Cantilever Retaining Wall Design: ASDIP Retain 3.7.1

This document contains design calculations for a cantilever retaining wall, including: - Input parameters for the wall geometry, soil properties, surcharges, and seismic conditions. - Calculations of active earth pressure and seismic forces on the wall for stability and structural design. - Itemization and calculation of forces and bending moments on the wall from the backfill, footing, water, and other loads. - Determination of the resulting horizontal force and overturning moment on the wall, as well as the location of the resulting force.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Cantilever Retaining Wall Design: ASDIP Retain 3.7.1

This document contains design calculations for a cantilever retaining wall, including: - Input parameters for the wall geometry, soil properties, surcharges, and seismic conditions. - Calculations of active earth pressure and seismic forces on the wall for stability and structural design. - Itemization and calculation of forces and bending moments on the wall from the backfill, footing, water, and other loads. - Determination of the resulting horizontal force and overturning moment on the wall, as well as the location of the resulting force.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

SPECTRA Project: DPT Kavling Cimahi Page # ___

Engineer: RJP 17/06/2019


Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Conc. Stem Height ................ m Uniform Surcharge ................ Kg/m²


Stem Thickness Top ............. cm Strip Pressure ....................... Kg/m²
Stem Thickness Bot .............. cm
Footing Thickness ................. cm Stem Vertical (Dead) ............. Tn/m
Toe Length ............................ m Stem Vertical (Live) ............... Tn/m
Heel Length ........................... m Vertical Load Eccentricity ..... cm
Soil Cover @ Toe .................. m Wind Load on Stem ............... Kg/m²
Backfill Height ....................... m OK Wind Height from Top ........... m
Backfill Slope Angle .............. deg

Wall taper aTan ((100,0 - 50,0) / 100 / 4,00) = 0,124 rad


Backfill slope 0,0 * 3.14 / 180 = 0,000 rad
Internal friction 30,0 * 3.14 / 180 = 0,524 rad
Wall-soil friction 0,524 / 2 = 0,262 rad
Seismic angle aTan (0,00 / (1 - 0,00)) = 0,000 rad
Footing length 1,00 + 100,0 / 100 + 2,00 = 4,00 m
Height for Stability 0,00 + 4,00 + 100,0 / 100 = 5,00 m
Earth pressure theory = Coulomb Active Moist density = 1800 Kg/m³ Saturated density = 2000 Kg/m³

Active coefficient = 0,35

Active pressure 0,35 * 1800,0 = 638,2 Kg/m²/m of height


- For stability analysis (non-seismic)
Active force 0,35 * 1800,0 * 5,00² / 2 = 8,0 Tn/m
8,0 * Cos(0,262 + 0,124) = 7,4 Tn/m
8,0 * Sin(0,262 + 0,124) = 3,0 Tn/m
Water force
Pw = (0,35 * (2000,0 - 1000,0 - 1800,0) + 1000,0) * 0,00² / 2 = 0,0 Tn/m
- For stem design (non-seismic)
Active force 0,35 * 1800,0 * 4,00² / 2 = 5,1 Tn/m
5,1 * Cos (0,262 + 0,124) = 4,7 Tn/m
5,1 * Sin (0,262 + 0,124) = 1,9 Tn/m
Water force
Pw = (0,35 * (2000,0 - 1000,0 - 1800,0) + 1000,0) * (0,00 - 100,0 / 100)² / 2 = 0,0 Tn/m

1 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Hor. seismic coeff. kh = 0,00 Ver. seismic coeff. kv = 0,00

Active seismic coeff. = 0,35

- For stability analysis (seismic)


