Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
138 views
11 pages
RWF M Specn 1 016 1987 GMB Alt o
Graphite mould blank
Uploaded by
Devarshi Gaur
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Rwf m Specn 1 016 1987 Gmb Alt o For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
138 views
11 pages
RWF M Specn 1 016 1987 GMB Alt o
Graphite mould blank
Uploaded by
Devarshi Gaur
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Rwf m Specn 1 016 1987 Gmb Alt o For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Rwf m Specn 1 016 1987 Gmb Alt o For Later
You are on page 1
/ 11
Search
Fullscreen
([RWFIMISPECN-1701671987 AR "o] GOVERNMENT OF INDIA (Ministry of Railways) SPECIFICATION FOR GRAPHITE MOULD BLANKS TYPE A: 1097 Dia x 575 Height TYPE B: 1224 Dia x 575 Height TYPE C: 1325 Dia x 575 Height TYPE D: 1021 Dia x 575 Height Issued by MECHANICAL DRAWING OFFICE RAIL WHEEL FACTORY YELAHANKA, BANGALORE-560 064 INDIA _ | Lee Popup (_ —— Chaudies v¥| [ fC go SSED PREPARED BY Page of 11 [—“aeeroven ay REVIEWED BY VERIFIED ay —1.0 2.0 3.0 34 3.2 3.3 RWE/M/SPECN-1/018/1987 Alt ‘| SPECIFICATION FOR GRAPHITE MOULD BLANKS SCOPE ‘The Specification covers the design, manufacture and supply of Graphite Mould Blanks at Rail Wheel Factory, Bangalore - 560 064, Kamataka State, India as per instructions and conditions of contract. GENERAL DESCRIPTION Graphite Mould Bianks of dimensions and sizes specified in technical data of the specification JOB REQUIREMENTS ‘The Graphite Blanks shall be used as permanent graphite moulds (Cope and Drag), after machining, for manufacture of Cast steel wheels by the pressure pouring method, i.e., forcing up molten metal into mould cavity through the in- gate made up of clay graphite The temperature of molten metal is in the range of 1600-1620°C. Moulds are pre heated to 350°C before using and the surface is protected using fused silica spray coating. Cast moulds are recycled after cleaning the surface by sand blasting using fine sand. The graphite Mould shall with stand the operating condition and shall have good wear! erosion and oxidation resistance under the operating condition MANUFACTURE AND QUALITY ASSURANCE PLAN (QAP) The manufacturer shall take extreme care to meet the product requirement and job requirement and have optimum erosion and oxidation resistance so that the consumption rate shall be the minimum. The blanks shall be adequately pitch impregnated to achieve the bulk density specified. The particle size and their size distribution in the raw material shall be selected in such 2 manner to obtain the optimum performance. The manufacturer shail submit their QAP along with their bid for approval by RWF, which will be followed in the manufacturing of Graphite Mould Blanks to satisfy the technical requirement as required under this specification. Manufacturer shall get their QAP approved from RWF in advance, ie., before starting manufacturing of graphite mould blanks, unless a waiver is given to this effect. MANUFACTURERS TEST CERTIFICATE (MTC) The manufacturer shall submit the MTC containing the test results of the Graphite Mould Blanks for all parameters specified under Clauses 4.1, 4.3, 4.4 & 4.5 and ensure the compliance of the specified parameters under Clause 5.0 Page 2 of 1134 4.0 44 4441 42 RWFIMISPECN-1/016/1987 Alt “o} TESTING FACILITY The manufacturer shail have testing facility for characteristics