CSU Shutdown 2019

The document outlines an 11 item maintenance schedule for a plant shutdown from November 24th to December 3rd. It includes tasks such as vessel inspections, repairs, cleaning and scaffolding installation. Resources are allocated on a daily basis with the highest being 110 people needed on November 26th and 27th to complete inspection and cleaning tasks. The schedule aims to complete all items within the planned 9 day period.

Uploaded by

andi dipayadnya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

CSU Shutdown 2019

The document outlines an 11 item maintenance schedule for a plant shutdown from November 24th to December 3rd. It includes tasks such as vessel inspections, repairs, cleaning and scaffolding installation. Resources are allocated on a daily basis with the highest being 110 people needed on November 26th and 27th to complete inspection and cleaning tasks. The schedule aims to complete all items within the planned 9 day period.

Uploaded by

andi dipayadnya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 27

CSU SHUTDOWN 2019

Team
No Item Start Finish Duration
CTR

1 8478627 INS-VES F-6410B/IN-MAJ ( Filter) 26-Nov 28-Nov 3 MEINDO-1


Spading 26-Nov 26-Nov 1 Supervisor : 1
Open Closure and Internal cleaning 26-Nov 26-Nov 1 Fitter : 1
Assist for inspection 27-Nov 27-Nov 1 Safety : 1
Close Closure and De-spading 28-Nov 28-Nov 1 Helper : 4
Scaffolder : 2
2 8477828 INS-VES A-6360/IN-MAJ ( Gas Cooler) 24-Nov 1-Dec 8
Spading 24-Nov 25-Nov 2
Open Plug and Internal cleaning 25-Nov 26-Nov 2
Assist for inspection 26-Nov 28-Nov 3
Close Plug 29-Nov 30-Nov 2
De-spading 30-Nov 1-Dec 2

3 8477829 INS-VES A-6380/IN-MAJ ( Condensate Cooler) 24-Nov 1-Dec 8


Spading 24-Nov 25-Nov 2
Open Plug and Internal cleaning 25-Nov 26-Nov 2
Assist for inspection 26-Nov 28-Nov 3
Close Plug 29-Nov 30-Nov 2
De-spading 30-Nov 1-Dec 2

4 8477741 INS-VES D-6430/IN-MAJ ( Oily Water system Close Drain 24-Nov 1-Dec 8 MEINDO-2
Spading and open manhole 24-Nov 25-Nov 2 Supervisor : 1
Internal cleaning 26-Nov 28-Nov 3 Fitter : 1 Confined space
Assist for inspection 28-Nov 29-Nov 2 Safety : 1 requirement
Repair (if any) 29-Nov 30-Nov 2 Helper : 4
Closed manhole & de-spading 30-Nov 1-Dec 2 Scaffolder : 1

5 8477742 INS-VES E-6160/IN-MAJ ( Feed Preheater) 24-Nov 30-Nov 7 Arung-1


Spading and open manhole 24-Nov 25-Nov 2 Supervisor : 1
Internal cleaning 25-Nov 26-Nov 2 Fitter : 1
Assist for inspection 26-Nov 28-Nov 3 Safety : 1
CSU SHUTDOWN 2019

Team
No Item Start Finish Duration
CTR
Repair (if any) 28-Nov 30-Nov 3 Helper : 4
Closed manhole & de-spading 29-Nov 30-Nov 2 Scaffolder : 1

6 8441580 INS-VES D-6440/IN-MAJ ( Flare Ko Drum) 24-Nov 1-Dec 8 MENDO-3


Open insulation at spading point and manhole area. 24-Nov 24-Nov 1 Supervisor : 1
Spading and open manhole 24-Nov 25-Nov 2 Fitter : 1 Confined space
Internal cleaning 25-Nov 26-Nov 2 Safety : 1 requirement
Assist for inspection 26-Nov 27-Nov 2 Helper : 3
Repair (if any) 27-Nov 28-Nov 2
Closed manhole & de-spading 28-Nov 29-Nov 2

7 8477830 INS-VES D-6200/IN-MAJ ( Water Condensate Separator) 24-Nov 2-Dec 9 Arung-2 Arung-3
Spading and open Manhole 24-Nov 25-Nov 2 Supervisor : 1 Supervisor : 1
Turbexing and Internal cleaning 25-Nov 29-Nov 5 Fitter : 1 Fitter : 1
Install scafolding 29-Nov 29-Nov 1 Safety : 1 Safety : 1
Assist for inspection 29-Nov 30-Nov 2 Helper : 4 Helper : 4
Repair (if any) 30-Nov 2-Dec 3 Scaffolder : 1 Scaffolder : 1

Assist for inspection after repair 30-Nov 1-Dec 2


Confined space Confined space
Remove scafolding 1-Dec 1-Dec 1 requirement requirement
Closed manhole & de-spading 1-Dec 2-Dec 2
CSU SHUTDOWN 2019