Seismic force 0,35 * 1800,0 * 5,00² / 2 * (1 - 0,0 ) = 8,0 Tn/m
8,0 * Cos (0,262 + 0,124) = 7,4 Tn/m
8,0 * Sin (0,262 + 0,124) = 3,0 Tn/m
Water force
Pwe = 0,00 * (2000,0 - 1800,0) * (0,00)² / 2 = 0,0 Tn/m
- For stem design (seismic)
Seismic force 0,35 * 1800,0 * 4,00² / 2 = 5,1 Tn/m
5,1 * Cos (0,262 + 0,124) = 4,7 Tn/m
5,1 * Sin (0,262 + 0,124) = 1,9 Tn/m
Water force
Pwe = 0,00 * (2000,0 - 1800,0) * (0,00 - 100,0 / 100)² / 2 = 0,0 Tn/m

Backfill = 1,0 * 7,4 = 7,4 Tn/m


Arm = 5,00 / 3 = 1,67 m Moment = 7,4 * 1,67 = 12,3 Tn-m/m
Water table = 1,0 * 0,0 = 0,0 Tn/m
Arm = 0,00 / 3 = 0,00 m Moment = 0,0 * 0,00 = 0,0 Tn-m/m
Surcharge = 1,0 * 0,33 * 3000,0 * 5,00 = 5,0 Tn/m
Arm = 5,00 / 2 = 2,50 m Moment = 5,0 * 2,50 = 12,5 Tn-m/m
Strip load = 0,0 Tn/m
Arm = 2,00 m Moment = 0,0 * 2,00 = 0,0 Tn-m/m
Wind load = 1,0 * 0,0 * 1,52 = 0,0 Tn/m
Arm = 100,0 / 100 + 4,00 - 1,52 / 2 = 4,24 m
Moment =0,0 * 4,24 = 0,0 Tn-m/m
Backfill seismic = 0,0 * (7,4 - 7,4) = 0,0 Tn/m
Arm = 0.6 * 5,00 = 3,00 m Moment = 0,0 * 3,00 = 0,0 Tn-m/m
Water seismic = 0,0 * 0,0 = 0,0 Tn/m
Arm = 0,00 / 3 = 0,00 m Moment = 0,0 * 0,00 = 0,0 Tn-m/m

Wall seismic = 0 Tn
Moment = 0 Tn-m/m
Hor. resultant Rh = 7,4 + 0,0 + 5,0 + 0,0 + 0,0 + 0,0 + 0,0 + 0,0 = 12,4 Tn/m
Overturning moment OTM = 12,3 + 0,0 + 12,5 + 0,0 + 0,0 + 0,0 + 0,0 + 0,0 = 24,8 Tn-m/m
Arm of hor. resultant = 24,8 / 12,4 = 2,00 m

2 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Stem weight 1,0 * 50,0 / 100 * 4,00 * 2,41 = 4,8 Tn/m