specified in clause 4.3.1 to 4.3.7. In case any facility is not available in-house, the manufacturer shall carry out the test through a reputed laboratory on his own ‘expense. Testing from any out-side agency shall be clearly brought out in the offer, TECHNICAL DATA Sizes of Graphite Mould Blanks shall be as follows: Blank dia for a) Type A {1097 dia} 1097°%.mm dia x 675 “9mm height b) Type B (1224 dia} 1224°%.9mm dia x §75°*/.) mm height. ©) Type C {1325 dia} 1325°%/.gmm dia x §75°/.9mm height. d) Type D {1021 dia} 1021°9.9mm dia x 575°4/.9mm height. Surface finish of the Graphite Mould Blank: —_N8 all over. A cylindrical coupon for sample preparation for testing shal! be drawn from Graphite Mould Blank (GMB) as shown in the sketch below. The sample shall be drawn in such a manner that it shall not damage or make the blank Unsuitable for the intended purpose. Page 3 of ¢aaBT ARI RWE/M/SPECN.1/016/1987 Alt ‘o} 4.3 Other technical parameters shall be as follows: S28? | characteristic | Unit | SPetied | Tea Metros | Fee fy 431 _ | Bulk Densty gmion | 1,604.70 | ASTM A Blanks | As per the 559 sketch at _| clause 4.2 432 | Slectioresistiviy | Ohm- [76X10 | ASTM ATBlanks | As per the (measured paralel_ | om cétt sketch at to avs) (max) | clause 42 [433. | Permesbiity AS [076080 | ArFow ‘AIBlanks | As per the (baralelto axis) | ant Method AFS: sketch at : | clause 4.2 434 | Flouralstengih [Kal | Notless | ASTMG 651- | AllBlanks [As por the (Garalelto axs) cm? | than 100- | Latest, sketch at (rin) 4 point | 4-point loading clause 4,2 foating Or ASTM D-7972- Or | Latestfor3 Equivalent | point oading in3 point loading 435 | Stidure and | Shalnot show any | Visual ‘ABianks | Full moult surface extraneous material _| inspection surface 436 | Ash content by [0.20 | Losson Balch | As per the (max) weight ignition wise | sketch at ASTMC-561 cause 4.2 437 |Maimumgrain [mm | 08 Vetfication of | Batch | Sample from size used | manufacture | wise | processed records raw material mix 4.4 Apparent porosity preferred is less than 24% but shall not be more than 29% when tested as per ASTM C-1039 or by calculation as: {(True density - App. density) / True density} X10 45 The permeability range in a lot shall be uniformly distributed. The manufacturer shall aim to achieve the permeability range distribution of the lot in such a way that the following shall be met [Permeability Range Percentage of mould in a lot 0.16 - 0.40 AFS 0.41 - 0.80 AFS 80% 0% SSE (Tprepareoay —] Page 4 of 17RWF/MISPECN-1/016/1987 Ait ‘o} 5.0 OTHER FEATURES i) The graphite mould blanks shall have sufficient thermal shock resistance to withstand high temperature of molten steel without cracking ji) The graphite mould blanks shall have low co-efficient of thermal expansion. iil) The Graphite mould blanks shall be easily machinable; contour of the wheel shai be machined by form tools on cope and drag, iv) The supplier shall legibly print the permeability values and ash content on the mould blank. 