Topcon GTS 229 Survey Manual: Internal
Topcon GTS 229 Survey Manual: Internal
internal
• report
Manual
•
G Fox
•
October 2001
•
supervising scientist
• ~.--.---... -.-.
~~";::::;;;;~------'-'--'
•
•
Prepared by G. Fox
•
Hydrological and Ecological Processes.
Environmental Research Institute of the Supervising Scientist.
Locked Bag 2.
• Jabiru NT 0886.
October 2001.
•
File Reference: IP-1O-040
•
•
• Table of Contents
• 1 Introduction 3
11
• 3.2 On PC 13
4 References 17
•
• 2
1 Introduction
•
In June 2001 the Hydrological and Ecological Processes (HEP) group updated the Topcon GTS-
3 theodolite and FC-5 data collector that has been in operation for approximately 10 years. This
equipment has been used for accurate topographic surveying of erosion plot studies at Swift
•
Creek (Ngarradj) and its tributaries, Ranger Mine waste rock dump, Tin Camp Creek, Nabarlek
and Scinto 6.
The new total station is a Topeon GTS-229 which operates in a similar way to the GTS-3 but
•
some of the methods and commands are different.
This report is principally designed to be a user friendly instruction manual for the use of the new
total station, providing a description of the commands required to conduct a survey in the field •
using the new equipment. It is assumed that the user has a basic knowledge of surveying,
including the initial set-up of the theodolite. This manual also covers the downloading of the
survey pickups to the PC via Civilcad software and then to Excel spreadsheet format. •
Should problems occur with the collection of survey data a more detailed manual for the GTS-
229 is available in the HEP office. For any problems with the downloading of survey data
Civilcad manuals are also available in the HEP department. There is a Civilcad toll free support
hot linen (ph 1800 068007). A support identification number will need to be quoted when using
•
this service ( 05288-02267).
The supplier of this equipment (GTS-229 and Civilcad) is also a valuable source of information
3
•
• 2 Set-up and collection of survey data
Ensure the instrument is set-up level and directly over the centre of a set-up point and tum the
• instrument on. For any general surveying using the new total station there are four consecutive
•
(2) Enter occupied station details - is the location of the instrument in terms of x, y, z
coordinates.
(3) Enter backsight details - is the location of a known point near the instrument in terms
(a) MENU
• ro
V :
Bl\:
oSET
90°10'20"
120 0 30'40"
• lei
em
I
aD
I
aD
I
em
I POWER
(ANa) rn~
• (0 C
KBNU 1/3 ... ...
P1zDA'l'A COLLBCT (k) (MEtIJ)
P2:LAYOtrr A
•
P3zMEMORY MOR. P'!'
I I
,
(A) (ESC)
POWER
~
@Jv aD em (ANG) (I)«5
•
• 4
(c) Select a file FI INPUT
•
Use up and down scroll arrows (as shown below) and function keys to scroll through
numbers and letters to input a job name (FN).
When finished F4 ENTER
•
SELECT A PI:t.B
J'He SM01
•
2.2 Enter occupied station details
5
•
• (c) F3 NEZ
No further input is required from this screen.
• C>
ace.PT
1''1'#: 100
...
(b) (MB«J)
., C
..
INPO"1' LIST HZ BN'l'Blt
I I @ I
,
~ (ESC)
POWER
aD em aD aD (ANO) <E
• 0> 'f!
(d) FI INPUT Input N (northing), E (easting) and Z (elevation) values for the set up
point and press F4 ENTER after each entry.
• N-I1000 III
... .,
( ~) (MEt«J)
E: 500
z: 9
1'4
1'4 .
:INPtJ'l' - - - PT# EN'l'BR
I
,
~ (ESC)
POWER
• em
I
(ill (ANO) CID
(e) After inputting the z value and hitting the enter key the screen will revert back to
previous screen shown below. Occupied station details have now been completed.
g
PT' -I 100 ... ., g
(~) (MEIIJ)
:ID : SM01
:INS.BT: 1.471
I I I
CID <ill aD aD
I ~~
CEfj
(ANO)
b
• (f) You have now completed inputting the occupied point set up details.
•
• 6
2.3 Enter Backsight Details
•
(a) F2 BACKSIGHT
p
DATA COLLECT 1/2 • .. g •
1'1 : ace • PT# IHP1J'1' ("-) (MEtIJ)
"2 : BACKSlaB'l'
•
CZ>
1'3:I'S/SS
I @
p.J.