Team
No Item Start Finish Duration
CTR
8 8443232 INS-FLARE FL-6450A/IN-MAJ ( Flare Package) 24-Nov 29-Nov 6 Arung-4
Spading 24-Nov 25-Nov 2 Foreman : 1
Assist for inspection 26-Nov 27-Nov 2 Fitter : 1
Repair (if any) 27-Nov 28-Nov 2 Safety : 1
Closed manhole & de-spading 28-Nov 29-Nov 2 Helper : 3

9 8441581 INS-VES D-6455/IN-MAJ ( Water Seal Drum) 24-Nov 1-Dec 8 Arung-5


Spading and open manhole 24-Nov 25-Nov 2 Supervisor : 1
Internal cleaning 25-Nov 28-Nov 4 Fitter : 1 Confined space
Assist for inspection 28-Nov 29-Nov 2 Safety : 1 requirement
Repair (if any) 29-Nov 30-Nov 2 Helper : 4
Closed manhole & de-spading 30-Nov 1-Dec 2

10 7243187 INS-PIP-REP_2" Drain of 20-DR-B03-6326 24-Nov 2-Dec 9 Arung-6


Spading activity 24-Nov 25-Nov 2 Supervisor : 1
Cold cutting 26-Nov 27-Nov 1 Fitter : 1
Cleaning and install rubber plug 27-Nov 28-Nov 2 Safety : 1
Install new spool and NDT 28-Nov 30-Nov 3 Welder : 2
Depasading 1-Dec 2-Dec 2 Helper : 5

11 8478280 INS-VES V-870/IN-MAJ ( 2nd stage Separator) 24-Nov 2-Dec 9 Arung-11 Arung-12
Spading and open Manhole 24-Nov 25-Nov 2 Supervisor : 1 Supervisor : 1
Turbexing and Internal cleaning 25-Nov 29-Nov 5 Fitter : 1 Fitter : 1
Install scafolding 29-Nov 29-Nov 1 Safety : 1 Safety : 1
Assist for inspection 29-Nov 1-Dec 3 Helper : 5 Helper : 5
Repair (if any) 1-Dec 3-Dec 3
Assist for inspection after repair 3-Dec 4-Dec 2
Remove scafolding 1-Dec 1-Dec 1
Closed manhole & de-spading 1-Dec 2-Dec 2
U SHUTDOWN 2019

Team Date
CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29 11/30 12/1 12/2 12/3

0 0 0 110 110 110 0 0 0 0 0


0 0 0 110 0 0 0 0 0 0 0
0 0 0 110 0 0 0 0 0 0 0
0 0 0 0 110 0 0 0 0 0 0
0 0 0 0 0 110 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 110 110 110 110 110 110 110 110 0 0
0 110 110 0 0 0 0 0 0 0 0
0 0 110 110 0 0 0 0 0 0 0
Anto
0 0 0 110 110 110 0 0 0 0 0
Sriwijayanto
0 0 0 0 0 0 110 110 0 0 0
0 0 0 0 0 0 0 110 110 0 0
0 0 0 0 0 0 0 0 0 0 0
0 110 110 110 110 110 110 110 110 0 0
0 110 110 0 0 0 0 0 0 0 0
0 0 110 110 0 0 0 0 0 0 0
0 0 0 110 110 110 0 0 0 0 0
0 0 0 0 0 0 110 110 0 0 0
0 0 0 0 0 0 0 110 110 0 0
0 0 0 0 0 0 0 0 0 0 0
0 110 110 110 110 110 110 110 110 0 0
0 110 110 0 0 0 0 0 0 0 0
0 0 0 110 110 110 0 0 0 0 0
Akbar
0 0 0 0 0 110 110 0 0 0 0
0 0 0 0 0 0 110 110 0 0 0
0 0 0 0 0 0 0 110 110 0 0

0 110 110 110 110 110 110 110 0 0 0


0 110 110 0 0 0 0 0 0 0 0
0 0 110 110 0 0 0 0 0 0 0
Chirul Anam
0 0 0 110 110 110 0 0 0 0 0
U SHUTDOWN 2019

Team Date
Chirul Anam
CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29 11/30 12/1 12/2 12/3

0 0 0 0 0 110 110 110 0 0 0


0 0 0 0 0 0 110 110 0 0 0

0 110 110 110 110 110 110 110 110 0 0


110 0 0 0 0 0 0 0 0 0
0 110 110 0 0 0 0 0 0 0 0
Heriwanto 0 0 110 110 0 0 0 0 0 0 0
0 0 0 110 110 0 0 0 0 0 0
0 0 0 0 110 110 0 0 0 0 0
0 0 0 0 0 110 110 0 0 0 0

0 110 110 110 110 110 110 110 110 110 0


0 110 110 0 0 0 0 0 0 0 0
0 0 110 110 110 110 110 0 0 0 0
0 0 0 0 0 0 110 0 0 0 0