6,0 WARRANTY For the under mentioned conditions, the shop operating parameters & practices are considered common for ail manufacturer/suppliers: i) If after removing the mould coating and oxidised surface, an area with unsatisfactory structure becomes visible and requires machining, the contractor shall offer incremental credit whenever void/flaws greater than 6 mm in depth are noticed ii) RWF will proceed with machining of all such moulds until the void/flaw disappears. The extra machining (in excess of 6 mm) necessitated by the said void/law in the structure will have to be compensated by the contractor (without insisting on joint inspection). The rate of such compensation should also be stated at the time of making the offer. il) However, if the voidiflaw does not get eliminated even after machining to a depth of 36 mm, the mould will be kept aside and offered for joint inspection with the supplier and further disposal will be decided during such joint inspection. iv) The contractor shall, if required, replace the Stores or such portion thereof as is rejected by the purchaser free of cost at the ultimate destination, or at the option of the purchaser and the contractor shall pay the purchaser value thereof at the contract price, and to such other expenditure and damages as may arise by reason of the breach of conditions herein specific. v) If any defective Stores is not replaced within the above mentioned 3 months, the purchaser may proceed todo the replacement at contractor's risk and cost and also without prejudice to any other rights of the purchaser under this contract. ‘SSE/D PREPARED BY] Page 6 of 17vi) vil) 7.0 8.0 84 82 (RWFAWSPEON-701671967 Ak 6} If the contractor so desires, the replaced parts can be taken by him or his representatives in India for disposal as he deems fit within a period of 3 months, from the date _of replacement of the Stores. At the expiry of this period, no claim whatsoever shail lie on the purchaser. If a cope produces more than 5 wheel rejections attributable to mould quality, duly discounting for process variation, the mould will be rejected and warranty claim will be raised Note: i. The Wheel defects (XC set) lkely to be caused due to poor graphite mould quality is based on RWF's 35 years of experience with different make/type of moulds and process variation. List of defects in XC set: XC46-Pocker, XC56-Hollowface Hub, XC626-Graphite Inclusion, XC15-Pinhole, XC33-hole in bore. ji, Process related defects to be discounted are defined as a. Defects arising just after machining ie., at Cope Life 1, will be taken on process account. b. In case more than 2 of above defects are arising in a particular heat these defects also will be taken as on process account, PERFORMANCE The performance of the firm will be adjudged based on % Warranty replacements with respect to the supplied quantity against the particular purchase order. INSPECTIONS, TEST CERTIFICATE AND ACCEPTANCE The manufacturer will submit their Internal Test Certificate along with the supply as specified in clause 3.3. Acceptance will be based on manufacturers internal test certificate indicating compliance to technical parameters and other features detailed under main clauses 4.0 and 5.0 respectively. If laid down in the purchase order, RWF or its authorised representative may carry out inspection at the manufacturer's premises. The manufacturer shall offer the Graphite Mould Biank after the internal inspection and compliance of specified requirements along with Manufacturer's Test Certificate. The RWF’s authorised representative shall have access to verify the manufacturing process, records, and witness the testing of the offered Graphite Mould Blanks either at their own laboratory or at the authorised outside laboratory. It is the responsibility of the manufacturer to offer him free access to carry out the inspection: SSE Fe Page 6 of( RWFRMISPECH: (107687 AK} 9.0 PACKING & HANDLING The graphite mould blanks shall be suitably packed in wooden cases to avoid transportation damage. Cases must amenable to handle by forklift trucks. 