULLET 1
LAY-BY BULLET 1
SECURITY OFFICE BULLET 1
GATE 1 BULLET 1
GATE 2 BULLET 1
WAREHOUSE REAR BULLET 1
WAREHOUSE LS BULLET 1
PUMP ROOM 1 BULLET 1
WAREHOUSE FRONT BULLET 1
PENICILLIN WEST BULLET 1
WALKWAY 1 BULLET 1
WALKWAY 2 BULLET 1
PENICILLIN EAST BULLET 1
ROAD 4 - 1 BULLET 1
ROAD 4 - 2 BULLET 1
NON-PEN EAST BULLET 1
ADMIN LS BULLET 1
PUMP ROOM 3 BULLET 1
MAINTENANCE FRONT BULLET 1
PERIMETER 1 BULLET 1
PERIMETER 2 BULLET 1
DETENTIONPOND BULLET 1
MOTOR POOL BULLET 1
2 PENICILLIN BUILDING S 01 DOME 1
S 02 DOME 1
S 03 DOME 1
S 04 DOME 1
S 05 DOME 1
S 06 DOME 1
S 07 DOME 1
S 08 DOME 1
S 09 BULLET 1
S 10 BULLET 1

Attachment - PreBidMeeting CCTV


Note: CCTV Cameras will be proposed by the Bidder prior to Owner's Approval.

Prepared by:

Apple S. Anibo
Project QA Engineer

Attachment - PreBidMeeting CCTV


ABORATORIES COMPANY, INC.
TION MANAGEMENT

NATION

LOCATION
Main Entrance
Main Entrance
Main Entrance Parking
Main Entrance Employee
Lay-Bay
Security Office
Warehouse Gate 1
Warehosue Gate 2
Warehouse Rear Side
Warehosue Left Side
Pump Room 1
Warehouse Front
Penicillin West Side
Walkway 1 in between CQA & Pen
Walkway 2 in between CQA & Pen
Penicillin East Side
Road 4
Road 4
non-Pencillin East Side
Admin Left Side
Pump Room 3
Maintenance Office Front
Perimeter at Rear Side
Perimeter at Rear Side near Detention Pond
Detention Pond
Motor Pool Area
Receiving Bay (RM01)
Viewing Corridor - Left (RM20)
Viewing Corridor - Right (RM20)
Emergency Exit beside (CH07)
Lobby (CH01)
Corridor - Left (CH08)
Warehouse Corridor - (WH03)
Canteen Corridor (CT07)
Non-Management Canteen (CT06)
Lab Lobby (QC01)

Attachment - PreBidMeeting CCTV


Approved by:

George A. Salvilla
Plant Manager - YSS

Attachment - PreBidMeeting CCTV


The Cathay Drug Company, Inc. - YSS Laboratories, Inc.
Project and Construction Management

October 08, 2019

TRANSFORTATION ALLOWANCE

Date From To Cost Purpose


CDCI Office Site Naic, Cavite ₱103.00
7-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
14-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
21-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
28-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Arcadis Office ₱120.00
Meeting with
4-Oct-19 Arcadis & HS Pow
Arcadis Office CDCI Office ₱130.00
CDCI Office Site Naic, Cavite ₱103.00
5-Oct-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
7-Oct-19 Meeting at Site
Site Naic, Cavite CDCI Office ₱103.00
Total ₱1,486.00

Prepared by: Approved by:

Gabriel Paolo S. Ambar George A. Salvilla


Project QA Engineer Plant Manager - YSS
nc.

Remarks

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

Taxi, no receipt
With Engr. Anibo

Bus, Tricycle

Bus, Tricycle

anager - YSS
The Cathay Drug Company, Inc. - YSS Laboratories, Inc.
Project and Construction Management

October 08, 2019

FARE REIMBURSEMENT

Date From To Cost Purpose


CDCI Office Site Naic, Cavite ₱103.00
7-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
21-Sep-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
5-Oct-19 Site Inspection
Site Naic, Cavite CDCI Office ₱103.00
CDCI Office Site Naic, Cavite ₱103.00
7-Oct-19 Meeting at Site
Site Naic, Cavite CDCI Office ₱103.00
Total ₱824.00

Prepared by: Approved by:

Apple S. Anibo George A. Salvilla


Project QA Engineer Plant Manager - YSS
nc.

Remarks

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

Bus, Tricycle

anager - YSS
THE CATHAY DRUG COMPANY, INC. - YSS LABORATORIES COMP
PROJECT AND CONSTRUCTION MANAGEMENT

CCTV CAMERA DESIGNATION and MOUNTING HEIGHT

AREA CCTV NO./NAME TYPE QTY.