Rinaldi / Ari 0 0 0 0 0 0 110 110 0 0 0


Gunawan 0 0 0 0 0 0 0 110 110 110 0

0 0 0 0 0 0 0 110 110 0 0

0 0 0 0 0 0 0 0 110 0 0
0 0 0 0 0 0 0 0 110 110 0
0 0 0 0 0 0 0 0 0 0 0
U SHUTDOWN 2019

Team Date
CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29 11/30 12/1 12/2 12/3

0 110 110 110 110 110 110 0 0 0 0


0 110 110 0 0 0 0 0 0 0 0
Haeromi 0 0 0 110 110 0 0 0 0 0 0
0 0 0 0 110 110 0 0 0 0 0
0 0 0 0 0 110 110 0 0 0 0

0 110 110 110 110 110 110 110 110 0 0


0 110 110 0 0 0 0 0 0 0 0
0 0 110 110 110 110 0 0 0 0 0
Supadiono
0 0 0 0 0 110 110 0 0 0 0
0 0 0 0 0 0 110 110 0 0 0
0 0 0 0 0 0 0 110 110 0 0
0 0 0 0 0 0 0 0 0 0 0
0 110 110 110 110 110 110 110 110 110 0
0 110 110 0 0 0 0 0 0 0 0
0 0 0 110 110 0 0 0 0 0 0
Gede Andi D
0 0 0 0 110 110 0 0 0 0 0
0 0 0 0 0 110 110 110 0 0 0
0 0 0 0 0 0 0 0 110 110 0
0 0 0 0 0 0 0 0 0 0 0
0 110 110 110 110 110 110 110 110 110 0
0 110 110 0 0 0 0 0 0 0 0
0 0 110 110 110 110 110 0 0 0 0
0 0 0 0 0 0 110 0 0 0 0
CST Mech-09 / CST
0 0 0 0 0 0 110 110 110 0 0
Mech-10
0 0 0 0 0 0 0 0 110 110 110
0 0 0 0 0 0 0 0 0 0 110
0 0 0 0 0 0 0 0 110 0 0
0 0 0 0 0 0 0 0 110 110 0
0 0 0 0 0 0 0 0 0 0 0
CSU SHUTDOWN 2019

Team Da
No Item Start Finish Duration
CTR 11/23 11/24 11/25 11/26

1 8478627 INS-VES F-6410B/IN-MAJ ( Filter) 26-Nov 28-Nov 3 0 0 0 110


Spading 26-Nov 26-Nov 1 0 0 0 110
Open Closure and Internal cleaning 26-Nov 26-Nov 1 0 0 0 110
Assist for inspection 27-Nov 27-Nov 1 0 0 0 0
Close Closure and De-spading 28-Nov 28-Nov 1 0 0 0 0
0 0 0 0
2 8477828 INS-VES A-6360/IN-MAJ ( Gas Cooler) 24-Nov 1-Dec 8 0 110 110 110
Spading 24-Nov 25-Nov 2 0 110 110 0
Open Plug and Internal cleaning 25-Nov 26-Nov 2 0 0 110 110
Assist for inspection 26-Nov 28-Nov 3 MEINDO-1 0 0 0 110
Close Plug 29-Nov 30-Nov 2 0 0 0 0
De-spading 30-Nov 1-Dec 2 0 0 0 0
0 0 0 0
3 8477829 INS-VES A-6380/IN-MAJ ( Condensate Cooler) 24-Nov 1-Dec 8 0 110 110 110
Spading 24-Nov 25-Nov 2 0 110 110 0
Open Plug and Internal cleaning 25-Nov 26-Nov 2 0 0 110 110
Assist for inspection 26-Nov 28-Nov 3 0 0 0 110
Close Plug 29-Nov 30-Nov 2 0 0 0 0
De-spading 30-Nov 1-Dec 2 0 0 0 0
0 0 0 0
4 8477741 INS-VES D-6430/IN-MAJ ( Oily Water system Close Drain 24-Nov 1-Dec 8 0 110 110 110
Spading and open manhole 24-Nov 25-Nov 2 0 110 110 0
Internal cleaning 26-Nov 28-Nov 3 0 0 0 110
MEINDO-2
Assist for inspection 28-Nov 29-Nov 2 0 0 0 0
Repair (if any) 29-Nov 30-Nov 2 0 0 0 0
Closed manhole & de-spading 30-Nov 1-Dec 2 0 0 0 0

5 8441580 INS-VES D-6440/IN-MAJ ( Flare Ko Drum) 24-Nov 1-Dec 8 0 110 110 110
Open insulation at spading point and manhole area. 24-Nov 24-Nov 1 110 0 0
Spading and open manhole 24-Nov 25-Nov 2 0 110 110 0
MENDO-3
CSU SHUTDOWN 2019

Team Da
No Item Start Finish Duration
CTR 11/23 11/24 11/25 11/26

Internal cleaning 25-Nov 26-Nov 2 MENDO-3 0 0 110 110


Assist for inspection 26-Nov 27-Nov 2 0 0 0 110
Repair (if any) 27-Nov 28-Nov 2 0 0 0 0
Closed manhole & de-spading 28-Nov 29-Nov 2 0 0 0 0
HUTDOWN 2019