10.0 TRIAL OF THE SUPPLY The material for trial shall necessarily meet all the requirements mentioned elsewhere in this specification prior to shop floor trial. Only after this, the material will be taken up for shop floor trial by RWF as per Trial Scheme at Annexure-1 and the corresponding Trial Report shall be prepared as per Annexure-2. Page 7 of 17RWF/M/SPECN-1/016/1967 Alt ‘o} Annexure -1 TRIAL SCHEME OF GRAPHITE MOULD BLANK Trial Scheme No. RWFIM/SPECN-1/016/1987 alt .../ Trial Scheme PL.NO. 2 | Objective of Trial To establish the suitability of graphite mould blank as per Specn No. RWF/M/SPECN- [ 1016/1987 alt... - 3 _| Description of Material GRAPHITE MOULD BLANK PO Number & PO date PO Qty ‘Supplier | 4 |IDNNumber&Date | |__[IDN Qty. - 5 | Authority for conducting | Dy. CME/ Mig Trial 6 | Earlier trial details First Time Supply/ Second time/ Third time - i 1 7_| Trial Parameters ‘As mentioned in Trial Scheme |_ 8 | Specification RWE/M/SPECN-1/016/1987 alt [9 [Pre-trial Testing details | Met. Lab Report & MTC 10 | Trial qty Full IDN Qty/ 5% of the tendered quantity 77 | Equipment / Station Mould Room process _ ( to be filled by Team Members) Trial Parameters: 1. Total quantity graphite mould blank to. be drawn and trial conducted on the entire quantity under the whichever is less. purchase order/5% of the tendered quantity, Inspection & testing by shop and whenever required by laboratory completely in line (not in part) with the sp specification. .ecification. Sampling for inspection as per RWF Examination of MTC (Manufacturer's Test Certificate) and comments on its suitability, ic Requirements: Study the trend of XC set (x (C46-Pocker, XC56-Hollowface Hub, XC626-Graphite Inclusion, XC15-Pinhole, XC33-hole in bore) whee! rejections in the trial moulds and find out number of GMBs producing more than 5 rejections duly discounting process variations and compare with that of other makes by ensuring same process parameter during use and in the same period (or just preceding/succeeding period) — Chodig 32/0 [respira Page 8 of 17RWWEIMISPEEN-T1016/1887 A “o} Annexure -2 TRIAL REPORT OF GRAPHITE MOULD BLANK [ RWFIM/SPECN-1/016/1987 alt .../ Trial Scheme _ - PLNO.... 2 | Objective of Trial To establish the suitability of graphite mould blank as per Specsi No. RWF/M/SPECN- _ | 11016/1987 alt 3 | Description of Material GRAPHITE MOULD BLANK PO Number & PO date PO ty Supplier 4 [TDN Number & Date 7 7 IDN Qty. — 3 | Authority or conducting | by. CME/ Mig Trial 6 |Earlertrialdetais —‘| Fist Time Supply? ‘Second time/ Third time I 7_| Trial Parameters I ‘As mentioned in ii ‘Scheme 8 — RWE/M/SPECN-1/016/1987 alt 9_| Pre-trial Testing details __| Met. Lab Report & MTC. 40_| Trial gty Full IDN Qty/ 5% of the tendered quantity 11_| Equipment/ Station Mould Room process Nominated Officers ACMTW & AWMIMR to be filled by Team Members) Application Test: Shop Floor test conducted from date to date &H.No, Trial Parameters: 1 Total quantity of graphite mould blank to be drawn and trial conducted on the entire quantity under the purchase order/5% of the tendered quantity, whichever is less. ‘Comments: 2 