1 SITE DEVELOPMENT ME IN BULLET 1
ME OUT BULLET 1
MAIN ENTRANCE PARKING BULLET 1
MAIN ENTRANCE BULLET 1
LAY-BY BULLET 1
SECURITY OFFICE BULLET 1
GATE 1 BULLET 1
GATE 2 BULLET 1
WAREHOUSE REAR BULLET 1
WAREHOUSE LS BULLET 1
PUMP ROOM 1 BULLET 1
WAREHOUSE FRONT BULLET 1
PENICILLIN WEST BULLET 1
WALKWAY 1 BULLET 1
WALKWAY 2 BULLET 1
PENICILLIN EAST BULLET 1
ROAD 4 - 1 BULLET 1
ROAD 4 - 2 BULLET 1
NON-PEN EAST BULLET 1
ADMIN LS BULLET 1
PUMP ROOM 3 BULLET 1
MAINTENANCE FRONT BULLET 1
PERIMETER 1 BULLET 1
PERIMETER 2 BULLET 1
DETENTIONPOND BULLET 1
MOTOR POOL BULLET 1
2 PENICILLIN BUILDING S 01 DOME 1
S 02 DOME 1
S 03 DOME 1
S 04 BULLET 1
S 05 DOME 1
S 06 DOME 1
S 07 DOME 1
S 08 DOME 1
S 09 DOME 1
S 10 BULLET 1
S-1 (Level 2) BULLET 1
S-2 (Level 2) DOME 1
S-3 (Level 2) BULLET 1
S-1 (Roof Deck) DOME 1
S-2 (Roof Deck) BULLET 1

Note: CCTV Cameras will be proposed by the Bidder prior to Owner's Approval.
Camera pole is provided by the Bidders

Prepared by:

Apple S. Anibo
Project QA Engineer
Y, INC. - YSS LABORATORIES COMPANY, INC.
D CONSTRUCTION MANAGEMENT

GNATION and MOUNTING HEIGHT

LOCATION MOUNTING HEIGHT


Main Entrance 3.5M
Main Entrance 3.5M
Main Entrance Parking 3.5M
Main Entrance Employee 3.5M
Lay-Bay With Pole @ 6M High
Security Office 3.15M
Warehouse Gate 1 With Pole @ 6M High
Warehosue Gate 2 Top of Gate Post @ 3M
Warehouse Rear Side Top of Perimeter Fence @ 3M
Warehosue Left Side At the Watch Tower @ 6M high
Pump Room 1 At the Watch Tower @ 6M high
Warehouse Front At Warehouse 2F Line @ 6.65M
Penicillin West Side At Warehouse 2F Line @ 6.65M
Walkway 1 in between CQA & Pen Back of Penicillin @ 3M
Walkway 2 in between CQA & Pen Back of Penicillin @ 3M
Penicillin East Side 10.75M
Road 4 With Pole @ 6M High
Road 4 With Pole @ 6M High
non-Pencillin East Side With Pole @ 6M High
Admin Left Side 3M High
Pump Room 3 With Pole @ 6M High
Maintenance Office Front With Pole @ 6M High
Perimeter at Rear Side At the Watch Tower @ 6M high
Perimeter at Rear Side near Detention Pond With Pole @ 6M High
Detention Pond At the Watch Tower @ 6M high
Motor Pool Area At the Watch Tower @ 6M high
Receiving Bay (RM01) 3.00M
Viewing Corridor - Left (RM20) 3.00M
Viewing Corridor - Right (RM20) 3.00M
Emergency Exit beside (CH07) 3.00M
Lobby (CH01) 4.00M
Corridor - Left (CH08) 3.00M
Warehouse Corridor - (WH03) 3.00M
Canteen Corridor (CT07) 3.00M
Non-Management Canteen (CT06) 3.00M
Lab Lobby (QC01) 3.00M
Plant Room (Level 2) 3.75M
PW & WFI Loop Distribution Room (PEN205) 3.75M
BMS & EMS ROOM (PEN203) 3.75M
Chiller and Pump Room 3.80M
Parapet Wall 1.20M

Approved by:

George A. Salvilla
Plant Manager - YSS
AREA SPEAKER Amplifier
ADMIN 55 2
CANTEEN 21 2
QC / RESEARCH 105 2
WAREHOUSE 185 2
PENICILLIN
SITE DEVELOPMENT -
NON-PENICILLIN
BOILER
MAINTENANCE RM
STP
RAINWATER COLL.
CISTERN TANK
DETENTION POND
UTILITIES
MRF
POWER HOUSE (CQAP) 18
POWER HOUSE (WH) 7
POWER HOUSE (UB)
STAFF LOCKER RM
PUMP RM
ENGINEERING OFF.
SECURITY OFF.