Date
11/27 11/28 11/29 11/30 12/1 12/7

110 110 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
110 0 0 0 0 0
0 110 0 0 0 0
0 0 0 0 0 0
110 110 110 110 110 0
0 0 0 0 0 0
0 0 0 0 0 0
110 110 0 0 0 0
0 0 110 110 0 0
0 0 0 110 110 0
0 0 0 0 0 0
110 110 110 110 110 0
0 0 0 0 0 0
0 0 0 0 0 0
110 110 0 0 0 0
0 0 110 110 0 0
0 0 0 110 110 0
0 0 0 0 0 0
110 110 110 110 110 0
0 0 0 0 0 0
110 110 0 0 0 0
0 110 110 0 0 0
0 0 110 110 0 0
0 0 0 110 110 0

110 110 110 110 110 0


0 0 0 0 0 0
0 0 0 0 0 0
HUTDOWN 2019

Date
11/27 11/28 11/29 11/30 12/1 12/7

0 0 0 0 0 0
110 0 0 0 0 0
110 110 0 0 0 0
0 110 110 0 0 0
CSU SHUTDOWN 2019

No Item Start Finish

1 8478627 INS-VES F-6410B/IN-MAJ ( Filter) 26-Nov 28-Nov


Spading 26-Nov 26-Nov
Open Closure and Internal cleaning 26-Nov 26-Nov
Assist for inspection 27-Nov 27-Nov
Close Closure and De-spading 28-Nov 28-Nov

1 8478627 INS-VES F-6410B/IN-MAJ ( Filter) 2-Dec 4-Dec


Spading 2-Dec 2-Dec
Open Closure and Internal cleaning 2-Dec 2-Dec
Assist for inspection 3-Dec 3-Dec
Close Closure and De-spading 4-Dec 4-Dec

2 8477828 INS-VES A-6360/IN-MAJ ( Gas Cooler) 24-Nov 1-Dec


Spading 24-Nov 25-Nov
Open Plug and Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 28-Nov
Close Plug 29-Nov 30-Nov
De-spading 30-Nov 1-Dec

2 8477828 INS-VES A-6360/IN-MAJ ( Gas Cooler) 24-Nov 1-Dec


Spading 24-Nov 25-Nov
Open Plug and Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 28-Nov
Close Plug 29-Nov 30-Nov
De-spading 30-Nov 1-Dec

3 8477829 INS-VES A-6380/IN-MAJ ( Condensate Cooler) 24-Nov 1-Dec


Spading 24-Nov 25-Nov
Open Plug and Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 28-Nov
Close Plug 29-Nov 30-Nov
De-spading 30-Nov 1-Dec

3 8477829 INS-VES A-6380/IN-MAJ ( Condensate Cooler) 24-Nov 1-Dec


Spading 24-Nov 25-Nov
Open Plug and Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 28-Nov
Close Plug 29-Nov 30-Nov
De-spading 30-Nov 1-Dec

4 8477741 INS-VES D-6430/IN-MAJ ( Oily Water system Close Drain 24-Nov 1-Dec
Spading and open manhole 24-Nov 25-Nov
Internal cleaning 26-Nov 28-Nov
Assist for inspection 28-Nov 29-Nov
Repair (if any) 29-Nov 30-Nov
Closed manhole & de-spading 30-Nov 1-Dec
CSU SHUTDOWN 2019

No Item Start Finish


4 8477741 INS-VES D-6430/IN-MAJ ( Oily Water system Close Drain 24-Nov 1-Dec
Spading and open manhole 24-Nov 25-Nov
Internal cleaning 26-Nov 28-Nov
Assist for inspection 28-Nov 29-Nov
Repair (if any) 29-Nov 30-Nov
Closed manhole & de-spading 30-Nov 1-Dec

4A xxxxxxx INTERNAL COATING AT D-6430 ( if Any) 1-Dec 5-Dec


Blasting and primer 1-Dec 2-Dec
Paintiing Top Coat 3-Dec 4-Dec
Curing Time 5-Dec 5-Dec

4A 7154893 INTERNAL COATING AT D-6430 18-Nov 20-Nov


Blasting and primer 18-Nov 18-Nov
Paintiing Top Coat 19-Nov 19-Nov
Curing Time 20-Nov 20-Nov

5 8477742 INS-VES E-6160/IN-MAJ ( Feed Preheater) 24-Nov 30-Nov


Spading and open manhole 24-Nov 25-Nov
Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 28-Nov
Repair (if any) 28-Nov 30-Nov
Closed manhole & de-spading 29-Nov 30-Nov

5 8477742 INS-VES E-6160/IN-MAJ ( Feed Preheater) 24-Nov 30-Nov


Spading and open manhole 24-Nov 25-Nov
Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 28-Nov
Repair (if any) 28-Nov 30-Nov
Closed manhole & de-spading 29-Nov 30-Nov

