Standard Operationg Procedure For Excavation For Lean Meg Pump Foundations
Standard Operationg Procedure For Excavation For Lean Meg Pump Foundations
The purpose of this procedure is to establish the precautions and conditions considered
necessary for safety of the personnel involved in excavation work as well as integrity of above
/ underground services &/or facilities where such excavation work shall be carried out. The
procedure is also aimed to define the roles & responsibilities of personnel associated with
requesting, approving and carrying out excavation.
The procedure is applicable to all activities & facilities where excavation is carried out for
maintenance, construction or inspection need. It is to note that requirement of work
permit for excavation work shall be dealt in compliance with “Permit to Work Procedure”.
2. DEFINITIONS
3. KEY RESPONSIBILITIES
The above – mentioned list is not exhaustive and it is recommended to carry out a site specific
risk evaluation to identify additional hazards as well as to incorporate mitigation accordingly.
f) Excavated material shall be placed at a distance not less than 1m from the edge of the
excavation for depth up to 1.2 meter. Accordingly placement of excavated material shall be
increased proportion to the depth of excavation.
g) Heavy equipment, material or excavating machinery shall be kept clear from the excavation
area by at least 3 metres away.
h) The access to plant, equipment and emergency services must not be obstructed by the
trenches.
i) Personnel carrying out excavation work must use PPE.
night and provide flashing hazard light. Any person entering the barricaded area must follow
safety procedures to eliminate fall from height hazard in line with requirements.
5. EQUIPMENT SPREAD
ITEM CAPACITY
Excavator - 1 Nos Ex110
Tractor -1 nos 1 unit capable
6. TECHNICAL INFO
7. SCOPE OF PROCEDURE
Initial Status
Markings as per drawings made.
Preparation Works
No Work if it is raining.
No work if excavated area is not fully visible.
DEVELOPMENT OF KG-DWN-98/2
FOR ONGC AT ODALAREVU
8. TASK PLAN
RESPONSIBLE
Remarks/DWG
STEP TASK DESCRIPTION PARTY /
no.
EQUIPMENT
Tool box talk prior to the work. Need to explain roles &
1 HSE
responsibilities of crew involved in operation.
Ensure the markings as per the drawings or not before start of
2
the work.
Excavation in marked location and excavated soil to be
3 loaded on to the tractor and same should be shifted to safe
place/ not in excavated area
Excavation to be as per pre-plan and sloping/ bench type
4
excavation to be done as per the site condition Site Engineer
After finishing of desired measurements need to check with
5
levelling instrument.
If dressing needed for inside excavated area to be done upon
6
checking the safe work conditions.
If the excavated footing area required shoring then need to be
7
arrange.