Arm = 1,00 + 50,0 / 100 / 2 = 1,25 m Moment = 4,8 * 1,25 = 6,0 Tn-m/m
Stem taper 1,0 * (100,0 - 50,0) / 100 * 4,00 / 2 * 2,41 = 2,4 Tn/m
Arm = 1,00 + 50,0 / 100 - (100,0 - 50,0) / 100 * 2 / 3 = 1,67 m
Moment =2,4 * 1,67 = 4,0 Tn-m/m
CMU stem at top = 0,0 Tn/m
Arm = 1,00 + 0,0 / 100 / 2 = 0,00 m
Moment =0,0 * 0,00 = 0,0 Tn-m/m
Ftg. weight 1,0 * 4,00 * 100,0 / 100 * 2,41 = 9,6 Tn/m
Arm = 4,00 / 2 = 2,00 m Moment = 9,6 * 2,00 = 19,2 Tn-m/m
Key weight 1,0 * 50,00 / 100 * 50,0 / 100 * 2,41 = 0,6 Tn/m
Arm = 1,00 + 50,0 / 100 / 2 = 1,25 m Moment = 0,6 * 1,25 = 0,8 Tn-m/m
Soil cover = 1,0 * 1,00 * 1,50 * 1800,0 = 2,7 Tn/m
Arm = 1,00 / 2 = 0,50 m Moment = 2,7 * 0,50 = 1,4 Tn-m/m
Stem wedge = 1,0 * (100,0 - 50,0) / 100 * 4,00 / 2 * 1800,0 = 1,8 Tn/m
Arm = 1,00 + 100,0 / 100 - (100,0 - 50,0) / 100 / 3 = 1,83 m
Moment =1,8 * 1,83 = 3,3 Tn-m/m
Backfill weight = 1,0 * 2,00 * 4,00 * 1800,0 = 14,4 Tn/m
Arm = 4,00 - 2,00 / 2 = 3,00 m Moment = 14,4 * 3,00 = 43,2 Tn-m/m
Backfill slope =
= 1,0 * (2,0 + (100,0 - 50,0) / 100) * 0,00 / 2 * 1800,0 = 0,0 Tn/m
Arm = 4,00 - (2,00 + (100,0 - 50,0) / 100) / 3 = 3,17 m
Moment =0,0 * 3,17 = 0,0 Tn-m/m
Water = 1,0 * 2,00 * (0,00 - 100,0 / 100) * (2000,0 - 1800,0) = 0,0 Tn/m
Arm = 4,00 - 2,00 / 2 = 3,00 m Moment = 0,0 * 3,00 = 0,0 Tn-m/m
Seismic Pae-Pa = 0,0 * (3,0 - 3,0) = 0,0 Tn/m
Arm = 4,00 m Moment = 0,0 * 4,00 = 0,0 Tn-m/m
Backfill Pav = 1,0 * 3,0 = 3,0 Tn/m
Arm = 4,00 m Moment = 3,0 * 4,00 = 12,0 Tn-m/m
Concentrated = 1,0 * 0,0 + 0,0 * 0,0 = 0,0 Tn/m
Arm = 1,00 + (50,0 - 0,0) / 100 = 1,50 m
Moment =0,0 * 1,50 = 0,0 Tn-m/m

3 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Surcharge = 1,0 * (2,0 + (100,0 - 50,0) / 100) * 3000,0 = 7,5 Tn/m


Arm = 4,00 - (2,00 + (100,0 - 50,0) / 100) / 2 = 2,75 m
Moment =7,5 * 2,75 = 20,6 Tn-m/m
Strip = 1,0 * 0,0 * 2,00 = 0,0 Tn/m
Arm = 4,00 - 2,00 / 2 = 3,00 m Moment =0,0 * 3,00 = 0,0 Tn-m/m
Buoyancy = 1,0 * 1000,0 * 0,00 * 4,00 = 0,0 Tn/m
Arm = 4,00 / 2 = 2,00 m Moment =0,0 * 2,00 = 0,0 Tn-m/m
Ver. resultant Rv = 46,8 Tn/m
Resisting moment RM = 110,5 Tn-m/m
Arm of ver. resultant = 110,5 / 46,8 = 2,36 m
Overturning ratio = 110,5 / 24,8 = 4,45 > 2,00 OK

4,00 110,5 - 24,8


Eccentricity = - = - = 0,17 m
2 46,8
Bearing length = Min (4,00, 3 * (4,00 / 2 - 0,17)) = 4,00 m
46,8 6 * 46,8 * 0,17
Toe bearing = + = + = 14,7 Tn/m2 < 18,5 Tn/m2OK
4,00 4,00²
46,8 6 * 46,8 * 0,17
Heel bearing = - = - = 8,7 Tn/m2
4,00 4,00²

4 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Passive coefficient 1 / 0,33 = 3,00 Tn/m2


Passive depth 1,50 + (100,0 + 50,0) / 100 - 0,50 = 3,00 m
Passive pressure top = 3,00 * 1800,0 * 0,50 = 2,70 Tn/m2
Passive pressure bot = 3,00 * 1800,0 * (3,00 + 0,50) = 16,20 Tn/m2
Passive force = (2,70 + 16,20) / 2 * 3,00 = 23,6 Tn/m
Friction force = Max (0, 46,8 * 0,50) = 23,4 Tn/m
Sliding ratio = (23,6 + 23,4) / 12,4 = 3,80 > 2,00 OK