, (ESC)
•
I POWER
I
b
em em CID em (ANO) CE~
(b) Fl INPUT
BS# Use the number 101 for all backsight points F4 ENTER
PCODE is the section name (ie SMOl) F4 ENTER
R.HT is the prism height. (Note that the prism height does not need to be the same as
total station height).
•
Once the R.HT has been entered F4 BS
IQ>
BS#
PconB
~ 101
: SM01
•
Cb) (MEJIJ)
. g
•
!l.ft : 1.523 •
CZ>
:INPUT aSET HEAS BS
, (ESC)
POWER
@~ JvC® (ANO) (I)C5
b
•
(c) F3 NE/AZ
~
BACltSZGBT
pTI: 101 ©
. . (J
(MBIJ) •
A
IJDOT LIST D/AZ D1T
I I ® I
@
, (esc)
POWER
D
em CED em (ill (ANG) CE
e
•
7
•
• (d) For surveying cross·sections a backsight bearing is generally used. Press F3 AZ and go
to step (e).
However, if known, the northing and easting co·ordinates can be entered. STOP now
and position prism on backsight plinth. Carefully aim instrument at centre of prism
N ~ 1000
B : 500
III.
III.
~ .
(];) (MIHI)
• BAC:KSIGBT ~ ..
( "- ) (MEt«J)
BR: 180.00
&
INPUT ---
I
PT'
I
BN'l'BJt
,
G!) (ESC)
POWER
• ill) em (ANa) CE
• BS' ~ 101 ~ .
PCODE : SMOl <b) (MEtIl)
R.B'!' : 1.523 III. &
G!)
INPUT OSET MB.AS BS
, (ESC)
• I
em ern
I I
aD (ANa)
POWER
<E
•
• 8
(g) F3 *NEZ Once this operation is completed the backsight is now set and measured.
•
It' ... CI
•
BS'
I'CODB :
R.B'l'
-I 101
SmO 1
: 1.523 m
Cb) (MENJ)
• (ESC)
•
--- CZ>
VB
I I@ I
SD *NBZ
, POWER
aD (ill aD ClD (ANO) CE
0 c
D
DATA COLLBCT 1/2 ... •
( 1t-) (MEHJ)
CI •
1'1: acc . PTI IJllPtlT
1'2:BACKSIGB'l'
pJ, •
CZ>
1'3:I'S/SS
I @ , (ESC)
POWER
~
aD
I
aD aD
I
aD (ANG) CI)c
•
(b) FI INPUT
PT# Use the number 102 for first survey point F4 ENTER
PCODE is the section name (ie SMOl) F4 ENTER
R.HT is the prism height. (Note that the prism height does not need to be the same as
total station height).
•
Once the R.HT has been entered sight total station at prism then F3 MEAS
PT' -I 102
PCODB : SM01
... •
( 1t-) (MBIJ) •
R.H'1' t 1.523
•
CL>
l:m?OT SRCH MIlAS ALL
, (ESC)
POWER
(ANa) (E)
•
(c) F3 *NEZ
D g
... •
1''1'' -I 102
PCODE : SM01
R.1l'l' ; 1.523 m
(k...) (MENJ)
• •
VB
I I
SD *NBZ OI'SET
@ I
,
(L) (esc)
POWER
aD aD (ill aD (ANa) c:m:Jt:l
0
9
•
• (d) A series of beeps means the point has been taken. The staff can now be moved to the
next point. The screen will be the same as below. Note that the point number has
increased by one - the total station will do this automatically for each survey point until
the pickup has been completed. To continue the survey F3 MEAS If you need to
• change the point code or prism height for a particular survey point this can be done by
using the Fl INPUT key and F4 ENTER keys. Then F3 MEAS
p Cl
PT# -+ 103 ... ...
Cb) (MBIJ)
•
PCODE : SM01
R.HT : 1.532
•
INPUT SRCH DAB ALL
I I ~ I
,
(Z) (esc)
POWER
lr.ll
aD CID em aD (ANG] (I)tl
• (e) F3 *NEZ
PT# ~ 103
... ...
(b) (NEtIJ)
• PCODE : SMOl
R.H'l'
VH
: 1.523 m
SD dlEZ OFSBT
•
,
~ (ESC)
I I I POWER
aD <ID aD (ANG] (I)
• (f) Repeat steps (d) and (e) until survey has been completed then ESC This will signal to
the machine that the survey of the job has been completed. The machine can now be
turned off or a new job can be entered.