Inspection & testing by shop and whenever required by laboratory compietely in line (not in part) with the specification. Sampling for inspection as per RWF specification _ 7 Enclosure Details: Page 9 of 17RWF/M/SPECN-1/016/1987 At] 3 Examination of M Lab report & MTC (Manufacturer's Test Certificate) and comments on its suitability = ‘Comments with documents: oceeunens - — ] Specific Requirements: 4. Study the trend of XC set (KC46-Pocker, XC56-Hollowface Hub, XC626-Graphite Inclusion, XC15-Pinhole, XC33-hole in bore) wheel rejections in the trial moulds and find out number of GMBs producing more than 5 rejections duly discounting process variations and compare with that of other makes by ensuring same process parameter during use and in the same period (or just preceding/succeeding period). Observations: AWM/WM ACMTW SSE/MR ww Remarks of Dy CME/Mfg. Remarks of AEDIM&C CWE Page 10 of 17RWE/M/SPECN. 1016/1987 Alt AMENDMENT SHEET a rm — vn Tae ae son : Dest a Denibn — = |e 2 i | slalalaq}al ile iff: {|i | 5 i Hi Aaa aa 434 i TI | 404 tl |e : : j ned Vip f lta] | PTL aERAH } ale Pl Ee i | i rH le i area Twa Mt epee cp wee MO coe pan no fin § el cin epee cen ‘as row sin art tn tna pr ate poo fan, te tot ese tentaunelsbeye cat wero ae ces ri ra vee coos Serenata ceeeeare | sal eo ao | | permeate’ gaty esos Span comraSoun beltcege pecan gay tad PY Se wi | istitis exceeded, atte copes, which | Wi process vataon Ut of dleds In XC set XCAB- Case pent ot eee Pose ‘lobes a, C85 ape se hop est fete anon tin nb 1 pnt coats ene ors 2 pabuene tar tochig a 08 sitter oraeees eeu oy heme ne tte ees eg 8 prin vcs ot feast ren) Pesrorance ee cron fous 8 pecker ee | | un mene oma ae! at cree on ra | | anttnpernn oan ees v0 a nro a aes " Specie Ragone Sc Raven 1 Comme te conto par| | 1 buyhntet ot CA Po nn omer ete ad nat sha ieen opie ar oP No tamer oer ates by owe | | tom vd in nt oa at ae ‘same process parameter during use | “12 | numbor of GMB posing more than § recone diy th be san ptod or a a preceding Pte certs sy sane geo or Cm dine se Pt rt stags oe SSE/D PREPARED EY Page 11 of 7
You might also like
4TMS 096 068Rev-2Alt-1
PDF
No ratings yet
4TMS 096 068Rev-2Alt-1
7 pages
Arbitration & Alternate Dispute Resolution: K K Goyal Sr. Prof. (Fin. & Invest.) National Academy of Indian Railwa
PDF
100% (1)
Arbitration & Alternate Dispute Resolution: K K Goyal Sr. Prof. (Fin. & Invest.) National Academy of Indian Railwa
163 pages
Specification Ductile Iron Pipes Fittings
PDF
No ratings yet
Specification Ductile Iron Pipes Fittings
41 pages
Aa19703 07
PDF
No ratings yet
Aa19703 07
7 pages
History:: About Chittaranjan Locomotive Works
PDF
No ratings yet
History:: About Chittaranjan Locomotive Works
66 pages
API 590 Steel Line Blanks
PDF
No ratings yet
API 590 Steel Line Blanks
29 pages
Mold Spec Guidelines Jun 08revised
PDF
No ratings yet
Mold Spec Guidelines Jun 08revised
27 pages
Mil A 2550
PDF
No ratings yet
Mil A 2550
17 pages
AS 1163-1991 Structural Steel Hollow Sections
PDF
No ratings yet
AS 1163-1991 Structural Steel Hollow Sections
27 pages
12017ar at
PDF
No ratings yet
12017ar at
4 pages
Pdvsa: Material Technical Specification
PDF
No ratings yet
Pdvsa: Material Technical Specification
19 pages
604.5400 E T-Handle Cover
PDF
No ratings yet
604.5400 E T-Handle Cover
3 pages
Inspection Note of Dy - CCMT at Alloy Steel Plant and Durgapur Steel Plant, Durgapur On 9-10 July 2019
