Payslip For The Month of Jul 2019: Sterling and Wilson Pvt. LTD 13th Floor, P L Lokhande Marg, Chembur (W)
Payslip For The Month of Jul 2019: Sterling and Wilson Pvt. LTD 13th Floor, P L Lokhande Marg, Chembur (W)
Sterling and Wilson Pvt. Ltd ; 13th Floor, P L Lokhande Marg, Chembur(W)
Payslip for the month of Jul 2019
Earnings Deductions
Description Rate Monthly Arrear Total Description Amount
Basic 10,136.00 10,136.00 1,035.00 11,171.00 PF Employee Contr 2,227.00
HRA 4,055.00 4,055.00 697.00 4,752.00 Ptax 200.00
Conveyance Allowance 0.00 0.00 -1,600.00 -1,600.00
Furnishing Allowance 7,485.00 7,485.00 -97.00 7,388.00
Wash Allowance 1,000.00 1,000.00 1,000.00 2,000.00
Bonus_M 0.00 931.00 0.00 931.00
Shft_Allow 0.00 2,194.00 0.00 2,194.00
Net Pay : 24,409.00 (TWENTY FOUR THOUSAND FOUR HUNDRED NINE ONLY)
Income Tax Worksheet for the Period April 2019 - March 2020