6 8441580 INS-VES D-6440/IN-MAJ ( Flare Ko Drum) 24-Nov 1-Dec


Open insulation at spading point and manhole area. 24-Nov 24-Nov
Spading and open manhole 24-Nov 25-Nov
Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 27-Nov
Repair (if any) 27-Nov 28-Nov
Closed manhole & de-spading 28-Nov 29-Nov
CSU SHUTDOWN 2019

No Item Start Finish


6 8441580 INS-VES D-6440/IN-MAJ ( Flare Ko Drum) 24-Nov 1-Dec
Open insulation at spading point and manhole area. 24-Nov 24-Nov
Spading and open manhole 24-Nov 25-Nov
Internal cleaning 25-Nov 26-Nov
Assist for inspection 26-Nov 27-Nov
Repair (if any) 27-Nov 28-Nov
Closed manhole & de-spading 28-Nov 29-Nov

7 8477830 INS-VES D-6200/IN-MAJ ( Water Condensate Separator) 24-Nov 2-Dec


Spading and open Manhole 24-Nov 25-Nov
Turbexing and Internal cleaning 25-Nov 29-Nov
Install scafolding 29-Nov 29-Nov
Assist for inspection 29-Nov 30-Nov
Repair (if any) 30-Nov 2-Dec
Assist for inspection after repair 30-Nov 1-Dec
Remove scafolding 1-Dec 1-Dec
Closed manhole & de-spading 1-Dec 2-Dec

7 8477830 INS-VES D-6200/IN-MAJ ( Water Condensate Separator) 24-Nov 2-Dec


Spading and open Manhole 24-Nov 25-Nov
Turbexing and Internal cleaning 25-Nov 29-Nov
Install scafolding 29-Nov 29-Nov
Assist for inspection 29-Nov 30-Nov
Repair (if any) 30-Nov 2-Dec
Assist for inspection after repair 30-Nov 1-Dec
Remove scafolding 1-Dec 1-Dec
Closed manhole & de-spading 1-Dec 2-Dec

8 8443232 INS-FLARE FL-6450A/IN-MAJ ( Flare Package) 24-Nov 29-Nov


Spading 24-Nov 25-Nov
Assist for inspection 26-Nov 27-Nov
Repair (if any) 27-Nov 28-Nov
Closed manhole & de-spading 28-Nov 29-Nov

8 8443232 INS-FLARE FL-6450A/IN-MAJ ( Flare Package) 24-Nov 29-Nov


Spading 24-Nov 25-Nov
Assist for inspection 26-Nov 27-Nov
Repair (if any) 27-Nov 28-Nov
Closed manhole & de-spading 28-Nov 29-Nov

9 8441581 INS-VES D-6455/IN-MAJ ( Water Seal Drum) 24-Nov 1-Dec


Spading and open manhole 24-Nov 25-Nov
Internal cleaning 25-Nov 28-Nov
Assist for inspection 28-Nov 29-Nov
Repair (if any) 29-Nov 30-Nov
Closed manhole & de-spading 30-Nov 1-Dec

9 8441581 INS-VES D-6455/IN-MAJ ( Water Seal Drum) 24-Nov 1-Dec


CSU SHUTDOWN 2019

No Item Start Finish


Spading and open manhole 24-Nov 25-Nov
Internal cleaning 25-Nov 28-Nov
Assist for inspection 28-Nov 29-Nov
Repair (if any) 29-Nov 30-Nov
Closed manhole & de-spading 30-Nov 1-Dec

10 7243187 INS-PIP-REP_2" Drain of 20-DR-B03-6326 24-Nov 2-Dec


Spading activity 24-Nov 25-Nov
Cold cutting 26-Nov 27-Nov
Cleaning and install rubber plug 27-Nov 28-Nov
Install new spool and NDT 28-Nov 30-Nov
Depasading 1-Dec 2-Dec

10 7243187 INS-PIP-REP_2" Drain of 20-DR-B03-6326 24-Nov 2-Dec


Spading activity 24-Nov 25-Nov
Cold cutting 26-Nov 27-Nov
Cleaning and install rubber plug 27-Nov 28-Nov
Install new spool and NDT 28-Nov 30-Nov
Depasading 1-Dec 2-Dec

11 8478280 INS-VES V-870/IN-MAJ ( 2nd stage Separator) 24-Nov 2-Dec


Spading and open Manhole 24-Nov 25-Nov
Turbexing and Internal cleaning 25-Nov 29-Nov
Install scafolding 29-Nov 29-Nov
Assist for inspection 29-Nov 1-Dec
Repair (if any) 1-Dec 3-Dec
Assist for inspection after repair 3-Dec 4-Dec
Remove scafolding 1-Dec 1-Dec
Closed manhole & de-spading 1-Dec 2-Dec

11 8478280 INS-VES V-870/IN-MAJ ( 2nd stage Separator) 24-Nov 2-Dec


Spading and open Manhole 24-Nov 25-Nov
Turbexing and Internal cleaning 25-Nov 29-Nov
Install scafolding 29-Nov 29-Nov
Assist for inspection 29-Nov 1-Dec
Repair (if any) 1-Dec 3-Dec
Assist for inspection after repair 3-Dec 4-Dec
Remove scafolding 1-Dec 1-Dec
Closed manhole & de-spading 1-Dec 2-Dec
Team Date
Duration
CTR CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29

