Davao del Sur Electric Cooperative (DASURECO) invites bids for the acquisition of a data center and fire alarm system for the construction of its new headquarters building. The project budget is 25 million pesos from DASURECO's reinvestment fund. A pre-bid conference will be held on November 7, 2019 and bid opening on November 21, 2019. Interested bidders must purchase bidding documents for 25,000 pesos by November 20 to participate. DASURECO reserves the right to accept, reject, or annul any bid.

Uploaded by

DASURECOWebTeam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
269 views

Itb 2019 08 PDF

Davao del Sur Electric Cooperative (DASURECO) invites bids for the acquisition of a data center and fire alarm system for the construction of its new headquarters building. The project budget is 25 million pesos from DASURECO's reinvestment fund. A pre-bid conference will be held on November 7, 2019 and bid opening on November 21, 2019. Interested bidders must purchase bidding documents for 25,000 pesos by November 20 to participate. DASURECO reserves the right to accept, reject, or annul any bid.

Uploaded by

DASURECOWebTeam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DAVAO DEL SUR ELECTRIC COOPERATIVE, INC.

(DASURECO)
Cogon, Digos City, Davao del Sur

INVITATION TO BID
ITB 2019-08
Resolution No.236
Series of 2019

1. The DAVAO DEL SUR ELECTRIC COOPERATIVE, INC. (DASURECO), through its
Bids and Awards Committee (BAC), invites all prospective bidders to apply for eligibility
and to bid for the following projects with fund source from the Reinvestment Fund of
Sustainable CAPEX (RFSC):

COMPLETION/
ITEM PROJECT DETAILS SOURCE OF APPROVED DELIVERY
NO. FUNDS BUDGET COST SCHEDULE
(INCLUSIVE OF FROM RECEIPT
VAT) OF PURCHASE
ORDER
1. Acquisition of Data Center 25,000,000.00 60 CD
and Fire Alarm System for
Phase II Construction of RFSC
New DASURECO HQ
Building
(2nd Publication)
TOTAL Php 25,000,000.00

2. The scope of work and technical specifications are contained in the Bidding Documents
to be provided to all interested bidders upon application addressed to the Chairman,
Bids and Awards Committee, DASURECO Main Office, Brgy. Cogon, Digos City. Non-
discretionary “pass/fail” criteria will be used pursuant to Section 1 of Annex B of the IRR
of RA 10531 and Article IX – Section 30 of the IRR of RA 9184. Bids received in
excess of the ABC shall be automatically rejected at bid opening.

3. The Pre- Bid Conference shall be on November 7, 2019 at 10 o’clock in the morning,
DASURECO Seminar House, Main Office, Barangay Cogon, Digos City.

4. Bidding proper and Opening of Bids shall be on November 21, 2019 at 10 o’clock in
the morning, venue at DASURECO Seminar House, Main Office, Barangay Cogon,
Digos City.

5. Bidding Documents can be purchased at BAC Secretariat, CPD Building, DASURECO


Main Office, Cogon, Digos City from October 29, 2019 up to November 20, 2019. Only
those who have purchased the Bidding Documents amounting to Twenty-Five
Thousand Pesos (Php25, 000.00) non refundable shall be allowed to participate in
the pre-bid conference and raise or submit written queries or clarification.

6. DASURECO reserves the right to accept and/or reject any Bid, to annul bidding
process, and to reject all Bids at any time prior to the contract award, without
thereby incurring any liability to the affected Bidder/s.

7. Interested bidders may obtain further information from the DASURECO BAC Secretariat
through telephone no. (082) 272-7777 local 138 or email us at [email protected].

(Sgd) MAYPEARL LAARNIE P.MANGKIKIS, CPA, MBA