PDF
No ratings yet
Inspection Note of Dy - CCMT at Alloy Steel Plant and Durgapur Steel Plant, Durgapur On 9-10 July 2019
13 pages
3 Phase Locomotive
PDF
100% (7)
3 Phase Locomotive
38 pages
Molybdenum Flattened Wire For Electron Tubes
PDF
No ratings yet
Molybdenum Flattened Wire For Electron Tubes
3 pages
M26-1F-6662 Pipe Support Components and Fabricated Assemblies
PDF
No ratings yet
M26-1F-6662 Pipe Support Components and Fabricated Assemblies
8 pages
RITA - Tanque Cilindrico - HCL Al 35% - 48k - Short
PDF
No ratings yet
RITA - Tanque Cilindrico - HCL Al 35% - 48k - Short
2 pages
AASHTO Pot Bearings
PDF
No ratings yet
AASHTO Pot Bearings
4 pages
356 LKE, 555 MT G (T) Bearing N-Model
PDF
No ratings yet
356 LKE, 555 MT G (T) Bearing N-Model
1 page
M8 X 80
PDF
No ratings yet
M8 X 80
1 page
Annex VI - Drawings and BOM
PDF
No ratings yet
Annex VI - Drawings and BOM
52 pages
Aerospace: Standard
PDF
No ratings yet
Aerospace: Standard
7 pages
Mil B 8831B
PDF
No ratings yet
Mil B 8831B
28 pages
ZSD-EX-TDS-PW-0028-General Item Hangers and Supports PDF
PDF
No ratings yet
ZSD-EX-TDS-PW-0028-General Item Hangers and Supports PDF
78 pages
Inspection and Test Plan - Cold Insulation Application & Materials
PDF
No ratings yet
Inspection and Test Plan - Cold Insulation Application & Materials
1 page
Commscope RR-FA2
PDF
No ratings yet
Commscope RR-FA2
5 pages
RITA - Tanque Cilindrico #3 - SPI - David - Short
PDF
No ratings yet
RITA - Tanque Cilindrico #3 - SPI - David - Short
2 pages
LATEST RWF-Prop-1-cast-vs-forge-modified
PDF
No ratings yet
LATEST RWF-Prop-1-cast-vs-forge-modified
8 pages
Specification For Ductile Iron Castings For Paper Mill Dryer Rolls
PDF
No ratings yet
Specification For Ductile Iron Castings For Paper Mill Dryer Rolls
6 pages
E - Document - 2024 07 08 15 52 59
PDF
No ratings yet
E - Document - 2024 07 08 15 52 59
8 pages
(485MW) Technical Sheet EN
PDF
No ratings yet
(485MW) Technical Sheet EN
1 page
TTC Class Power CKT
PDF
No ratings yet
TTC Class Power CKT
41 pages
MEP 15-013 - Eng - Rev R
PDF
No ratings yet
MEP 15-013 - Eng - Rev R
12 pages
TM HM6 111
PDF
No ratings yet
TM HM6 111
4 pages
FOV CHASIS un6251-2802-00#RevB#A1#S2
PDF
No ratings yet
FOV CHASIS un6251-2802-00#RevB#A1#S2
2 pages
NH Màn Hình 2024-12-04 Lúc 09.22.56
PDF
No ratings yet
NH Màn Hình 2024-12-04 Lúc 09.22.56
3 pages
Paf002 V0006 Me DRG 0009 - B - A
PDF
No ratings yet
Paf002 V0006 Me DRG 0009 - B - A
1 page
Hy19569 06
PDF
No ratings yet
Hy19569 06
7 pages
Trial Scheme of PF Resin & Brcks
PDF
No ratings yet
Trial Scheme of PF Resin & Brcks
26 pages
Designation:-Stack Detail Drg No 460SK1 Rev No φ1600 Tot Wt (Kgs) S. No. Description Item No Qty
PDF
No ratings yet
Designation:-Stack Detail Drg No 460SK1 Rev No φ1600 Tot Wt (Kgs) S. No. Description Item No Qty
28 pages
Aa19721 03
PDF
No ratings yet
Aa19721 03
5 pages
CFB08
PDF
No ratings yet
CFB08
12 pages
Type F3 - 1936 KN Trans Guided Bearing Drawing
PDF
No ratings yet
Type F3 - 1936 KN Trans Guided Bearing Drawing
1 page
Agro Engineering Works XD Cover Brake Disc Dust
PDF
No ratings yet
Agro Engineering Works XD Cover Brake Disc Dust
3 pages
Product Brochure of Speciality-Products
PDF
No ratings yet
Product Brochure of Speciality-Products
13 pages
Project Title: A Comparative Study of Structural Performance of Cast Steel Rail Wheel and Forged Steel Rail Wheel
PDF
No ratings yet