3 Arung-1 0 0 0 110 110 110 0


1 Fitter : 1 0 0 0 110 0 0 0
1 Safety : 1 0 0 0 110 0 0 0
1 Helper : 3 0 0 0 0 110 0 0
1 0 0 0 0 0 110 0
0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
1 0 0 0 0 0
( No Repair)
1 0 0 0 0 0

8 0 110 110 110 110 110 110


2 0 110 110 0 0 0 0
2 0 0 110 110 0 0 0
3 0 0 0 110 110 110 0
CST Mech 1
2 0 0 0 0 0 0 110
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
8 0 100 100 100 100 100 100
2 0 100 100 0 0 0 0
2 0 0 100 100 0 0 0
3 0 0 0 100 100
( No Repair)
2 0 0 0 0 0
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
8 0 110 110 110 110 110 110
2 0 110 110 0 0 0 0
2 0 0 110 110 0 0 0
3 0 0 0 110 110 110 0
2 0 0 0 0 0 0 110
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
8 0 100 100 100 100 100 100
2 0 100 100 0 0 0 0
2 0 0 100 100 0 0 0
3 0 0 0 100 100
( No Repair)
2 0 0 0 0 0
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
8 Arung 2 0 110 110 110 110 110 110
2 Supervisor : 1 0 110 110 0 0 0 0
3 Fitter : 1 0 0 0 110 110 110 0
2 Safety : 1 0 0 0 0 0 110 110
2 Helper : 4 0 0 0 0 0 0 110
2 Scaffolder : 1 0 0 0 0 0 0 0
Team Date
Duration
CTR CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29

8 0 100 100 100 100 100 100


2 0 100 100 0 0 0 0
CST Mech-2
3 0 0 0 100 100 100 0
2 0 0 0 0 0 100 100
2 0 0 ( No Repair) 0 100
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
5 0
1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
1

3 DMG PAINTING-3 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
0 0 0 0 0 0 0
7 Arung-3 0 110 110 110 110 110 110
2 Supervisor : 1 0 110 110 0 0 0 0
2 Fitter : 1 0 0 110 110 0 0 0
CST Mech-3
3 Safety : 1 0 0 0 110 110 110 0
3 Helper : 4 0 0 0 0 0 110 110
2 Scaffolder : 1 0 0 0 0 0 0 110

7 0 110 110 110 110 110 110


2 0 110 110 0 0 0 0
2 0 0 110 110 0 0 0
CST Mech-3
3 0 0 0 110 110 110 0
3 0 0 0 0 0 110 110
2 0 0 0 0 0 0 110

8 Arung-4 0 110 110 110 110 110 110


1 Supervisor : 1 110 0 0 0 0 0
2 Fitter : 1 0 110 110 0 0 0 0
2 Safety : 1 CST E/I - 1 0 0 110 110 0 0 0
2 Helper : 3 0 0 0 110 110 0 0
2 0 0 0 0 110 110 0
2 0 0 0 0 0 110 110
Team Date
Duration
CTR CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29

8 0 100 100 100 100 100 100


1 0 100 0 0 0 0 0
2 0 100 100 0 0 0 0
2 0 0 100 100 0 0 0
2 0 0 0 100 ( No Repair)
2 0 0 0 0 100 100 0
2 0 0 0 0 0 100 100

9 Arung-5 Arung-6 0 110 110 110 110 110 110


2 Supervisor : 1 Supervisor : 1 0 110 110 0 0 0 0
5 Fitter : 1 Fitter : 1 0 0 110 110 110 110 110
1 Safety : 1 Safety : 1 0 0 0 0 0 0 110
2 Helper : 4 Helper : 4 CST Mech-4/5 0 0 0 0 0 0 110
3 Scaffolder : 1 Scaffolder : 1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
DNG-5 Anji /Jarot
0 0 0 0 0 0 0
(day) (day shift)
9 0 100 100 100 100 100 100
DMG-6 Ari G
2 (night shift) 0 100 100 0 0 0 0
(night)
5 0 0 100 100 100 100 100
1 0 0 0 0 0 0 100
2 0 0 0 0 0 0 100
3 0 0 0 0
( No Repair)
2 0 0 0 0
1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
6 Arung-7 0 110 110 110 110 110 110
2 Foreman : 1 0 110 110 0 0 0 0
2 Fitter : 1 CST E/I -2 0 0 0 110 110 0 0
2 Safety : 1 0 0 0 0 110 110 0
2 Helper : 3 0 0 0 0 0 110 110