Backfill = 1,6 * 4,7 = 7,6 Tn/m


Arm = 4,00 / 3 = 1,33 m Moment = 7,6 * 1,33 = 10,1 Tn-m/m
Water table = 1,6 * 0,0 = 0,0 Tn/m
Arm = (0,00 - 100,0 / 100) / 3 = 0,00 m Moment = 0,0 * -0,33 = 0,0 Tn-m/m
Surcharge = 1,6 * 0,33 * 3000,0 * 4,00 = 6,4 Tn/m
Arm = 4,00 / 2 = 2,00 m Moment = 6,4 * 2,00 = 12,8 Tn-m/m
Strip load = 0,0 Tn/m
Arm = 2,00 m Moment = 0,0 * 2,00 = 0,0 Tn-m/m
Wind load = 0,0 * 0,0 * 1,52 = 0,0 Tn/m
Arm = 4,00 - 1,52 / 2 = 3,24 m Moment =0,0 * 3,24 = 0,0 Tn-m/m
Backfill seismic = 1,0 * (4,7 - 4,7) = 0,0 Tn/m
Arm = 0.6 * 4,00 = 2,40 m Moment = 0,0 * 2,40 = 0,0 Tn-m/m
Water seismic = 1,0 * 0,0 = 0,0 Tn/m
Arm = (0,00 - 100,0 / 100) / 3 = 0,00 m Moment = 0,0 * -0,33 = 0,0 Tn-m/m
Max. shear = 7,6 + 0,0 + 6,4 + 0,0 + 0,0 + 0,0 + 0,0 = 14,0 Tn/m
Shear at critical section = 14,0 - 14,0 / 4,00 * 80,5 / 100 = 11,2 Tn/m
Max. moment = 10,1 + 0,0 + 12,8 + 0,0 + 0,0 + 0,0 + 0,0 = 22,9 Tn-m/m
Shear strength ACI Eq. (11-3)
φ Vn = 0,75 * 0.53 * (250)½ / 10 * 80,5 = 50,6 Tn/m > 11,2 Tn/m OK
Use D20 @ 20,0 cm As = 15,71 cm²/m 15,71 / (100 * 92,0) = 0,0017
Bending strength ACI 10.2.7
φ Mn = 0,90 * 92,0² * 250,0 * 0,027 * (1 - 0.59 * 0,027) = 49,9 Tn-m/m > 22,9 Tn-m/m OK
Hooked 0.075 * 3900,0 / (250,0)½ * 2,00 * 0.7 * 0,46 = 16,0 cm ACI 12.5
Dev. length at footing = = 100,0 - 7,0 = 93,0 cm> 16,0 cm OK
ACI 10.5
= Min (Max ((14 / 3900, 0.8 * (250,0)½ / 3900) * 100 * 92,0, 1.33 * 7,1) = 9,5 cm²/m
0.0018 * 100,0 * 100,0 = 18,00 cm²/m ACI 7.12.2.1
Min. steel area ratio = 18,00 / 15,71 = 1,15 > 1.0 NG

5 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Bearing force = 0.0 Tn/m (Neglect bearing pressure for heel design)
Arm =
= (21,0 * 2,00² / 2 + (15,3 - 21,0) * 2,00² / 6) / 0,0 = 1,05 m
Moment = 0,0 * 1,05 = 0,0 Tn-m/m
Concrete weight = 1,4 * 100,0 / 100 * 2,00 * 2,41 = 6,7 Tn/m
Arm = = 2,00 / 2 = 1,00 m Moment =6,7 * 1,00 = 6,7 Tn-m/m
Backfill weight = 1,4 * 2,00 * 4,00 * 1800,0 = 20,2 Tn/m
Arm = = 2,00 / 2 = 1,00 m Moment = 20,2 * 1,00 = 20,2 Tn-m/m
Backfill slope =
= 1,4 * (2,0 + (100,0 - 50,0) / 100) * 0,00 / 2 * 1800,0 = 0,0 Tn/m
Arm = 2,00 * 2 / 3 = 1,33 m Moment =0,0 * 1,33 = 0,0 Tn-m/m
Water = 1,4 * 2,00 * 0,00 * (2000,0 - 1800,0) = 0,0 Tn/m
Arm = = 2,00 / 2 = 1,00 m Moment = 0,0 * 1,00 = 0,0 Tn-m/m

