0% found this document useful (0 votes)
41 views

Move Size For EB1: Tag Name Tag Description EU SP

The document describes move sizes for changing process parameter setpoints. It provides two tables listing process tags, their descriptions, and proposed move sizes for the tags. The move sizes shown will be used to step each tag up or down from its current setpoint and hold it for 30 minutes before returning the tag to its original setpoint value. This will allow testing the impact of parameter changes on the two processes, labeled EB1 and SM1.

Uploaded by

Dio Masera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

Move Size For EB1: Tag Name Tag Description EU SP

The document describes move sizes for changing process parameter setpoints. It provides two tables listing process tags, their descriptions, and proposed move sizes for the tags. The move sizes shown will be used to step each tag up or down from its current setpoint and hold it for 30 minutes before returning the tag to its original setpoint value. This will allow testing the impact of parameter changes on the two processes, labeled EB1 and SM1.

Uploaded by

Dio Masera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Move size for EB1

Tag Name Tag Description EU SP

1 FC1001 Fuel flow NM3/H SP


2 FIC1002 Air flow NM3/H SP
3 FC9001 Fuel flow NM3/H SP
4 FIC9002 Air flow NM3/H SP
5 FICA2006 C2H4 FLOW TO BED 1 TPH SP
6 FIC2007 C2H4 FLOW TO BED 2 TPH SP
7 FIC2009 C2H4 FLOW TO BED 3 TPH SP
8 FIC2011 C2H4 FLOW TO BED 4 TPH SP
9 FIC2013 C2H4 FLOW TO BED 5 TPH SP
10 FIC2015 C2H4 FLOW TO BED 6 TPH SP
11 FICA2022 TOTAL BENZENE TO DC101 TPH SP
12 FICA2008 Benzene quench flow to bed 2 TPH SP
13 FICA2010 Benzene quench flow to bed 3 TPH SP
14 FICA2012 Benzene quench flow to bed 4 TPH SP
15 FICA2014 Benzene quench flow to bed 5 TPH SP
16 FICA2016 Benzene quench flow to bed 6 TPH SP
17 PICA2025 BENZENE RECOVERY PRESSURE KG/CM2 SP
18 FICA2025 BENZENE RECOVERY REFLUX TPH SP
19 FIC2024 DA201 REBOILER HOT OIL flow DEGC SP
20 PICA2033 EB RECOVERY COLUM PRESSURE KG/CM2 SP
21 FICA2042 EB RECOVERY DA242 REFLUX TPH SP
22 FIC2041 HOT OIL FLOW TO REBOILER DA242 DA202 TPH SP
23 FIC2039 DA201 BOTTOM FLOWRATE TPH SP

Move size for SM1


Tag Name Tag Description EU SP

1 FICA318 FA301 TOTAL EB FEED TPH SP


2 FICA310 Condensate flow to evaporator EA301 TPH SP
3 TIC306 COIL A STEAM TEMPERATURE DEGC SP
4 FICA301 MS STEAM FLOW TPH SP
5 FIC3002A COMBUSTION AIR FLOW FOR COIL A NM3/H SP
6 TIC303 COIL B STEAM TEMPERATURE DEGC SP
7 FIC3002B COMBUSTION AIR FLOW FOR COIL B M3/H SP
8 PICA308 OFF GAS COMPRESSOR SUCTION PRESSURE KG/CM2 SP
9 FICA402 EB/SM COLUMN REFLUX TPH SP
10 PICA401 DA401 COLUMN PRESSURE KG/CM2 SP
11 FICA420 REBOILER STEAM FLOW TO EA402 TPH SP
12 PICA402 EB RECOVERY COLUMN PRESSURE KG/CM2G SP
13 LICA405 EB RECOVERY COLUMN REFLUX (LEVEL CONTROL TPH SP
14 FICA407 EB RECOVERY COLUMN STEAM REBOILER TPH SP
15 PICA403 SM COLUMN PRESSURE KG/CM2 SP
16 FICA408 SM COLUMN REFLUX TPH SP
17 FICA410 MS FOR SM COLUMN REBOILER TPH SP
18 FICA409 DA-403 BOTTOM FLOW TO ED-401 TPH SP
19 LICA303 CONDENSATE LEVEL IN FA-321 % SP
20 FICA345 Water injection for GB301 kg/h SP

Notes: Each tag will be stepped UP or DOWN depending on the process conditions at the time of stepping. Each tag will be ste
Move size

90
1500
125
1500
0.09
0.09
0.1
0.1
0.13
0.17
12
0.5
0.5
0.5
0.3
0.6
0.05
4
10
0
3
7
1

Move size

0.5
2
2
1
70
2
60
0.05
2
0.02
0.2
0.02
1
50
0.001
0.1
100
0.01
1
100

time of stepping. Each tag will be stepped by the move size and hold it for 30 minutes. After 30 minutes, the tag will be returned to the o
g will be returned to the original positions

You might also like