Project Title: A Comparative Study of Structural Performance of Cast Steel Rail Wheel and Forged Steel Rail Wheel
12 pages
SPECAA22421
PDF
No ratings yet
SPECAA22421
4 pages
Hindustan Standards Bureau: Gap Analysis Report For The Implementation of ISO 17025:2017 For NABL Accreditation
PDF
100% (2)
Hindustan Standards Bureau: Gap Analysis Report For The Implementation of ISO 17025:2017 For NABL Accreditation
1 page
Asme Section II A-2 Sa-476 Sa-476m
PDF
No ratings yet
Asme Section II A-2 Sa-476 Sa-476m
6 pages
Aa10901 Rev 06
PDF
No ratings yet
Aa10901 Rev 06
9 pages
Heat Treatment of Narrow Gauge Wheel
PDF
No ratings yet
Heat Treatment of Narrow Gauge Wheel
7 pages
c-9406 Rev2 Amend 2 Aug-16
PDF
No ratings yet
c-9406 Rev2 Amend 2 Aug-16
13 pages
Calendar For List of Materials Under Shop Floor Trial at Wheel Shop
PDF
No ratings yet
Calendar For List of Materials Under Shop Floor Trial at Wheel Shop
8 pages
Raychem Brand Instalite ZH150 Sleeving: Scope
PDF
No ratings yet
Raychem Brand Instalite ZH150 Sleeving: Scope
7 pages
A8 A8 Typ. 11: Document Control GCC
PDF
No ratings yet
A8 A8 Typ. 11: Document Control GCC
4 pages
Ball Base 12.0 20.0: Letourneau Technologies™
PDF
No ratings yet
Ball Base 12.0 20.0: Letourneau Technologies™
1 page
Sa 476
PDF
No ratings yet
Sa 476
6 pages
Dynaform FRP Structural Shape Specs
PDF
No ratings yet
Dynaform FRP Structural Shape Specs
5 pages
Spec 18042015
PDF
No ratings yet
Spec 18042015
5 pages
Ministry of Defence Defence Procurement Agency, ADRP2 Abbey Wood Bristol BS34 8JH
PDF
No ratings yet
Ministry of Defence Defence Procurement Agency, ADRP2 Abbey Wood Bristol BS34 8JH
3 pages
I6015p and I6015p T Specs
PDF
No ratings yet
I6015p and I6015p T Specs
6 pages
MIL-P-24074 (Polytetrafluoroethylene Parts and Coatings and Polyamide Parts)
PDF
No ratings yet
MIL-P-24074 (Polytetrafluoroethylene Parts and Coatings and Polyamide Parts)
6 pages
The Dow Chemical Company Engineering Specification Materials G8S-4001-50 Global 14-MAR-2002 Page 1 of 4
PDF
No ratings yet
The Dow Chemical Company Engineering Specification Materials G8S-4001-50 Global 14-MAR-2002 Page 1 of 4
4 pages
Ams3669 - Molded Ptfe
PDF
No ratings yet
Ams3669 - Molded Ptfe
3 pages
IITRAA Brochure
PDF
No ratings yet
IITRAA Brochure
4 pages
2903
PDF
No ratings yet
2903
5 pages
JW Inmarco Flexible Pure Graphite Gasket Sheet
PDF
No ratings yet
JW Inmarco Flexible Pure Graphite Gasket Sheet
2 pages
Trial of PF Resin Latest
PDF
No ratings yet
Trial of PF Resin Latest
3 pages
GTO (Gate Turn - OFF Thyristor)
PDF
No ratings yet
GTO (Gate Turn - OFF Thyristor)
3 pages
Image 161
PDF
No ratings yet
Image 161
3 pages
Exact Short-Calender
PDF
No ratings yet
Exact Short-Calender
3 pages
Fiberglass Reinforced Plastics
PDF
No ratings yet
Fiberglass Reinforced Plastics
6 pages
Calender of Wheel Shop Consumables Date: 28.10.2020 PO. No, Date & Qty Date of Completion
PDF
No ratings yet
Calender of Wheel Shop Consumables Date: 28.10.2020 PO. No, Date & Qty Date of Completion
2 pages
Daily Position of Samples at Physical Lab: Date: 28/11/2024
PDF
No ratings yet
Daily Position of Samples at Physical Lab: Date: 28/11/2024
1 page
Dispensation From Cofmow
PDF
No ratings yet
Dispensation From Cofmow
1 page
Delivery Breakup PDF
PDF
No ratings yet
Delivery Breakup PDF
1 page
Letter For Masks
PDF
No ratings yet
Letter For Masks
1 page
Reply To RSPB PDF
PDF
No ratings yet
Reply To RSPB PDF
1 page
GM Order
PDF
No ratings yet
GM Order
1 page