6 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Surcharge = 1,4 * (2,0 + (100,0 - 50,0) / 100) * 3000,0 = 10,5 Tn/m


Arm = = 2,00 / 2 = 1,00 m Moment =10,5 * 1,00 = 10,5 Tn-m/m
Strip = 1,4 * 0,0 * 0,00 = 0,0 Tn/m
Arm = 0,00 - (100,0 - 50,0) / 100 + 0,00 / 2 = 1,00 m
Moment = 0,0 * 1,00 = 0,0 Tn-m/m
Max. Shear Vu = -0,0 + 6,7 + 20,2 + 0,0 + 0,0 + 10,5 + 0,0 = 37,4 Tn/m
Max. Moment Mu = -0,0 + 6,7 + 20,2 + 0,0 + 0,0 + 10,5 + 0,0 = 37,4 Tn/m
Shear strength ACI Eq. (11-3)
φ Vn = 0,75 * 0.53 * (250)½ / 10 * 92,2 = 57,9 Tn/m > Vu = 37,4 Tn/m OK
Use D16 @ 15,0 cm As = 13,42 cm²/m 13,42 / (100 * 92,2) = 0,0015
Bending strength ACI 10.2.7
φ Mn = 0,90 * 92,2² * 250,0 * 0,023 * (1 - 0.59 * 0,023) = 42,8 Tn-m/m > Mu = 37,4 Tn-m/m OK
Cover factor = Min (2.5, (7,0 + 1,60 / 2, 15,0 / 2) / 1,60) = 2,5
Straight ACI Eq. (12-1)
= Max (30, 3900,0 / 3.5 / (250)½ * 0,8 * 1,3 / 2,5 * 1,60 * 0,87) = 46,9 cm
Hooked 0.075 * 3900,0 / (250,0)½ * 1,60 * 0.7 * 0,87 = 20,7 cm ACI 12.5
Dev. length at toe side = = (4,00 - 2,00) * 100 - 7,0 = 193,0 cm
> 20,7 cm OK
Dev. length at heel side = = 2,00 * 100 - 7,0 = 193,0 >cm20,7 cm OK
ACI 10.5
= Min (Max ((14 / 3900, 0.8 * (250,0)½ / 3900) * 100 * 92,2, 1.33 * 7,5) = 15,6 cm²/m
0.0018 * 100,0 * 100,0 = 18,00 cm²/m ACI 7.12.2.1
Min. steel area ratio = 18,00 / 13,42 = 1,34 > 1.0 NG

Bearing force = (20,8 + 17,6) / 2 * 1,00 = 19,2 Tn/m


Arm =
= (17,6 * 1,00² / 2 + (20,8 - 17,6) * 1,00² / 3) / 19,2 = 0,51 m
Moment = 19,2 * 0,51 = 9,9 Tn-m/m
Water Buoyancy = 1,2 * 1000,0 * 0,00 * 1,00 = 0,0 Tn/m
Arm = = 1,00 / 2 = 0,50 m Moment =0,0 * 0,50 = 0,0 Tn-m/m
Concrete weight = 1,2 * 100,0 / 100 * 1,00 * 2,41 = 2,9 Tn/m
Arm = = 1,00 / 2 = 0,50 m Moment =2,9 * 0,50 = 1,4 Tn-m/m
Soil cover = 1,2 * 1,00 * 2,43 * 1800,0 = 3,2 Tn/m
Arm = = 1,00 / 2 = 0,50 m Moment = 3,2 * 0,50 = 1,6 Tn-m/m
Max. Shear Vu = 19,2 + 0,0 - 2,9 - 3,2 = 13,0 Tn/m
Shear at crit. section Vu = 13,0 * (1,00 - 92,2 / 100) / 1,00 = 1,0 Tn/m
Max. Moment Mu = 9,9 + 0,0 - 1,4 - 1,6 = 6,8 Tn/m
Shear strength ACI Eq. (11-3)
φ Vn = 0,75 * 0.53 * (250)½ / 10 * 92,2 = 57,9 Tn/m > Vu = 1,0 Tn/m OK
Use D16 @ 20,0 cm As = 10,06 cm²/m 10,06 / (100 * 92,2) = 0,0011
Bending strength ACI 10.2.7
φ Mn = 0,90 * 92,2² * 250,0 * 0,017 * (1 - 0.59 * 0,017) = 32,2 Tn-m/m > Mu = 6,8 Tn-m/m OK 7 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