•
• 10
3 Downloading the survey data
•
Each day the survey data should be downloaded from the total station and stored in an
appropriate format on the eriss network for further analysis. There are three steps in the
download process which must be followed.
•
3.1 On Total station
(a) Connect total station to computer via Rs232 cable and tum power on.
(b)
Instrument does not need to be levelled.
MENU
•
D CI
VI
SR:
90°10'20"
120°30'40" (~)«~»
•
•
CZ>
OSE'l'
I
BOLD BSBT
I I
plJ.
I
, (ESC)
POWER
GD em Cfi) (ll) (ANa) CID
Q e
I I <dID
p~
, (ESC)
POWER
em CID CID aD (ANG) (E)~
OJ
1'2 : IHI'l'IALIZB
00 •
I
pJ.
I
, (ESC)
POWER
•
b
@ck <ID aD @ ClJ
tl
11
•
• (g) FI SEND DATA
g ~
... ...
• DATA TRANSFER
1'1: smm DATA
1'2 : LOAD DATA
1'3 :COIIII. PUAIIB'l'DS
(b)
@
~
0-0
(esc)
@Jv em
I
aD
I • POWER
(ANa) <E~
D
• (h) FI MEAS DATA
~ ~
... ...
• sam OATA
1'1:JIBAS. OATA
1'2 : COORJ). OATA
1'3:PCOm; DATA
(b)
@
~
Cii>
(esc)
@Jv em
I I
CiD
•
(ANa)
POWER
<E
Cl ~
• (i) Select a file. F2 LIST Use up and down scroll keys to select job
for download. Then F4 ENTER
• SBLBC'l' A I'lL.
I'H:____ (b)
... ...
oao
-_--_Dr.l'_BJl_.....
....l_NP_tJ'l'_L_I_8'I'
__ ®:
~<E
•
m Send measured data F3 [YES] Do not hit F3 button until steps (a) to (k) in section
3.2 on the PC have been completed.
• ~
SDJD DAB. DATA <III ...
(b) (t.8IIO
~
>Olt ? ~
--- --- [YBS) [NO) CZ>@
I
<ID
I@ I
CID CiD
Cfi)
•
(ANG)
POWER
CI)e
• 0
(k) When download is complete turn total station off and disconnect.
• 12
3.2 On PC
(b) SYSTEM
(c) JOBS
(d) ADD JOB Type in job name . For consistency ensure the job name is the same as that
for the fil e being downloaded from the total station.
OK
DOS PRQIIFl'
.JOI COJIFJO vtn .01
nu: tn'1L •• OlTlDa
EDrr Cu.rJG LIS!' 'OIS
_S DELl'n: .08
u :. CURiDI JOII I
... .
(f) Check top right of screen that current fi le name is correct.
13
(g) SURVEY
U) DATA IN Type in name for jobs for both .FCS file and .NEU file.
Keep name same as in total station
OK
(I) As soon as step (e) is completed initiate data transfer from total stat ion. (Sec step G) on
total station).
'1oO'ITDQ• •
ALI...:IIT ••
ClOSS lien ••
-
. .maIOI ••
DUibitn....
....nat Z 1101) ••
..
COIl IElGHfS ••
......
t'O.......
...,.....
,..
.........
lE.mOll
14
(m) Data can be seen on screen downloading.
-- """"
15
(0) OPEN FILE
YES
. . . . . . . . lI• • Ii'"
C,\~._
@--
(p) Data will now be loaded into the neutral editor. To ensure data is in correct fo rmal to
import into Exce l it must be saved again and the .neu file is overwritten .
'.H'.
....m.......
oo.~
.......
.......
.. ".B1, ... 1000.00II, ...
I· 4N. 71J. Woo .... " .1. . . .
•• M.1I.
I .• •
CO-~
COe~
-......-........
....... I . . . .. ,.02 . . . ..., "1, ... ..,...~
. . tn.lSI. 1·1000. . . . . ~
.....,...........-.
I. 471._. l·lOOO.OD$. . . •. m.~
a.
I. a ..... ".87' ... "_.'*'-"
4'H.a1 . . . . . . . . n ...
•• _ • ..-J.
••• "'.HJ.... ~
-
I_ cn.~
16
(q) FILE
4 References
Topeon . Instruction manual. Electronic Tota l Stat ion. GTS-220 series. Topeon
corporation Tokyo. Japan.
C ivi lcad . Civilcad 5.6 User man ual. September 2000. Topeon Austra lia ?TV LTD.
NSW . Australia.
17