6 0 100 100 100 100 100 100


2 0 100 100 0 0 0 0
2 0 0 0 100 100 0 0
2 0 0 0 0 100 100 0
2 0 0 0 0 0 100 100
0 0 0 0 0 0 0
8 Arung-8 0 110 110 110 110 110 110
2 Supervisor : 1 0 110 110 0 0 0 0
4 Fitter : 1 0 0 110 110 110 110 0
CST Mech-6
2 Safety : 1 0 0 0 0 0 110 110
2 Helper : 4 0 0 0 0 0 0 110
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
8 0 100 100 100 100 100 100
Team Date
Duration
CTR CST 11/23 11/24 11/25 11/26 11/27 11/28 11/29

2 0 100 100 0 0 0 0
4 0 0 100 100 100 100 0
2 0 0 0 0 0 100 100
2 0 0 0 ( No Repair) 100
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
9 Arung-9 Arung-10 0 110 110 110 110 110 110
2 Supervisor : 1 Supervisor : 1 0 110 110 0 0 0 0
1 Fitter : 1 Fitter : 1 CST Mech-7 / CST 0 0 0 110 110 0 0
2 Safety : 1 Safety : 1 Mech-8 0 0 0 0 110 110 0
3 Welder : 2 Welder : 2 0 0 0 0 0 110 110
2 Helper : 5 Helper : 5 0 0 0 0 0 0 0
0 0 0 0 0 0 0
9 0 100 100 100 100 100 100
2 0 100 100 0 0 0 0
1 0 0 0 100 100 0 0
2 0 0 0 0 100 100 0
3 0 0 0 ( No Repair) 100
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
9 Arung-11 Arung-12 0 110 110 110 110 110 110
2 Supervisor : 1 Supervisor : 1 0 110 110 0 0 0 0
5 Fitter : 1 Fitter : 1 0 0 110 110 110 110 110
1 Safety : 1 Safety : 1 0 0 0 0 0 0 110
CST Mech-09 / CST
3 Helper : 5 Helper : 5 Mech-10 0 0 0 0 0 0 110
3 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
9 0 110 110 110 110 110 110
2 0 110 110 0 0 0 0
5 0 0 110 110 110 110 110
1 0 0 0 0 0 0 110
3 0 0 0 0 0 0 110
3 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
1 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Date
11/30 12/1 12/2 12/3 12/4 12/5 12/6 12/7

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 110 110 110 0 0 0
0 0 110 0 0 0 0 0
0 0 110 0 0 0 0 0
0 0 110 0 0 0 0
( No Repair)
0 0 0 110 0 0 0

110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
( No Repair)
0 0 0 0 0 0 0
100 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
( No Repair)
0 0 0 0 0 0 0
100 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
Date
11/30 12/1 12/2 12/3 12/4 12/5 12/6 12/7

100 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 0 0 0 0 0 0 0
100 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 110 110 110 110
0 110 110 0 0 0 0 0
0 0 0 110 110 0 0 0
0 0 0 0

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0

110 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0

110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
Date
11/30 12/1 12/2 12/3 12/4 12/5 12/6 12/7

100 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0

110 110 110 0 0 0 0 0


0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 110 110 0 0 0 0 0
110 110 0 0 0 0 0 0
0 110 0 0 0 0 0 0
0 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
100 100 100 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 0 0 0 0 0 0 0
100 100 100 0 0 0 0 0
100 100 0 0 0 0 0 0
0 100 0 0 0 0 0 0
0 100 100 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 100 0 0 0 0 0 0
Date
11/30 12/1 12/2 12/3 12/4 12/5 12/6 12/7

0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 0 0 0 0 0 0 0
100 100 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 0 0 0 0 0 0 0
0 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
100 100 100 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
100 0 0 0 0 0 0 0
0 100 100 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 110 110 110 0 0 0 0
0 0 0 110 110 0 0 0
0 110 0 0 0 0 0 0
0 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
110 110 0 0 0 0 0 0
0 110 110 110 0 0 0 0
0 0 0 110 110 0 0 0
0 110 0 0 0 0 0 0
0 110 110 0 0 0 0 0
0 0 0 0 0 0 0 0
WORK PERMIT CSU SHUTDOWN 2019

No Work Permit List : Permit

1 8478627 INS-VES F-6410B/IN-MAJ


1 Mobilisasi material and equipment to H-6320 HWP
2 Install and modification scaffolding for internal claning H-6320. CWP
3 Spading at H-6320 CWP
4 Open manhole at H-6320. CWP
5 Closed manhole and de-spading at H-6320. CWP
6 De-spading at H-6320 CWP
7 Dismantle scaffolding after internal cleaning H-6320. CWP
8 Assist leak test after internal inspection H-6320 CWP
9 De-mobilisasi material and equipment to H-6320 HWP

2/3 8477828 INS-VES A-6360/IN-MAJ & 8477829 INS-VES A-6380/IN-MAJ


1 Mobilisasi material and equipment to A-6360 & A-6380 HWP
2 Install and modification scaffolding for internal claning at A-6360 & A-6380 CWP
3 Spading work at A-6360 & A-6380 CWP
4 De-spading at A-6360 & A-6380 CWP
5 Dismantle scaffolding after internal cleaning at A-6360 & A-6380 CWP
6 Assist leak test after internal inspection A-6360 & A-6380 CWP
7 De-mobilisasi material and equipment to A-6360 & A-6380 HWP