Cover factor = Min (2.5, (7,0 + 1,60 / 2, 20,0 / 2) / 1,60) = 2,5


Straight ACI Eq. (12-1)
= Max (30, 3900,0 / 3.5 / (250)½ * 0,8 * 1,0 / 2,5 * 1,60 * 0,21) = 36,1 cm
Hooked 0.075 * 3900,0 / (250,0)½ * 1,60 * 0.7 * 0,21 = 20,7 cm ACI 12.5
Dev. length at heel side = = (4,00 - 1,00) * 100 - 7,0 = 293,0 cm
> 20,7 cm OK
Dev. length at toe side = = 1,00 * 100 - 7,0 = 93,0 cm
> 20,7 cm OK
ACI 10.5
= Min (Max ((14 / 3900, 0.8 * (250,0)½ / 3900) * 100 * 92,2, 1.33 * 2,0) = 2,8 cm²/m
0.0018 * 100,0 * 100,0 = 18,00 cm²/m ACI 7.12.2.1
Min. steel area ratio = 18,00 / 10,06 = 1,79 > 1.0 NG

Shear key depth = 50,0 cm Shear key thickness = 50,0 cm


Passive force = 1,6 * (16,2 + 13,5) / 2 * 50,0 / 100 = 11,9 Tn/m
Shear at crit. section Vu = 11,9 * (50,0 - 41,8) / 50,0 = 2,0 Tn/m
Arm =
= (13,5 * 50,00² / 2 + (16,2 - 13,5) * 50,00² / 3) / 11,9 = 0,16 m
Max. moment Mu = 11,9 * 0,16 = 1,9 Tn-m/m
Shear strength ACI Eq. (11-3)
φ Vn = 0,75 * 0.53 * (250)½ / 10 * 41,8 = 26,3 Tn/m > Vu = 2,0 Tn/m OK
Use D12 @ 20,0 cm As = 5,65 cm²/m 5,65 / (100 * 41,8) = 0,0014
Bending strength ACI 10.2.7
φ Mn = 0,90 * 41,8² * 250,0 * 0,021 * (1 - 0.59 * 0,021) = 8,2 Tn-m/m > Mu = 1,9 Tn-m/m OK

8 of 9
SPECTRA Project: DPT Kavling Cimahi Page # ___
Engineer: RJP 17/06/2019
Descrip: DPT Kavling Cimahi
ASDIP Retain 3.7.1 CANTILEVER RETAINING WALL DESIGN www.asdipsoft.com

General Analysis .............. IBC-12


Concrete Design .............. ACI 318-11 1 D+H+W 1 1.4D
Masonry Design ............... MSJC-11 2 D+L+H+W 2 1.2D+1.6(L+H)
Load Combinations .......... ASCE 7-05 3 D+H+0.7E 3 1.2D+0.8W
4 D+L+H+0.7E 4 1.2D+L+1.6W
5 1.2D+L+E
Stem Footing 6 0.9D+1.6H+1.6W
Concrete f'c .... Kg/cm² 7 0.9D+1.6H+E
Rebars fy ........ Kg/cm²
Masonry f'm .... Kg/cm²

9 of 9