4 8477741 INS-VES D-6430/IN-MAJ


1 Install and modification scaffolding for internal claning at D-6430.
2 Spading at D-6430. CWP
3 Open end closure at at D-6430. CWP
4 External and Internal cleaning at at D-6430. CWP
5 Closed end closure & de-spading at D-6430. CWP
6 De-spading at D-6430. CWP
6 Dismantle scaffolding after internal claning at D-6430. CWP

5 8477742 INS-VES E-6160/IN-MAJ


1 Mobilisasi/De-mobilisasi material and equipment at E-6160. HWP
2 Install and modification scaffolding for internal claning at E-6160. CWP
3 Spading at E-6160. CWP
4 Open Manhole at E-6160. CWP
5 External and Internal cleaning at E-6160. CWP
6 Closed manhole and de-spading at E-6160. CWP
7 Dismantle scaffolding after internal claning at E-6160. CWP
8 De-mobilisasi material and equipment to E-6160 HWP

6 8477830 INS-VES D-6200/IN-MAJ


1 Mobilisasi/De-mobilisasi material and equipment to D-6200 HWP
2 Install and modification scaffolding for internal claning at D-6200. CWP
3 Spading at D-6200 CWP
4 Open Manhole and Turbexing at D-6200. CWP
5 External and Internal cleaning at D-6200. CWP
6 Install and modification scafolding inside Vessel at D-6200. CWP
WORK PERMIT CSU SHUTDOWN 2019

No Work Permit List : Permit


7 Dismantle scaffolding inside Vessel after inspection at D-6200. CWP
8 Closed manhole and de-spading at D-6200. CWP
9 Dismantle scaffolding after internal claning at D-6200. CWP
7 Assist leak test after internal inspection D-6200. CWP
8 De-mobilisasi material and equipment to D-6200. HWP

7 8443232 INS-FLARE FL-6450A/IN-MAJ


1 Install and modification scaffolding for internal claning at D-6450A CWP
2 Hotbolting for internal inspection at D-6450A CWP
3 Spading at D-6450A CWP
4 open manhole at D-6450A CWP
5 External and Internal cleaning at D-6450A CWP
6 Closed manhole & de-spading at D-6450A CWP
7 De-spading at D-6450A CWP
8 Remove scaffolding for internal claning at D-6450A CWP
9 Repair Flare after inspection at FL-6450A. HWP

8 8441580 INS-VES D-6440/IN-MAJ


1 Mobilisasi/De-mobilisasi material and equipment to D-6440. HWP
2 Install and modification scaffolding for internal claning at D-6440. CWP
3 Hot bolting before spading at D-6440. CWP
4 Spading at D-6440. CWP
5 Open end closure at at D-6440. CWP
6 External and Internal cleaning at at D-6440. CWP
7 Closed end closure & de-spading at D-6440. CWP
8 De-spading at D-6440. CWP
8 Dismantle scaffolding after internal claning at D-6440. CWP
10 De-mobilisasi material and equipment to D-6440 HWP

9 8441581 INS-VES D-6455/IN-MAJ


1 Mobilisasi/De-mobilisasi material and equipment to D-6445 HWP
2 Install and modification scaffolding for internal claning at D-6445. CWP
3 Hotbolting for internal inspection at D-6445. CWP
4 Spading at D-6445. CWP
5 open manhole at D-6445 CWP
6 External and Internal cleaning at D-6445 CWP
7 Closed manhole & de-spading at D-6445 CWP
8 De-spading at D-6445 CWP
9 Dismantle scaffolding after internal claning at D-6445 CWP
10 De-mobilisasi material and equipment to D-6445 HWP
TDOWN 2019
updated :
Date
Days Remarks
Execution Closed

7
7
7
7
7
7
7
7
7

5
5
7
7
7
3
4

7
7
7
7
7
7

7
7
5
7
5
7
7
5

5
5
3.5
3.5
3.5
2.5
TDOWN 2019
updated :
Date
Days Remarks
Execution Closed

2.5
7
7
7
7

7
7
7
7
7
7
7
7
2

7
7
7
7
7
7
7
7
7
7

7
7
7
7
7
7
7
7
7
7
WORK ORDER STATUS CSU SHUTDOWN 2019

No Discription

1 8478627 INS-VES F-6410B/IN-MAJ

2 8477828 INS-VES A-6360/IN-MAJ

3 8477829 INS-VES A-6380/IN-MAJ

4 8477741 INS-VES D-6430/IN-MAJ

5 8477742 INS-VES E-6160/IN-MAJ

6 8477830 INS-VES D-6200/IN-MAJ

7 8443232 INS-FLARE FL-6450A/IN-MAJ

8 8441580 INS-VES D-6440/IN-MAJ

9 8441581 INS-VES D-6455/IN-MAJ

10 7243187 INS-PIP-REP_2" Drain of 20-DR-B03-6326